ML15337A335: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
{{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:                    Entergy Nuclear Operations, Inc.                                                                                 RIVR14001 (Indian Point Nuclear Generating Units 2 and 3)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIVR14001AllRiverkeeper Track 2 Tailored Hearing Exhibit ListNov. 5, 2015ProfferedRIV000004RK-TC-2; RK-TC-1B; RK-TC-5Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000034RK-TC-1BDr.Hopenfeld Pre-filed Testimony Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000035RK-TC-1B; RK-TC-5Dr. Hopenfeld ReportDec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000036RK-TC-1B; RK-TC-5Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000037RK-TC-1B; RK-TC-5Official Transcript, ACRS Subcommittee, 12/6/2006Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 2Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
Revised: November 5, 2015 ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: RIVR14001-00-BD01                Identified: 11/5/2015 Admitted: 11/5/2015                        Withdrawn:
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000038RK-TC-1B; RK-TC-5NRC IN 2011-04Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000039RK-TC-1B; RK-TC-5Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000040RK-TC-1B; RK-TC-5Taylor, EPRI R & D Status Report, Jan/Feb 1983Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000041RK-TC-1B; RK-TC-5Entergy, Table of Environmental Correction Actions for Metal Fatigue, 11/6/07Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000042RK-TC-1B; RK-TC-5DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 3Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
Rejected:                                      Stricken:
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000043RK-TC-1B; RK-TC-5Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000044RK-TC-1B; RK-TC-5NRC Bulletin 88-08Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000045RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 1Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000046RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 2Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 4Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
Other:
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000047RK-TC-1B; RK-TC-5NRC IN 97-46Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000048RK-TC-1B; RK-TC-5Final Report of the NESC-Thermal Fatigue Project, EUR22763Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000049RK-TC-1B; RK-TC-5, RK-TC-2Entergy Indian Point U3, FAC, 3RF13 Outage, 2005Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000050RK-TC-1B; RK-TC-5Westinghouse, WCAP-14950, IPECPROP00059247Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000051RK-TC-1B; RK-TC-5Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 5Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000052A
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit                  Contentions                  Exhibit Name                                                Exhibit      Exhibit Status
-DRK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1110Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000053RK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1122Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000054RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000055RK-TC-1B; RK-TC-5Westinghouse CN-PAFM-09-64, IPECPROP00058077Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000056RK-TC-1B; RK-TC-5Systems Standard Design Criteria, IPECPROP00059698Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 6Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
                  #           Addressed by Exhibit                                                                          Submission Date RIVR14001 All                                              Riverkeeper Track 2 Tailored Hearing Exhibit List        Nov. 5, 2015    Proffered RIV000004 RK-TC-2; RK-TC-1B;                               Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")     Dec. 22, 2011    Admitted during RK-TC-5                                                                                                        Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000057RK-TC-1B; RK-TC-5RAI Indian Point U2 and U3 LRA, 2/10/11Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIVR00058RK-TC-1B; RK-TC-5Response to RAI, Indian Point U2 and U3, 3/28/11Oct. 9, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000102RK-TC-5Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000103RK-TC-5; RK-TC-1BHopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976)June 19, 2012Admitted during Track 1 Hearings (10-15-2012) 7Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000034            RK-TC-1B                             Dr.Hopenfeld Pre-filed Testimony                        Dec. 22, 2011    Admitted during Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000104RK-TC-5; RK-TC-1BMemorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000105RK-TC-5; RK-TC-1BNUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001)June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000106RK-TC-5; RK-TC-1BAssociated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox News.com, February 3, 2012June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000114RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding  Contention NYS-26B/TC-1B - Metal FatigueJune 29, 2012Admitted during Track 1 Hearings (10-15-2012) 8Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000035            RK-TC-1B; RK-TC-5                    Dr. Hopenfeld Report                                    Dec. 22, 2011    Admitted during Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000115RK-TC-1B; RK-TC-5NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification (December 20, 1988) June 29, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000116RK-TC-1B; RK-TC-5Audit of NRC's License Renewal Program, OIG-07-A-15, September 6, 2007June 29, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000117RK-TC-1B; RK-TC-5Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering  Vol. 6, No. 2, 2011June 29, 2012Admitted during Track 1 Hearings (10-15-2012) 9Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000036            RK-TC-1B; RK-TC-5                     Westinghouse "EnvFat User's Manual Version 1"            Dec. 22, 2011    Admitted during IPECPROP00056785                                                          Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000118RK-TC-1B; RK-TC-5G. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K. Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-860722-12, TI86 005150June 29, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000119RK-TC-1B; RK-TC-5International Atomic Energy Agency, Applicability of the leak before break concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June
RIV000037            RK-TC-1B; RK-TC-5                    Official Transcript, ACRS Subcommittee, 12/6/2006        Dec. 22, 2011    Admitted during Track 1 Hearings (10-15-2012) 1


1993)June 29, 2012Admitted during Track 1 Hearings (10-15-2012) 10Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000132RK-TC-2; RK-TC-5Excerpt of IP3, RO13 FAC Inspection Report (2005), IP00044076Oct. 17, 2012Admitted during Track 1 Hearings (10-17-2012)RIV000133RK-TC-2; RK-TC-5Excerpt of IP3, RO15 FAC Inspection Report (2009), IPEC00213685Oct. 17, 2012Admitted during Track 1 Hearings (10-17-2012)RIV000134RK-TC-5Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-38/RK-TC-5Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000135RK-TC-5; RK-TC-1BEntergy Ultrasonic Examination Reports, IPEC00020933Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted 11Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit    Exhibit Status
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000136RK-TC-5; RK-TC-1BNew York Power Authority Ultrasonic Examination Report, Report No.: 99UT155, IPEC00021837Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000137RK-TC-5; RK-TC-1BNew York Power Authority Ultrasonic Examination Report, Report No.: 99UT251, IPEC00021885Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000138RK-TC-5; RK-TC-1BJ.S. Kim & J.S. Seo, Development of Engineering Formulae for Stress Concentration Factors of Local Wall Thinning in CANDU Feeder Pipe Under Pressure, Proceedings of the ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000139RK-TC-5; RK-TC-1BM.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel For SMART, Nuclear Engineering and Technology, Vol. 44, No. 6 (August 2012)Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted 12Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
    #     Addressed by Exhibit                                                            Submission Date RIV000038  RK-TC-1B; RK-TC-5    NRC IN 2011-04                                            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000140RK-TC-5; RK-TC-1BFrançois Vaillant, et al., Influence of a Cyclic Loading on the Initiation and Propagation of PWSCC in Weld Metal 182, Proceedings of the 12th International Conference on Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000141RK-TC-5; RK-TC-1BE.C. Eggertson, et al, Turbulent Mixing and its Effects on Thermal Fatigue in Nuclear Reactors, World Academy of Science, Engineering and Technology 52 (2011)Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000142RK-TC-5; RK-TC-1BSupplemental Prefiled Written Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-26B/RK-TC-1BJune 9, 2015Filed/Proffered for Track 2, not Admitted 13Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000039  RK-TC-1B; RK-TC-5    Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, Dec. 22, 2011 Admitted during 5/12/08                                                                  Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000143RK-TC-5; RK-TC-1BSupplemental Prefiled Written Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-38/RK-TC-5June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000144RK-TC-5; RK-TC-1BSupplemental Report of Dr. Joram Hopenfeld in Support of Contention NYS-26B/RK-TC-1B and Amended Contention NYS-38/RK-TC-5 (Non-Public/Non-Redacted)
RIV000040  RK-TC-1B; RK-TC-5   Taylor, EPRI R & D Status Report, Jan/Feb 1983            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
[PROPRIETARY]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000145RK-TC-5; RK-TC-1BK L Murty, Materials Ageing and Degradation in Light Water Reactors (Woodhead Publishing Ltd. 2013)
RIV000041  RK-TC-1B; RK-TC-5    Entergy, Table of Environmental Correction Actions for    Dec. 22, 2011 Admitted during Metal Fatigue, 11/6/07                                                  Track 1 Hearings (10-15-2012)
[EXCERPT; COPYRIGHT]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV00146A-BRK-TC-5; RK-TC-1BNUREG-1150, Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants (1990), available at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1150/June 9, 2015Filed/Proffered for Track 2, not Admitted 14Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000042  RK-TC-1B; RK-TC-5   DC Cook Charging Nozzle LR Fatigue Evaluations,           Dec. 22, 2011 Admitted during IPECPROP00061294                                                        Track 1 Hearings (10-15-2012) 2
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000147RK-TC-5; RK-TC-1BNUREG-75/014 (WASH-1400), Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants (1975)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000148RK-TC-5; RK-TC-1BDeclaration of Dr. Joram Hopenfeld (February 12, 2015) [PROPRIETARY]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000149RK-TC-5; RK-TC-1BMaterial Aging Institute International Conference on Plants Materials Degradations, Chemical conditioning of Light Water reactors Systems (2008), IPEC00265853June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000150RK-TC-5; RK-TC-1BANL, Report on Assessment of Environmentally-Assisted Fatigue for LWR Extended Service Conditions, ANL-LWRS-47 (September 2011)June 9, 2015Filed/Proffered for Track 2, not Admitted 15Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000151RK-TC-5; RK-TC-1BNASA, Nuclear and Space Radiation Effects on Materials, NASA SP-8053 (June 1970), available at, http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015


