| issue date = 11/20/2015 | | issue date = 11/20/2015 | ||
| title = Public Meeting Slides- Draft JLD-ISG-2012-01 Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | | title = Public Meeting Slides- Draft JLD-ISG-2012-01 Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | ||
| author name = Montgomery C | | author name = Montgomery C | ||
| author affiliation = NRC/NRR/DPR | | author affiliation = NRC/NRR/DPR | ||
| addressee name = Adams A | | addressee name = Adams A | ||
Line 12: | Line 12: | ||
| document type = Memoranda | | document type = Memoranda | ||
| page count = 8 | | page count = 8 | ||
| project = | |||
| stage = Draft Meeting | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E E. Bowman Special Advisor, Japan Lessons-Learned Division | |||
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments. | |||
: 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them. | |||
2 | |||
Availability for Comment | |||
* Federal Register Notice published November 10 10, 2015 (80 FR 69703) | |||
* JLD-ISG-2012-01, Draft Revision 1 at ML15294A078 | |||
* Comment period through December 10, 2015 g g docket ID: NRC- | |||
* www.regulations.gov 2012-0068 3 | |||
Endorsement of Industry Guidance with ith Clarifications Cl ifi ti andd Additions Additi NEI 12-06,, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4 | |||
Reformatted to Align with DG-1301 | |||
: 1. Development and Implementation Process | |||
: 2. Equipment Capacity | |||
: 3. Reasonable Protection | |||
: 4. Equipment Maintenance 5 | |||
: 5. Configuration Control | |||
: 6. Treatment of Reevaluated Hazards | |||
: 7. G id Guidance ffor AP1000 D Design i | |||
5 | |||
NEI 12-06 New Elements | |||
* Resolution of generic concerns from reviews | |||
* Appendix E validation process 6 | |||
Mitigating Strategies Assessments | |||
* Addressing reevaluated seismic and flooding hazards under March 12 12, 2012 request for information | |||
- FLEX and d Modified M difi d FLEX | |||
- Alternative Mitigating Strategies | |||
- Targeted Hazard Mitigating Strategies 7 | |||
Mitigating Strategies Assessments, C ti Continued d | |||
* Flooding - NEI 12 12-06, 06, Appendix G | |||
* Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in ISG §6.1 to solicit comments 8 | |||
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E E. Bowman Special Advisor, Japan Lessons-Learned Division | |||
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments. | |||
: 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them. | |||
2 | |||
Availability for Comment | |||
* Federal Register Notice published November 10 10, 2015 (80 FR 69703) | |||
* JLD-ISG-2012-01, Draft Revision 1 at ML15294A078 | |||
* Comment period through December 10, 2015 g g docket ID: NRC- | |||
* www.regulations.gov 2012-0068 3 | |||
Endorsement of Industry Guidance with ith Clarifications Cl ifi ti andd Additions Additi NEI 12-06,, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4 | |||
Reformatted to Align with DG-1301 | |||
: 1. Development and Implementation Process | |||
: 2. Equipment Capacity | |||
: 3. Reasonable Protection | |||
: 4. Equipment Maintenance 5 | |||
: 5. Configuration Control | |||
: 6. Treatment of Reevaluated Hazards | |||
: 7. G id Guidance ffor AP1000 D Design i | |||
5 | |||
NEI 12-06 New Elements | |||
* Resolution of generic concerns from reviews | |||
* Appendix E validation process 6 | |||
Mitigating Strategies Assessments | |||
* Addressing reevaluated seismic and flooding hazards under March 12 12, 2012 request for information | |||
- FLEX and d Modified M difi d FLEX | |||
- Alternative Mitigating Strategies | |||
- Targeted Hazard Mitigating Strategies 7 | |||
Mitigating Strategies Assessments, C ti Continued d | |||
* Flooding - NEI 12 12-06, 06, Appendix G | |||
* Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in ISG §6.1 to solicit comments 8}} |
Latest revision as of 04:14, 31 October 2019
ML15324A257 | |
Person / Time | |
---|---|
Site: | Purdue University |
Issue date: | 11/20/2015 |
From: | Cindy Montgomery Division of Policy and Rulemaking |
To: | Alexander Adams Division of Policy and Rulemaking |
Uribe, Juan, NRR/JLD 415-3809 | |
References | |
Download: ML15324A257 (8) | |
Text
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E E. Bowman Special Advisor, Japan Lessons-Learned Division
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
- 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
2
Availability for Comment
- Federal Register Notice published November 10 10, 2015 (80 FR 69703)
- JLD-ISG-2012-01, Draft Revision 1 at ML15294A078
- Comment period through December 10, 2015 g g docket ID: NRC-
- www.regulations.gov 2012-0068 3
Endorsement of Industry Guidance with ith Clarifications Cl ifi ti andd Additions Additi NEI 12-06,, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4
Reformatted to Align with DG-1301
- 1. Development and Implementation Process
- 2. Equipment Capacity
- 3. Reasonable Protection
- 4. Equipment Maintenance 5
- 5. Configuration Control
- 6. Treatment of Reevaluated Hazards
- 7. G id Guidance ffor AP1000 D Design i
5
NEI 12-06 New Elements
- Resolution of generic concerns from reviews
- Appendix E validation process 6
Mitigating Strategies Assessments
- Addressing reevaluated seismic and flooding hazards under March 12 12, 2012 request for information
- FLEX and d Modified M difi d FLEX
- Alternative Mitigating Strategies
- Targeted Hazard Mitigating Strategies 7
Mitigating Strategies Assessments, C ti Continued d
- Flooding - NEI 12 12-06, 06, Appendix G
- Seismic - placeholder in NEI 12-06 for Appendix H with substantial elements in ISG §6.1 to solicit comments 8
DRAFT JLD-ISG-2012-01, REVISION 1, COMPLIANCE WITH ORDER EA-12-049 EA-12-049, ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS Eric E E. Bowman Special Advisor, Japan Lessons-Learned Division
Purpose The purpose of this meeting is to discuss draft revision 1 to JLD-ISG-2012-01 in order to facilitate stakeholder comments.
- 1. Revision reflects lessons learned from reviews and acceptable alternative approaches Comments must be submitted in writing in order to ensure that NRC will be able to properly consider them.
2
Availability for Comment
- Federal Register Notice published November 10 10, 2015 (80 FR 69703)
- JLD-ISG-2012-01, Draft Revision 1 at ML15294A078
- Comment period through December 10, 2015 g g docket ID: NRC-
- www.regulations.gov 2012-0068 3
Endorsement of Industry Guidance with ith Clarifications Cl ifi ti andd Additions Additi NEI 12-06,, Diverse and Flexible Coping p g Strategies (FLEX) Implementation Guide, Revision 1A, dated October 2015, ML15279A426 4
Reformatted to Align with DG-1301
- 1. Development and Implementation Process
- 2. Equipment Capacity
- 3. Reasonable Protection
- 4. Equipment Maintenance 5
- 5. Configuration Control
- 6. Treatment of Reevaluated Hazards
- 7. G id Guidance ffor AP1000 D Design i
5
NEI 12-06 New Elements
- Resolution of generic concerns from reviews
- Appendix E validation process 6
Mitigating Strategies Assessments
- Addressing reevaluated seismic and flooding hazards under March 12 12, 2012 request for information
- FLEX and d Modified M difi d FLEX
- Alternative Mitigating Strategies
- Targeted Hazard Mitigating Strategies 7
Mitigating Strategies Assessments, C ti Continued d
- Flooding - NEI 12 12-06, 06, Appendix G