558.pdfJune 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000152RK-TC-5; RK-TC-1BG. E. Korth & M. D. Harper, Effects of Neutron Radiation on the Fatigue and Creep/Fatigue Behavior of Type 308 Stainless Steel Weld Metal at Elevated Temperatures (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682June 9, 2015Filed/Proffered for Track 2, not Admitted 16Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000153RK-TC-5; RK-TC-1BArgonne National Laboratory, Corrosion and Mechanics of Materials, Light Water Reactors, Irradiation-Induced Stress Corrosion Cracking of Austenitic Stainless Steels, http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000154RK-TC-5; RK-TC-1BS. Mohanty, S. Majumdar, & K. Natesan, Argonne National Laboratory, A Review of Stress Corrosion Cracking/Fatigue Modeling for Light Water Reactor Cooling System Components (June 2012)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000155RK-TC-5; RK-TC-1BS. McKelvey & A. Fatemi, "Effect of Forging Surface on Fatigue Behavior of Steels: A Literature Review (University of Toledo)June 9, 2015Filed/Proffered for Track 2, not Admitted 17Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit     Contentions     Exhibit Name                                              Exhibit   Exhibit Status
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000156RK-TC-5; RK-TC-1BWestinghouse, Indian Point Unit 2 Reactor Vessel Core Support Pad Fatigue Reevaluation, CN-MRCDA-13-11, IPECPROP00079179 [PROPRIETARY]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000157RK-TC-5; RK-TC-1BPilkey & Pilkey, Peterson's Stress Concentration Factors, 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT; COPYRIGHT]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000158RK-TC-5; RK-TC-1BHerve Bodineau & Thierry Sollier, Tube support plate clogging up of French PWR steam generators, Eurosafe, IRSN - Reactor Safety Division, BP17 (2009)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000159RK-TC-5; RK-TC-1BNUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission (2004), available at http://www.nrc.gov/reading-rm/doc-collections/nuregs/brochures/br0058/br0058r4.pdfJune 9, 2015Filed/Proffered for Track 2, not Admitted 18Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
    #     Addressed by Exhibit                                                          Submission Date RIV000043  RK-TC-1B; RK-TC-5   Diablo Canyon Unit 1 Insurge/Outsurge Eval,             Dec. 22, 2011 Admitted during IPECPROP00061179                                                      Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000160RK-TC-5; RK-TC-1BU.S. NRC, Commissioner Apostolakis, Application of Risk Assessment and Management to Nuclear Safety (DOE Nuclear Safety Workshop, September 2012), available at, http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdfJune 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000161RK-TC-5; RK-TC-1BReport of Dr. Joram Hopenfeld in Response to Entergy and NRC Staff Testimony Regarding Contention NYS-26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5
RIV000044  RK-TC-1B; RK-TC-5    NRC Bulletin 88-08                                     Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
[PROPRIETARY]Sept. 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000162RK-TC-5; RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY]Sept. 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000163RK-TC-5; RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-26B/RK-TC-1B
RIV000045  RK-TC-1B; RK-TC-5    NRC Bulletin 88-08 Supp. 1                             Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
[PROPRIETARY]Sept. 9, 2015Filed/Proffered for Track 2, not Admitted 19Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
RIV000046  RK-TC-1B; RK-TC-5   NRC Bulletin 88-08 Supp. 2                             Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 3
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000164RK-TC-5; RK-TC-1BNUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: A Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf Sept. 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000165RK-TC-5; RK-TC-1BU.S. NRC, Office of the Inspector General, OIG-07-A-15, Audit of NRC's License Renewal Program (September 6, 2007), available at, http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdfSept. 9, 2015Filed/Proffered for Track 2, not Admitted 1Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIVR14001AllRiverkeeper Track 2 Tailored Hearing Exhibit ListNov. 5, 2015ProfferedRIV000004RK-TC-2; RK-TC-1B; RK-TC-5Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000034RK-TC-1BDr.Hopenfeld Pre-filed Testimony Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000035RK-TC-1B; RK-TC-5Dr. Hopenfeld ReportDec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000036RK-TC-1B; RK-TC-5Westinghouse "EnvFat User's Manual Version 1" IPECPROP00056785Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000037RK-TC-1B; RK-TC-5Official Transcript, ACRS Subcommittee, 12/6/2006Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 2Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000038RK-TC-1B; RK-TC-5NRC IN 2011-04Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000039RK-TC-1B; RK-TC-5Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, 5/12/08Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000040RK-TC-1B; RK-TC-5Taylor, EPRI R & D Status Report, Jan/Feb 1983Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000041RK-TC-1B; RK-TC-5Entergy, Table of Environmental Correction Actions for Metal Fatigue, 11/6/07Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000042RK-TC-1B; RK-TC-5DC Cook Charging Nozzle LR Fatigue Evaluations, IPECPROP00061294Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 3Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000043RK-TC-1B; RK-TC-5Diablo Canyon Unit 1 Insurge/Outsurge Eval, IPECPROP00061179Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000044RK-TC-1B; RK-TC-5NRC Bulletin 88-08Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000045RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 1Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000046RK-TC-1B; RK-TC-5NRC Bulletin 88-08 Supp. 2Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 4Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000047RK-TC-1B; RK-TC-5NRC IN 97-46Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000048RK-TC-1B; RK-TC-5Final Report of the NESC-Thermal Fatigue Project, EUR22763Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000049RK-TC-1B; RK-TC-5, RK-TC-2Entergy Indian Point U3, FAC, 3RF13 Outage, 2005Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000050RK-TC-1B; RK-TC-5Westinghouse, WCAP-14950, IPECPROP00059247Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000051RK-TC-1B; RK-TC-5Kwang Chu Kim, Journal of Mechanical Science/Technology, 2008Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 5Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000052A
-DRK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1110Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000053RK-TC-1B; RK-TC-5Combustion Engineering, Inc., CENC-1122Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000054RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000055RK-TC-1B; RK-TC-5Westinghouse CN-PAFM-09-64, IPECPROP00058077Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIV000056RK-TC-1B; RK-TC-5Systems Standard Design Criteria, IPECPROP00059698Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012) 6Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000057RK-TC-1B; RK-TC-5RAI Indian Point U2 and U3 LRA, 2/10/11Dec. 22, 2011Admitted during Track 1 Hearings (10-15-2012)RIVR00058RK-TC-1B; RK-TC-5Response to RAI, Indian Point U2 and U3, 3/28/11Oct. 9, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000102RK-TC-5Pre-Filed Testimony of Joram Hopenfeld in Support of RK-TC-5June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000103RK-TC-5; RK-TC-1BHopenfeld, Small Sodium-to-Gas Leak Behavior in Relation to LMFBR Leak Detection System Design (International Conference on Liquid Metal Technology, May 3-6, 1976)June 19, 2012Admitted during Track 1 Hearings (10-15-2012) 7Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000104RK-TC-5; RK-TC-1BMemorandum from S. Collins (NRR) to W. Travers (EDO), Re: Steam Generator Action Plan Revision to Address Differing Professional Opinion on Steam Generator Tube Integrity (WITS ITEM 200100026), May 11, 2011June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000105RK-TC-5; RK-TC-1BNUREG-1740, Voltage-Based Alternative Repair Criteria, A Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (March/Feb. 2001)June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000106RK-TC-5; RK-TC-1BAssociated Press, Nuke inspectors focus on 'unusual' wear on tubes, Fox News.com, February 3, 2012June 19, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000114RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding  Contention NYS-26B/TC-1B - Metal FatigueJune 29, 2012Admitted during Track 1 Hearings (10-15-2012) 8Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000115RK-TC-1B; RK-TC-5NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal Stratification (December 20, 1988) June 29, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000116RK-TC-1B; RK-TC-5Audit of NRC's License Renewal Program, OIG-07-A-15, September 6, 2007June 29, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000117RK-TC-1B; RK-TC-5Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, Development of an Environmental Fatigue Evaluation Method for Nuclear Power Plants in JSME Code* , J. of Environment and Engineering  Vol. 6, No. 2, 2011June 29, 2012Admitted during Track 1 Hearings (10-15-2012) 9Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000118RK-TC-1B; RK-TC-5G. T. Yahr and R. C. Gwaltney (Oak Ridge National Laboratory), Ao K. Richardson and W. L. Server (EG&G Idaho, Inc), Case Study of the Propagation of a Small Flaw Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-860722-12, TI86 005150June 29, 2012Admitted during Track 1 Hearings (10-15-2012)RIV000119RK-TC-1B; RK-TC-5International Atomic Energy Agency, Applicability of the leak before break concept, Report of the IAEA Extrabudgetary Programme on the Safety of WWER-440 Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June


1993)June 29, 2012Admitted during Track 1 Hearings (10-15-2012) 10Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit  
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000132RK-TC-2; RK-TC-5Excerpt of IP3, RO13 FAC Inspection Report (2005), IP00044076Oct. 17, 2012Admitted during Track 1 Hearings (10-17-2012)RIV000133RK-TC-2; RK-TC-5Excerpt of IP3, RO15 FAC Inspection Report (2009), IPEC00213685Oct. 17, 2012Admitted during Track 1 Hearings (10-17-2012)RIV000134RK-TC-5Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-38/RK-TC-5Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000135RK-TC-5; RK-TC-1BEntergy Ultrasonic Examination Reports, IPEC00020933Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted 11Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                              Exhibit   Exhibit Status
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000136RK-TC-5; RK-TC-1BNew York Power Authority Ultrasonic Examination Report, Report No.: 99UT155, IPEC00021837Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000137RK-TC-5; RK-TC-1BNew York Power Authority Ultrasonic Examination Report, Report No.: 99UT251, IPEC00021885Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000138RK-TC-5; RK-TC-1BJ.S. Kim & J.S. Seo, Development of Engineering Formulae for Stress Concentration Factors of Local Wall Thinning in CANDU Feeder Pipe Under Pressure, Proceedings of the ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000139RK-TC-5; RK-TC-1BM.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel For SMART, Nuclear Engineering and Technology, Vol. 44, No. 6 (August 2012)Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted 12Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
    #     Addressed by Exhibit                                                          Submission Date RIV000047  RK-TC-1B; RK-TC-5    NRC IN 97-46                                            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000140RK-TC-5; RK-TC-1BFrançois Vaillant, et al., Influence of a Cyclic Loading on the Initiation and Propagation of PWSCC in Weld Metal 182, Proceedings of the 12th International Conference on Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000141RK-TC-5; RK-TC-1BE.C. Eggertson, et al, Turbulent Mixing and its Effects on Thermal Fatigue in Nuclear Reactors, World Academy of Science, Engineering and Technology 52 (2011)Nov. 9, 2012Filed/Proffered duing Track 1, not Admitted RIV000142RK-TC-5; RK-TC-1BSupplemental Prefiled Written Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-26B/RK-TC-1BJune 9, 2015Filed/Proffered for Track 2, not Admitted 13Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000048  RK-TC-1B; RK-TC-5    Final Report of the NESC-Thermal Fatigue Project,       Dec. 22, 2011 Admitted during EUR22763                                                              Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000143RK-TC-5; RK-TC-1BSupplemental Prefiled Written Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-38/RK-TC-5June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000144RK-TC-5; RK-TC-1BSupplemental Report of Dr. Joram Hopenfeld in Support of Contention NYS-26B/RK-TC-1B and Amended Contention NYS-38/RK-TC-5 (Non-Public/Non-Redacted)
RIV000049  RK-TC-1B; RK-TC-5,   Entergy Indian Point U3, FAC, 3RF13 Outage, 2005        Dec. 22, 2011 Admitted during RK-TC-2                                                                                    Track 1 Hearings (10-15-2012)
[PROPRIETARY]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000145RK-TC-5; RK-TC-1BK L Murty, Materials Ageing and Degradation in Light Water Reactors (Woodhead Publishing Ltd. 2013)
RIV000050  RK-TC-1B; RK-TC-5    Westinghouse, WCAP-14950, IPECPROP00059247              Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
[EXCERPT; COPYRIGHT]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV00146A-BRK-TC-5; RK-TC-1BNUREG-1150, Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants (1990), available at http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1150/June 9, 2015Filed/Proffered for Track 2, not Admitted 14Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000051  RK-TC-1B; RK-TC-5   Kwang Chu Kim, Journal of Mechanical                    Dec. 22, 2011 Admitted during Science/Technology, 2008                                             Track 1 Hearings (10-15-2012) 4
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000147RK-TC-5; RK-TC-1BNUREG-75/014 (WASH-1400), Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants (1975)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000148RK-TC-5; RK-TC-1BDeclaration of Dr. Joram Hopenfeld (February 12, 2015) [PROPRIETARY]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000149RK-TC-5; RK-TC-1BMaterial Aging Institute International Conference on Plants Materials Degradations, Chemical conditioning of Light Water reactors Systems (2008), IPEC00265853June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000150RK-TC-5; RK-TC-1BANL, Report on Assessment of Environmentally-Assisted Fatigue for LWR Extended Service Conditions, ANL-LWRS-47 (September 2011)June 9, 2015Filed/Proffered for Track 2, not Admitted 15Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000151RK-TC-5; RK-TC-1BNASA, Nuclear and Space Radiation Effects on Materials, NASA SP-8053 (June 1970), available at, http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015


558.pdfJune 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000152RK-TC-5; RK-TC-1BG. E. Korth & M. D. Harper, Effects of Neutron Radiation on the Fatigue and Creep/Fatigue Behavior of Type 308 Stainless Steel Weld Metal at Elevated Temperatures (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682June 9, 2015Filed/Proffered for Track 2, not Admitted 16Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000153RK-TC-5; RK-TC-1BArgonne National Laboratory, Corrosion and Mechanics of Materials, Light Water Reactors, Irradiation-Induced Stress Corrosion Cracking of Austenitic Stainless Steels, http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000154RK-TC-5; RK-TC-1BS. Mohanty, S. Majumdar, & K. Natesan, Argonne National Laboratory, A Review of Stress Corrosion Cracking/Fatigue Modeling for Light Water Reactor Cooling System Components (June 2012)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000155RK-TC-5; RK-TC-1BS. McKelvey & A. Fatemi, "Effect of Forging Surface on Fatigue Behavior of Steels: A Literature Review (University of Toledo)June 9, 2015Filed/Proffered for Track 2, not Admitted 17Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                              Exhibit    Exhibit Status
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000156RK-TC-5; RK-TC-1BWestinghouse, Indian Point Unit 2 Reactor Vessel Core Support Pad Fatigue Reevaluation, CN-MRCDA-13-11, IPECPROP00079179 [PROPRIETARY]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000157RK-TC-5; RK-TC-1BPilkey & Pilkey, Peterson's Stress Concentration Factors, 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT; COPYRIGHT]June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000158RK-TC-5; RK-TC-1BHerve Bodineau & Thierry Sollier, Tube support plate clogging up of French PWR steam generators, Eurosafe, IRSN - Reactor Safety Division, BP17 (2009)June 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000159RK-TC-5; RK-TC-1BNUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission (2004), available at http://www.nrc.gov/reading-rm/doc-collections/nuregs/brochures/br0058/br0058r4.pdfJune 9, 2015Filed/Proffered for Track 2, not Admitted 18Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
    #      Addressed by Exhibit                                                          Submission Date RIV000052A RK-TC-1B; RK-TC-5    Combustion Engineering, Inc., CENC-1110                Dec. 22, 2011 Admitted during
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000160RK-TC-5; RK-TC-1BU.S. NRC, Commissioner Apostolakis, Application of Risk Assessment and Management to Nuclear Safety (DOE Nuclear Safety Workshop, September 2012), available at, http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdfJune 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000161RK-TC-5; RK-TC-1BReport of Dr. Joram Hopenfeld in Response to Entergy and NRC Staff Testimony Regarding Contention NYS-26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5
-D                                                                                                    Track 1 Hearings (10-15-2012)
[PROPRIETARY]Sept. 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000162RK-TC-5; RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY]Sept. 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000163RK-TC-5; RK-TC-1BPrefiled Rebuttal Testimony of Dr. Joram Hopenfeld Regarding Contention NYS-26B/RK-TC-1B
RIV000053  RK-TC-1B; RK-TC-5    Combustion Engineering, Inc., CENC-1122                Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
[PROPRIETARY]Sept. 9, 2015Filed/Proffered for Track 2, not Admitted 19Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01Evidentiary HearingRiverkeeper ("RIV") Hearing ExhibitsRIV Exhibit
RIV000054  RK-TC-1B; RK-TC-5    letter from P. Bessette to D. Brancato, 10/18/11        Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
#Contentions Addressed by ExhibitExhibit NameExhibit Submission DateExhibit StatusRIV000164RK-TC-5; RK-TC-1BNUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: A Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf Sept. 9, 2015Filed/Proffered for Track 2, not AdmittedRIV000165RK-TC-5; RK-TC-1BU.S. NRC, Office of the Inspector General, OIG-07-A-15, Audit of NRC's License Renewal Program (September 6, 2007), available at, http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdfSept. 9, 2015Filed/Proffered for Track 2, not Admitted}}
RIV000055  RK-TC-1B; RK-TC-5    Westinghouse CN-PAFM-09-64, IPECPROP00058077            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000056  RK-TC-1B; RK-TC-5    Systems Standard Design Criteria, IPECPROP00059698      Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 5
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000057  RK-TC-1B; RK-TC-5    RAI Indian Point U2 and U3 LRA, 2/10/11                  Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIVR00058 RK-TC-1B; RK-TC-5      Response to RAI, Indian Point U2 and U3, 3/28/11        Oct. 9, 2012  Admitted during Track 1 Hearings (10-15-2012)
RIV000102  RK-TC-5             Pre-Filed Testimony of Joram Hopenfeld in Support of RK- June 19, 2012 Admitted during TC-5                                                                  Track 1 Hearings (10-15-2012)
RIV000103  RK-TC-5; RK-TC-1B    Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation June 19, 2012 Admitted during to LMFBR Leak Detection System Design (International                  Track 1 Hearings Conference on Liquid Metal Technology, May 3-6, 1976)                  (10-15-2012) 6
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                    Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                Submission Date RIV000104  RK-TC-5; RK-TC-1B    Memorandum from S. Collins (NRR) to W. Travers (EDO),       June 19, 2012 Admitted during Re: Steam Generator Action Plan Revision to Address                        Track 1 Hearings Differing Professional Opinion on Steam Generator Tube                    (10-15-2012)
Integrity (WITS ITEM 200100026), May 11, 2011 RIV000105  RK-TC-5; RK-TC-1B    NUREG-1740, Voltage-Based Alternative Repair Criteria, A June 19, 2012     Admitted during Report to the Advisory Committee on Reactor Safeguards by                  Track 1 Hearings the Ad Hoc Subcommittee on a Differing Professional                        (10-15-2012)
Opinion (March/Feb. 2001)
RIV000106  RK-TC-5; RK-TC-1B    Associated Press, Nuke inspectors focus on 'unusual' wear on June 19, 2012 Admitted during tubes, Fox News.com, February 3, 2012                                      Track 1 Hearings (10-15-2012)
RIV000114  RK-TC-1B            Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld           June 29, 2012 Admitted during Regarding Contention NYS-26B/TC-1B - Metal Fatigue                        Track 1 Hearings (10-15-2012) 7
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000115  RK-TC-1B; RK-TC-5    NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal  June 29, 2012 Admitted during Stratification (December 20, 1988)                                    Track 1 Hearings (10-15-2012)
RIV000116  RK-TC-1B; RK-TC-5    Audit of NRCs License Renewal Program, OIG-07-A-15,    June 29, 2012 Admitted during September 6, 2007                                                    Track 1 Hearings (10-15-2012)
RIV000117  RK-TC-1B; RK-TC-5    Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie,       June 29, 2012 Admitted during Development of an Environmental Fatigue Evaluation                    Track 1 Hearings Method for Nuclear Power Plants in JSME Code* , J. of                (10-15-2012)
Environment and Engineering Vol. 6, No. 2, 2011 8
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                              Submission Date RIV000118  RK-TC-1B; RK-TC-5    G. T. Yahr and R. C. Gwaltney (Oak Ridge National          June 29, 2012 Admitted during Laboratory), Ao K. Richardson and W. L. Server (EG&G                    Track 1 Hearings Idaho, Inc), Case Study of the Propagation of a Small Flaw              (10-15-2012)
Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119  RK-TC-1B; RK-TC-5    International Atomic Energy Agency, Applicability of the  June 29, 2012 Admitted during leak before break concept, Report of the IAEA                            Track 1 Hearings Extrabudgetary Programme on the Safety of WWER-440                      (10-15-2012)
Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 9
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000132  RK-TC-2; RK-TC-5    Excerpt of IP3, RO13 FAC Inspection Report (2005),      Oct. 17, 2012 Admitted during IP00044076                                                            Track 1 Hearings (10-17-2012)
RIV000133  RK-TC-2; RK-TC-5    Excerpt of IP3, RO15 FAC Inspection Report (2009),      Oct. 17, 2012 Admitted during IPEC00213685                                                          Track 1 Hearings (10-17-2012)
RIV000134  RK-TC-5              Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld      Nov. 9, 2012  Filed/Proffered Regarding Contention NYS-38/RK-TC-5                                  duing Track 1, not Admitted RIV000135  RK-TC-5; RK-TC-1B    Entergy Ultrasonic Examination Reports, IPEC00020933    Nov. 9, 2012  Filed/Proffered duing Track 1, not Admitted 10
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000136  RK-TC-5; RK-TC-1B    New York Power Authority Ultrasonic Examination Report,    Nov. 9, 2012 Filed/Proffered Report No.: 99UT155, IPEC00021837                                      duing Track 1, not Admitted RIV000137  RK-TC-5; RK-TC-1B    New York Power Authority Ultrasonic Examination Report,    Nov. 9, 2012 Filed/Proffered Report No.: 99UT251, IPEC00021885                                      duing Track 1, not Admitted RIV000138  RK-TC-5; RK-TC-1B    J.S. Kim & J.S. Seo, Development of Engineering Formulae Nov. 9, 2012  Filed/Proffered for Stress Concentration Factors of Local Wall Thinning in              duing Track 1, not CANDU Feeder Pipe Under Pressure, Proceedings of the                    Admitted ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 RIV000139  RK-TC-5; RK-TC-1B    M.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel  Nov. 9, 2012 Filed/Proffered For SMART, Nuclear Engineering and Technology, Vol. 44,                duing Track 1, not No. 6 (August 2012)                                                    Admitted 11
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                        Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                  Submission Date RIV000140  RK-TC-5; RK-TC-1B    François Vaillant, et al., Influence of a Cyclic Loading on the Nov. 9, 2012 Filed/Proffered Initiation and Propagation of PWSCC in Weld Metal 182,                      duing Track 1, not Proceedings of the 12th International Conference on                          Admitted Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005 RIV000141  RK-TC-5; RK-TC-1B    E.C. Eggertson, et al, Turbulent Mixing and its Effects on      Nov. 9, 2012 Filed/Proffered Thermal Fatigue in Nuclear Reactors, World Academy of                        duing Track 1, not Science, Engineering and Technology 52 (2011)                                Admitted RIV000142  RK-TC-5; RK-TC-1B    Supplemental Prefiled Written Testimony of Dr. Joram            June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-26B/RK-TC-1B                              Track 2, not Admitted 12
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000143  RK-TC-5; RK-TC-1B    Supplemental Prefiled Written Testimony of Dr. Joram    June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-38/RK-TC-5                        Track 2, not Admitted RIV000144  RK-TC-5; RK-TC-1B    Supplemental Report of Dr. Joram Hopenfeld in Support of June 9, 2015 Filed/Proffered for Contention NYS-26B/RK-TC-1B and Amended Contention                    Track 2, not NYS-38/RK-TC-5 (Non-Public/Non-Redacted)                              Admitted
[PROPRIETARY]
RIV000145  RK-TC-5; RK-TC-1B    K L Murty, Materials Ageing and Degradation in Light    June 9, 2015 Filed/Proffered for Water Reactors (Woodhead Publishing Ltd. 2013)                        Track 2, not
[EXCERPT; COPYRIGHT]                                                  Admitted RIV00146A- RK-TC-5; RK-TC-1B    NUREG-1150, Severe Accident Risks: An Assessment for    June 9, 2015 Filed/Proffered for B                                Five U.S. Nuclear Power Plants (1990), available at                  Track 2, not http://www.nrc.gov/reading-rm/doc-                                    Admitted collections/nuregs/staff/sr1150/
13
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                    Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                              Submission Date RIV000147  RK-TC-5; RK-TC-1B    NUREG-75/014 (WASH-1400), Reactor Safety Study: An          June 9, 2015 Filed/Proffered for Assessment of Accident Risks in U.S. Commercial Nuclear                  Track 2, not Power Plants (1975)                                                      Admitted RIV000148  RK-TC-5; RK-TC-1B    Declaration of Dr. Joram Hopenfeld (February 12, 2015)      June 9, 2015 Filed/Proffered for
[PROPRIETARY]                                                            Track 2, not Admitted RIV000149  RK-TC-5; RK-TC-1B    Material Aging Institute International Conference on Plants June 9, 2015 Filed/Proffered for Materials Degradations, Chemical conditioning of Light                  Track 2, not Water reactors Systems (2008), IPEC00265853                              Admitted RIV000150  RK-TC-5; RK-TC-1B    ANL, Report on Assessment of Environmentally-Assisted      June 9, 2015 Filed/Proffered for Fatigue for LWR Extended Service Conditions, ANL-LWRS-                  Track 2, not 47 (September 2011)                                                      Admitted 14
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                      Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                Submission Date RIV000151  RK-TC-5; RK-TC-1B    NASA, Nuclear and Space Radiation Effects on Materials,      June 9, 2015 Filed/Proffered for NASA SP-8053 (June 1970), available at,                                    Track 2, not http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015              Admitted 558.pdf RIV000152  RK-TC-5; RK-TC-1B    G. E. Korth & M. D. Harper, Effects of Neutron Radiation      June 9, 2015 Filed/Proffered for on the Fatigue and Creep/Fatigue Behavior of Type 308                      Track 2, not Stainless Steel Weld Metal at Elevated Temperatures                        Admitted (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682 15
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                    Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                              Submission Date RIV000153  RK-TC-5; RK-TC-1B    Argonne National Laboratory, Corrosion and Mechanics of    June 9, 2015 Filed/Proffered for Materials, Light Water Reactors, Irradiation-Induced Stress              Track 2, not Corrosion Cracking of Austenitic Stainless Steels,                      Admitted http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)
RIV000154  RK-TC-5; RK-TC-1B    S. Mohanty, S. Majumdar, & K. Natesan, Argonne National    June 9, 2015 Filed/Proffered for Laboratory, A Review of Stress Corrosion Cracking/Fatigue                Track 2, not Modeling for Light Water Reactor Cooling System                          Admitted Components (June 2012)
RIV000155  RK-TC-5; RK-TC-1B    S. McKelvey & A. Fatemi, Effect of Forging Surface on      June 9, 2015 Filed/Proffered for Fatigue Behavior of Steels: A Literature Review (University              Track 2, not of Toledo)                                                              Admitted 16
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000156  RK-TC-5; RK-TC-1B    Westinghouse, Indian Point Unit 2 Reactor Vessel Core    June 9, 2015 Filed/Proffered for Support Pad Fatigue Reevaluation, CN-MRCDA-13-11,                      Track 2, not IPECPROP00079179 [PROPRIETARY]                                        Admitted RIV000157  RK-TC-5; RK-TC-1B    Pilkey & Pilkey, Petersons Stress Concentration Factors, June 9, 2015 Filed/Proffered for 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT;                  Track 2, not COPYRIGHT]                                                            Admitted RIV000158  RK-TC-5; RK-TC-1B    Herve Bodineau & Thierry Sollier, Tube support plate      June 9, 2015 Filed/Proffered for clogging up of French PWR steam generators, Eurosafe,                  Track 2, not IRSN - Reactor Safety Division, BP17 (2009)                            Admitted RIV000159  RK-TC-5; RK-TC-1B    NUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of June 9, 2015  Filed/Proffered for the U.S. Nuclear Regulatory Commission (2004), available              Track 2, not at http://www.nrc.gov/reading-rm/doc-                                  Admitted collections/nuregs/brochures/br0058/br0058r4.pdf 17
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                      Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                Submission Date RIV000160  RK-TC-5; RK-TC-1B    U.S. NRC, Commissioner Apostolakis, Application of Risk      June 9, 2015  Filed/Proffered for Assessment and Management to Nuclear Safety (DOE                            Track 2, not Nuclear Safety Workshop, September 2012), available at,                    Admitted http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdf RIV000161  RK-TC-5; RK-TC-1B    Report of Dr. Joram Hopenfeld in Response to Entergy and Sept. 9, 2015      Filed/Proffered for NRC Staff Testimony Regarding Contention NYS-                              Track 2, not 26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5                          Admitted
[PROPRIETARY]
RIV000162  RK-TC-5; RK-TC-1B    Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld            Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY]                          Track 2, not Admitted RIV000163  RK-TC-5; RK-TC-1B    Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld            Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-26B/RK-TC-1B                                      Track 2, not
[PROPRIETARY]                                                              Admitted 18
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000164  RK-TC-5; RK-TC-1B    NUREG-1740, ACRS, Voltage-Based Alternative Repair      Sept. 9, 2015 Filed/Proffered for Criteria: A Report to the Advisory Committee on Reactor              Track 2, not Safeguards by the Ad Hoc Subcommittee on a Differing                  Admitted Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf RIV000165  RK-TC-5; RK-TC-1B    U.S. NRC, Office of the Inspector General, OIG-07-A-15, Sept. 9, 2015 Filed/Proffered for Audit of NRCs License Renewal Program (September 6,                  Track 2, not 2007), available at,                                                  Admitted http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdf 19
 
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:                    Entergy Nuclear Operations, Inc.                                                                                RIVR14001 (Indian Point Nuclear Generating Units 2 and 3)
Revised: November 5, 2015 ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: RIVR14001-00-BD01                Identified: 11/5/2015 Admitted: 11/5/2015                        Withdrawn:
Rejected:                                      Stricken:
Other:
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit                  Contentions                  Exhibit Name                                                Exhibit      Exhibit Status
                  #            Addressed by Exhibit                                                                          Submission Date RIVR14001 All                                              Riverkeeper Track 2 Tailored Hearing Exhibit List        Nov. 5, 2015    Proffered RIV000004 RK-TC-2; RK-TC-1B;                              Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV")    Dec. 22, 2011    Admitted during RK-TC-5                                                                                                        Track 1 Hearings (10-15-2012)
RIV000034            RK-TC-1B                              Dr.Hopenfeld Pre-filed Testimony                        Dec. 22, 2011    Admitted during Track 1 Hearings (10-15-2012)
RIV000035            RK-TC-1B; RK-TC-5                    Dr. Hopenfeld Report                                    Dec. 22, 2011    Admitted during Track 1 Hearings (10-15-2012)
RIV000036            RK-TC-1B; RK-TC-5                    Westinghouse "EnvFat User's Manual Version 1"            Dec. 22, 2011    Admitted during IPECPROP00056785                                                          Track 1 Hearings (10-15-2012)
RIV000037            RK-TC-1B; RK-TC-5                    Official Transcript, ACRS Subcommittee, 12/6/2006        Dec. 22, 2011    Admitted during Track 1 Hearings (10-15-2012) 1
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit    Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000038  RK-TC-1B; RK-TC-5    NRC IN 2011-04                                            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000039  RK-TC-1B; RK-TC-5    Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, Dec. 22, 2011 Admitted during 5/12/08                                                                  Track 1 Hearings (10-15-2012)
RIV000040  RK-TC-1B; RK-TC-5    Taylor, EPRI R & D Status Report, Jan/Feb 1983            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000041  RK-TC-1B; RK-TC-5    Entergy, Table of Environmental Correction Actions for    Dec. 22, 2011 Admitted during Metal Fatigue, 11/6/07                                                  Track 1 Hearings (10-15-2012)
RIV000042  RK-TC-1B; RK-TC-5    DC Cook Charging Nozzle LR Fatigue Evaluations,            Dec. 22, 2011 Admitted during IPECPROP00061294                                                        Track 1 Hearings (10-15-2012) 2
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                              Exhibit    Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000043  RK-TC-1B; RK-TC-5    Diablo Canyon Unit 1 Insurge/Outsurge Eval,            Dec. 22, 2011 Admitted during IPECPROP00061179                                                      Track 1 Hearings (10-15-2012)
RIV000044  RK-TC-1B; RK-TC-5    NRC Bulletin 88-08                                      Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000045  RK-TC-1B; RK-TC-5    NRC Bulletin 88-08 Supp. 1                              Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000046  RK-TC-1B; RK-TC-5    NRC Bulletin 88-08 Supp. 2                              Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 3
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                              Exhibit    Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000047  RK-TC-1B; RK-TC-5    NRC IN 97-46                                            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000048  RK-TC-1B; RK-TC-5    Final Report of the NESC-Thermal Fatigue Project,      Dec. 22, 2011 Admitted during EUR22763                                                              Track 1 Hearings (10-15-2012)
RIV000049  RK-TC-1B; RK-TC-5,  Entergy Indian Point U3, FAC, 3RF13 Outage, 2005        Dec. 22, 2011 Admitted during RK-TC-2                                                                                    Track 1 Hearings (10-15-2012)
RIV000050  RK-TC-1B; RK-TC-5    Westinghouse, WCAP-14950, IPECPROP00059247              Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000051  RK-TC-1B; RK-TC-5    Kwang Chu Kim, Journal of Mechanical                    Dec. 22, 2011 Admitted during Science/Technology, 2008                                              Track 1 Hearings (10-15-2012) 4
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                              Exhibit    Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000052A RK-TC-1B; RK-TC-5    Combustion Engineering, Inc., CENC-1110                Dec. 22, 2011 Admitted during
-D                                                                                                    Track 1 Hearings (10-15-2012)
RIV000053  RK-TC-1B; RK-TC-5    Combustion Engineering, Inc., CENC-1122                Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000054  RK-TC-1B; RK-TC-5    letter from P. Bessette to D. Brancato, 10/18/11        Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000055  RK-TC-1B; RK-TC-5    Westinghouse CN-PAFM-09-64, IPECPROP00058077            Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIV000056  RK-TC-1B; RK-TC-5    Systems Standard Design Criteria, IPECPROP00059698      Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 5
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000057  RK-TC-1B; RK-TC-5    RAI Indian Point U2 and U3 LRA, 2/10/11                  Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)
RIVR00058 RK-TC-1B; RK-TC-5      Response to RAI, Indian Point U2 and U3, 3/28/11        Oct. 9, 2012  Admitted during Track 1 Hearings (10-15-2012)
RIV000102  RK-TC-5              Pre-Filed Testimony of Joram Hopenfeld in Support of RK- June 19, 2012 Admitted during TC-5                                                                  Track 1 Hearings (10-15-2012)
RIV000103  RK-TC-5; RK-TC-1B    Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation June 19, 2012 Admitted during to LMFBR Leak Detection System Design (International                  Track 1 Hearings Conference on Liquid Metal Technology, May 3-6, 1976)                  (10-15-2012) 6
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                    Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                Submission Date RIV000104  RK-TC-5; RK-TC-1B    Memorandum from S. Collins (NRR) to W. Travers (EDO),        June 19, 2012 Admitted during Re: Steam Generator Action Plan Revision to Address                        Track 1 Hearings Differing Professional Opinion on Steam Generator Tube                    (10-15-2012)
Integrity (WITS ITEM 200100026), May 11, 2011 RIV000105  RK-TC-5; RK-TC-1B    NUREG-1740, Voltage-Based Alternative Repair Criteria, A June 19, 2012    Admitted during Report to the Advisory Committee on Reactor Safeguards by                  Track 1 Hearings the Ad Hoc Subcommittee on a Differing Professional                        (10-15-2012)
Opinion (March/Feb. 2001)
RIV000106  RK-TC-5; RK-TC-1B    Associated Press, Nuke inspectors focus on 'unusual' wear on June 19, 2012 Admitted during tubes, Fox News.com, February 3, 2012                                      Track 1 Hearings (10-15-2012)
RIV000114  RK-TC-1B            Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld          June 29, 2012 Admitted during Regarding Contention NYS-26B/TC-1B - Metal Fatigue                        Track 1 Hearings (10-15-2012) 7
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000115  RK-TC-1B; RK-TC-5    NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal  June 29, 2012 Admitted during Stratification (December 20, 1988)                                    Track 1 Hearings (10-15-2012)
RIV000116  RK-TC-1B; RK-TC-5    Audit of NRCs License Renewal Program, OIG-07-A-15,    June 29, 2012 Admitted during September 6, 2007                                                    Track 1 Hearings (10-15-2012)
RIV000117  RK-TC-1B; RK-TC-5    Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie,        June 29, 2012 Admitted during Development of an Environmental Fatigue Evaluation                    Track 1 Hearings Method for Nuclear Power Plants in JSME Code* , J. of                (10-15-2012)
Environment and Engineering Vol. 6, No. 2, 2011 8
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                              Submission Date RIV000118  RK-TC-1B; RK-TC-5    G. T. Yahr and R. C. Gwaltney (Oak Ridge National          June 29, 2012 Admitted during Laboratory), Ao K. Richardson and W. L. Server (EG&G                    Track 1 Hearings Idaho, Inc), Case Study of the Propagation of a Small Flaw              (10-15-2012)
Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119  RK-TC-1B; RK-TC-5    International Atomic Energy Agency, Applicability of the  June 29, 2012 Admitted during leak before break concept, Report of the IAEA                            Track 1 Hearings Extrabudgetary Programme on the Safety of WWER-440                      (10-15-2012)
Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 9
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000132  RK-TC-2; RK-TC-5    Excerpt of IP3, RO13 FAC Inspection Report (2005),      Oct. 17, 2012 Admitted during IP00044076                                                            Track 1 Hearings (10-17-2012)
RIV000133  RK-TC-2; RK-TC-5    Excerpt of IP3, RO15 FAC Inspection Report (2009),      Oct. 17, 2012 Admitted during IPEC00213685                                                          Track 1 Hearings (10-17-2012)
RIV000134  RK-TC-5              Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld      Nov. 9, 2012  Filed/Proffered Regarding Contention NYS-38/RK-TC-5                                  duing Track 1, not Admitted RIV000135  RK-TC-5; RK-TC-1B    Entergy Ultrasonic Examination Reports, IPEC00020933    Nov. 9, 2012  Filed/Proffered duing Track 1, not Admitted 10
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000136  RK-TC-5; RK-TC-1B    New York Power Authority Ultrasonic Examination Report,    Nov. 9, 2012 Filed/Proffered Report No.: 99UT155, IPEC00021837                                      duing Track 1, not Admitted RIV000137  RK-TC-5; RK-TC-1B    New York Power Authority Ultrasonic Examination Report,    Nov. 9, 2012 Filed/Proffered Report No.: 99UT251, IPEC00021885                                      duing Track 1, not Admitted RIV000138  RK-TC-5; RK-TC-1B    J.S. Kim & J.S. Seo, Development of Engineering Formulae Nov. 9, 2012  Filed/Proffered for Stress Concentration Factors of Local Wall Thinning in              duing Track 1, not CANDU Feeder Pipe Under Pressure, Proceedings of the                    Admitted ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 RIV000139  RK-TC-5; RK-TC-1B    M.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel  Nov. 9, 2012 Filed/Proffered For SMART, Nuclear Engineering and Technology, Vol. 44,                duing Track 1, not No. 6 (August 2012)                                                    Admitted 11
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                        Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                  Submission Date RIV000140  RK-TC-5; RK-TC-1B    François Vaillant, et al., Influence of a Cyclic Loading on the Nov. 9, 2012 Filed/Proffered Initiation and Propagation of PWSCC in Weld Metal 182,                      duing Track 1, not Proceedings of the 12th International Conference on                          Admitted Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005 RIV000141  RK-TC-5; RK-TC-1B    E.C. Eggertson, et al, Turbulent Mixing and its Effects on      Nov. 9, 2012 Filed/Proffered Thermal Fatigue in Nuclear Reactors, World Academy of                        duing Track 1, not Science, Engineering and Technology 52 (2011)                                Admitted RIV000142  RK-TC-5; RK-TC-1B    Supplemental Prefiled Written Testimony of Dr. Joram            June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-26B/RK-TC-1B                              Track 2, not Admitted 12
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000143  RK-TC-5; RK-TC-1B    Supplemental Prefiled Written Testimony of Dr. Joram    June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-38/RK-TC-5                        Track 2, not Admitted RIV000144  RK-TC-5; RK-TC-1B    Supplemental Report of Dr. Joram Hopenfeld in Support of June 9, 2015 Filed/Proffered for Contention NYS-26B/RK-TC-1B and Amended Contention                    Track 2, not NYS-38/RK-TC-5 (Non-Public/Non-Redacted)                              Admitted
[PROPRIETARY]
RIV000145  RK-TC-5; RK-TC-1B    K L Murty, Materials Ageing and Degradation in Light    June 9, 2015 Filed/Proffered for Water Reactors (Woodhead Publishing Ltd. 2013)                        Track 2, not
[EXCERPT; COPYRIGHT]                                                  Admitted RIV00146A- RK-TC-5; RK-TC-1B    NUREG-1150, Severe Accident Risks: An Assessment for    June 9, 2015 Filed/Proffered for B                                Five U.S. Nuclear Power Plants (1990), available at                  Track 2, not http://www.nrc.gov/reading-rm/doc-                                    Admitted collections/nuregs/staff/sr1150/
13
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                    Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                              Submission Date RIV000147  RK-TC-5; RK-TC-1B    NUREG-75/014 (WASH-1400), Reactor Safety Study: An          June 9, 2015 Filed/Proffered for Assessment of Accident Risks in U.S. Commercial Nuclear                  Track 2, not Power Plants (1975)                                                      Admitted RIV000148  RK-TC-5; RK-TC-1B    Declaration of Dr. Joram Hopenfeld (February 12, 2015)      June 9, 2015 Filed/Proffered for
[PROPRIETARY]                                                            Track 2, not Admitted RIV000149  RK-TC-5; RK-TC-1B    Material Aging Institute International Conference on Plants June 9, 2015 Filed/Proffered for Materials Degradations, Chemical conditioning of Light                  Track 2, not Water reactors Systems (2008), IPEC00265853                              Admitted RIV000150  RK-TC-5; RK-TC-1B    ANL, Report on Assessment of Environmentally-Assisted      June 9, 2015 Filed/Proffered for Fatigue for LWR Extended Service Conditions, ANL-LWRS-                  Track 2, not 47 (September 2011)                                                      Admitted 14
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                      Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                Submission Date RIV000151  RK-TC-5; RK-TC-1B    NASA, Nuclear and Space Radiation Effects on Materials,      June 9, 2015 Filed/Proffered for NASA SP-8053 (June 1970), available at,                                    Track 2, not http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015              Admitted 558.pdf RIV000152  RK-TC-5; RK-TC-1B    G. E. Korth & M. D. Harper, Effects of Neutron Radiation      June 9, 2015 Filed/Proffered for on the Fatigue and Creep/Fatigue Behavior of Type 308                      Track 2, not Stainless Steel Weld Metal at Elevated Temperatures                        Admitted (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682 15
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                    Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                              Submission Date RIV000153  RK-TC-5; RK-TC-1B    Argonne National Laboratory, Corrosion and Mechanics of    June 9, 2015 Filed/Proffered for Materials, Light Water Reactors, Irradiation-Induced Stress              Track 2, not Corrosion Cracking of Austenitic Stainless Steels,                      Admitted http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)
RIV000154  RK-TC-5; RK-TC-1B    S. Mohanty, S. Majumdar, & K. Natesan, Argonne National    June 9, 2015 Filed/Proffered for Laboratory, A Review of Stress Corrosion Cracking/Fatigue                Track 2, not Modeling for Light Water Reactor Cooling System                          Admitted Components (June 2012)
RIV000155  RK-TC-5; RK-TC-1B    S. McKelvey & A. Fatemi, Effect of Forging Surface on      June 9, 2015 Filed/Proffered for Fatigue Behavior of Steels: A Literature Review (University              Track 2, not of Toledo)                                                              Admitted 16
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                  Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                            Submission Date RIV000156  RK-TC-5; RK-TC-1B    Westinghouse, Indian Point Unit 2 Reactor Vessel Core    June 9, 2015 Filed/Proffered for Support Pad Fatigue Reevaluation, CN-MRCDA-13-11,                      Track 2, not IPECPROP00079179 [PROPRIETARY]                                        Admitted RIV000157  RK-TC-5; RK-TC-1B    Pilkey & Pilkey, Petersons Stress Concentration Factors, June 9, 2015 Filed/Proffered for 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT;                  Track 2, not COPYRIGHT]                                                            Admitted RIV000158  RK-TC-5; RK-TC-1B    Herve Bodineau & Thierry Sollier, Tube support plate      June 9, 2015 Filed/Proffered for clogging up of French PWR steam generators, Eurosafe,                  Track 2, not IRSN - Reactor Safety Division, BP17 (2009)                            Admitted RIV000159  RK-TC-5; RK-TC-1B    NUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of June 9, 2015  Filed/Proffered for the U.S. Nuclear Regulatory Commission (2004), available              Track 2, not at http://www.nrc.gov/reading-rm/doc-                                  Admitted collections/nuregs/brochures/br0058/br0058r4.pdf 17
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                      Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                                Submission Date RIV000160  RK-TC-5; RK-TC-1B    U.S. NRC, Commissioner Apostolakis, Application of Risk      June 9, 2015  Filed/Proffered for Assessment and Management to Nuclear Safety (DOE                            Track 2, not Nuclear Safety Workshop, September 2012), available at,                    Admitted http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdf RIV000161  RK-TC-5; RK-TC-1B    Report of Dr. Joram Hopenfeld in Response to Entergy and Sept. 9, 2015      Filed/Proffered for NRC Staff Testimony Regarding Contention NYS-                              Track 2, not 26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5                          Admitted
[PROPRIETARY]
RIV000162  RK-TC-5; RK-TC-1B    Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld            Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY]                          Track 2, not Admitted RIV000163  RK-TC-5; RK-TC-1B    Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld            Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-26B/RK-TC-1B                                      Track 2, not
[PROPRIETARY]                                                              Admitted 18
 
Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),
Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit    Contentions      Exhibit Name                                                Exhibit  Exhibit Status
    #      Addressed by Exhibit                                                          Submission Date RIV000164  RK-TC-5; RK-TC-1B    NUREG-1740, ACRS, Voltage-Based Alternative Repair      Sept. 9, 2015 Filed/Proffered for Criteria: A Report to the Advisory Committee on Reactor              Track 2, not Safeguards by the Ad Hoc Subcommittee on a Differing                  Admitted Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf RIV000165  RK-TC-5; RK-TC-1B    U.S. NRC, Office of the Inspector General, OIG-07-A-15, Sept. 9, 2015 Filed/Proffered for Audit of NRCs License Renewal Program (September 6,                 Track 2, not 2007), available at,                                                 Admitted http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdf 19}}

Latest revision as of 04:43, 31 October 2019

Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List
ML15337A335
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/05/2015
From:
Riverkeeper
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28473, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15337A335 (19)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. RIVR14001 (Indian Point Nuclear Generating Units 2 and 3)

Revised: November 5, 2015 ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: RIVR14001-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:

Rejected: Stricken:

Other:

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIVR14001 All Riverkeeper Track 2 Tailored Hearing Exhibit List Nov. 5, 2015 Proffered RIV000004 RK-TC-2; RK-TC-1B; Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV") Dec. 22, 2011 Admitted during RK-TC-5 Track 1 Hearings (10-15-2012)

RIV000034 RK-TC-1B Dr.Hopenfeld Pre-filed Testimony Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000035 RK-TC-1B; RK-TC-5 Dr. Hopenfeld Report Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000036 RK-TC-1B; RK-TC-5 Westinghouse "EnvFat User's Manual Version 1" Dec. 22, 2011 Admitted during IPECPROP00056785 Track 1 Hearings (10-15-2012)

RIV000037 RK-TC-1B; RK-TC-5 Official Transcript, ACRS Subcommittee, 12/6/2006 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 1

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000038 RK-TC-1B; RK-TC-5 NRC IN 2011-04 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000039 RK-TC-1B; RK-TC-5 Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, Dec. 22, 2011 Admitted during 5/12/08 Track 1 Hearings (10-15-2012)

RIV000040 RK-TC-1B; RK-TC-5 Taylor, EPRI R & D Status Report, Jan/Feb 1983 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000041 RK-TC-1B; RK-TC-5 Entergy, Table of Environmental Correction Actions for Dec. 22, 2011 Admitted during Metal Fatigue, 11/6/07 Track 1 Hearings (10-15-2012)

RIV000042 RK-TC-1B; RK-TC-5 DC Cook Charging Nozzle LR Fatigue Evaluations, Dec. 22, 2011 Admitted during IPECPROP00061294 Track 1 Hearings (10-15-2012) 2

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000043 RK-TC-1B; RK-TC-5 Diablo Canyon Unit 1 Insurge/Outsurge Eval, Dec. 22, 2011 Admitted during IPECPROP00061179 Track 1 Hearings (10-15-2012)

RIV000044 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000045 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 1 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000046 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 2 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 3

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000047 RK-TC-1B; RK-TC-5 NRC IN 97-46 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000048 RK-TC-1B; RK-TC-5 Final Report of the NESC-Thermal Fatigue Project, Dec. 22, 2011 Admitted during EUR22763 Track 1 Hearings (10-15-2012)

RIV000049 RK-TC-1B; RK-TC-5, Entergy Indian Point U3, FAC, 3RF13 Outage, 2005 Dec. 22, 2011 Admitted during RK-TC-2 Track 1 Hearings (10-15-2012)

RIV000050 RK-TC-1B; RK-TC-5 Westinghouse, WCAP-14950, IPECPROP00059247 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000051 RK-TC-1B; RK-TC-5 Kwang Chu Kim, Journal of Mechanical Dec. 22, 2011 Admitted during Science/Technology, 2008 Track 1 Hearings (10-15-2012) 4

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000052A RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1110 Dec. 22, 2011 Admitted during

-D Track 1 Hearings (10-15-2012)

RIV000053 RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1122 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000054 RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000055 RK-TC-1B; RK-TC-5 Westinghouse CN-PAFM-09-64, IPECPROP00058077 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000056 RK-TC-1B; RK-TC-5 Systems Standard Design Criteria, IPECPROP00059698 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 5

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000057 RK-TC-1B; RK-TC-5 RAI Indian Point U2 and U3 LRA, 2/10/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIVR00058 RK-TC-1B; RK-TC-5 Response to RAI, Indian Point U2 and U3, 3/28/11 Oct. 9, 2012 Admitted during Track 1 Hearings (10-15-2012)

RIV000102 RK-TC-5 Pre-Filed Testimony of Joram Hopenfeld in Support of RK- June 19, 2012 Admitted during TC-5 Track 1 Hearings (10-15-2012)

RIV000103 RK-TC-5; RK-TC-1B Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation June 19, 2012 Admitted during to LMFBR Leak Detection System Design (International Track 1 Hearings Conference on Liquid Metal Technology, May 3-6, 1976) (10-15-2012) 6

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000104 RK-TC-5; RK-TC-1B Memorandum from S. Collins (NRR) to W. Travers (EDO), June 19, 2012 Admitted during Re: Steam Generator Action Plan Revision to Address Track 1 Hearings Differing Professional Opinion on Steam Generator Tube (10-15-2012)

Integrity (WITS ITEM 200100026), May 11, 2011 RIV000105 RK-TC-5; RK-TC-1B NUREG-1740, Voltage-Based Alternative Repair Criteria, A June 19, 2012 Admitted during Report to the Advisory Committee on Reactor Safeguards by Track 1 Hearings the Ad Hoc Subcommittee on a Differing Professional (10-15-2012)

Opinion (March/Feb. 2001)

RIV000106 RK-TC-5; RK-TC-1B Associated Press, Nuke inspectors focus on 'unusual' wear on June 19, 2012 Admitted during tubes, Fox News.com, February 3, 2012 Track 1 Hearings (10-15-2012)

RIV000114 RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld June 29, 2012 Admitted during Regarding Contention NYS-26B/TC-1B - Metal Fatigue Track 1 Hearings (10-15-2012) 7

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000115 RK-TC-1B; RK-TC-5 NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal June 29, 2012 Admitted during Stratification (December 20, 1988) Track 1 Hearings (10-15-2012)

RIV000116 RK-TC-1B; RK-TC-5 Audit of NRCs License Renewal Program, OIG-07-A-15, June 29, 2012 Admitted during September 6, 2007 Track 1 Hearings (10-15-2012)

RIV000117 RK-TC-1B; RK-TC-5 Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, June 29, 2012 Admitted during Development of an Environmental Fatigue Evaluation Track 1 Hearings Method for Nuclear Power Plants in JSME Code* , J. of (10-15-2012)

Environment and Engineering Vol. 6, No. 2, 2011 8

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000118 RK-TC-1B; RK-TC-5 G. T. Yahr and R. C. Gwaltney (Oak Ridge National June 29, 2012 Admitted during Laboratory), Ao K. Richardson and W. L. Server (EG&G Track 1 Hearings Idaho, Inc), Case Study of the Propagation of a Small Flaw (10-15-2012)

Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119 RK-TC-1B; RK-TC-5 International Atomic Energy Agency, Applicability of the June 29, 2012 Admitted during leak before break concept, Report of the IAEA Track 1 Hearings Extrabudgetary Programme on the Safety of WWER-440 (10-15-2012)

Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 9

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000132 RK-TC-2; RK-TC-5 Excerpt of IP3, RO13 FAC Inspection Report (2005), Oct. 17, 2012 Admitted during IP00044076 Track 1 Hearings (10-17-2012)

RIV000133 RK-TC-2; RK-TC-5 Excerpt of IP3, RO15 FAC Inspection Report (2009), Oct. 17, 2012 Admitted during IPEC00213685 Track 1 Hearings (10-17-2012)

RIV000134 RK-TC-5 Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Nov. 9, 2012 Filed/Proffered Regarding Contention NYS-38/RK-TC-5 duing Track 1, not Admitted RIV000135 RK-TC-5; RK-TC-1B Entergy Ultrasonic Examination Reports, IPEC00020933 Nov. 9, 2012 Filed/Proffered duing Track 1, not Admitted 10

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000136 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT155, IPEC00021837 duing Track 1, not Admitted RIV000137 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT251, IPEC00021885 duing Track 1, not Admitted RIV000138 RK-TC-5; RK-TC-1B J.S. Kim & J.S. Seo, Development of Engineering Formulae Nov. 9, 2012 Filed/Proffered for Stress Concentration Factors of Local Wall Thinning in duing Track 1, not CANDU Feeder Pipe Under Pressure, Proceedings of the Admitted ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 RIV000139 RK-TC-5; RK-TC-1B M.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel Nov. 9, 2012 Filed/Proffered For SMART, Nuclear Engineering and Technology, Vol. 44, duing Track 1, not No. 6 (August 2012) Admitted 11

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000140 RK-TC-5; RK-TC-1B François Vaillant, et al., Influence of a Cyclic Loading on the Nov. 9, 2012 Filed/Proffered Initiation and Propagation of PWSCC in Weld Metal 182, duing Track 1, not Proceedings of the 12th International Conference on Admitted Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005 RIV000141 RK-TC-5; RK-TC-1B E.C. Eggertson, et al, Turbulent Mixing and its Effects on Nov. 9, 2012 Filed/Proffered Thermal Fatigue in Nuclear Reactors, World Academy of duing Track 1, not Science, Engineering and Technology 52 (2011) Admitted RIV000142 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-26B/RK-TC-1B Track 2, not Admitted 12

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000143 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-38/RK-TC-5 Track 2, not Admitted RIV000144 RK-TC-5; RK-TC-1B Supplemental Report of Dr. Joram Hopenfeld in Support of June 9, 2015 Filed/Proffered for Contention NYS-26B/RK-TC-1B and Amended Contention Track 2, not NYS-38/RK-TC-5 (Non-Public/Non-Redacted) Admitted

[PROPRIETARY]

RIV000145 RK-TC-5; RK-TC-1B K L Murty, Materials Ageing and Degradation in Light June 9, 2015 Filed/Proffered for Water Reactors (Woodhead Publishing Ltd. 2013) Track 2, not

[EXCERPT; COPYRIGHT] Admitted RIV00146A- RK-TC-5; RK-TC-1B NUREG-1150, Severe Accident Risks: An Assessment for June 9, 2015 Filed/Proffered for B Five U.S. Nuclear Power Plants (1990), available at Track 2, not http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/staff/sr1150/

13

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000147 RK-TC-5; RK-TC-1B NUREG-75/014 (WASH-1400), Reactor Safety Study: An June 9, 2015 Filed/Proffered for Assessment of Accident Risks in U.S. Commercial Nuclear Track 2, not Power Plants (1975) Admitted RIV000148 RK-TC-5; RK-TC-1B Declaration of Dr. Joram Hopenfeld (February 12, 2015) June 9, 2015 Filed/Proffered for

[PROPRIETARY] Track 2, not Admitted RIV000149 RK-TC-5; RK-TC-1B Material Aging Institute International Conference on Plants June 9, 2015 Filed/Proffered for Materials Degradations, Chemical conditioning of Light Track 2, not Water reactors Systems (2008), IPEC00265853 Admitted RIV000150 RK-TC-5; RK-TC-1B ANL, Report on Assessment of Environmentally-Assisted June 9, 2015 Filed/Proffered for Fatigue for LWR Extended Service Conditions, ANL-LWRS- Track 2, not 47 (September 2011) Admitted 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000151 RK-TC-5; RK-TC-1B NASA, Nuclear and Space Radiation Effects on Materials, June 9, 2015 Filed/Proffered for NASA SP-8053 (June 1970), available at, Track 2, not http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015 Admitted 558.pdf RIV000152 RK-TC-5; RK-TC-1B G. E. Korth & M. D. Harper, Effects of Neutron Radiation June 9, 2015 Filed/Proffered for on the Fatigue and Creep/Fatigue Behavior of Type 308 Track 2, not Stainless Steel Weld Metal at Elevated Temperatures Admitted (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682 15

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000153 RK-TC-5; RK-TC-1B Argonne National Laboratory, Corrosion and Mechanics of June 9, 2015 Filed/Proffered for Materials, Light Water Reactors, Irradiation-Induced Stress Track 2, not Corrosion Cracking of Austenitic Stainless Steels, Admitted http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)

RIV000154 RK-TC-5; RK-TC-1B S. Mohanty, S. Majumdar, & K. Natesan, Argonne National June 9, 2015 Filed/Proffered for Laboratory, A Review of Stress Corrosion Cracking/Fatigue Track 2, not Modeling for Light Water Reactor Cooling System Admitted Components (June 2012)

RIV000155 RK-TC-5; RK-TC-1B S. McKelvey & A. Fatemi, Effect of Forging Surface on June 9, 2015 Filed/Proffered for Fatigue Behavior of Steels: A Literature Review (University Track 2, not of Toledo) Admitted 16

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000156 RK-TC-5; RK-TC-1B Westinghouse, Indian Point Unit 2 Reactor Vessel Core June 9, 2015 Filed/Proffered for Support Pad Fatigue Reevaluation, CN-MRCDA-13-11, Track 2, not IPECPROP00079179 [PROPRIETARY] Admitted RIV000157 RK-TC-5; RK-TC-1B Pilkey & Pilkey, Petersons Stress Concentration Factors, June 9, 2015 Filed/Proffered for 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT; Track 2, not COPYRIGHT] Admitted RIV000158 RK-TC-5; RK-TC-1B Herve Bodineau & Thierry Sollier, Tube support plate June 9, 2015 Filed/Proffered for clogging up of French PWR steam generators, Eurosafe, Track 2, not IRSN - Reactor Safety Division, BP17 (2009) Admitted RIV000159 RK-TC-5; RK-TC-1B NUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of June 9, 2015 Filed/Proffered for the U.S. Nuclear Regulatory Commission (2004), available Track 2, not at http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/brochures/br0058/br0058r4.pdf 17

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000160 RK-TC-5; RK-TC-1B U.S. NRC, Commissioner Apostolakis, Application of Risk June 9, 2015 Filed/Proffered for Assessment and Management to Nuclear Safety (DOE Track 2, not Nuclear Safety Workshop, September 2012), available at, Admitted http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdf RIV000161 RK-TC-5; RK-TC-1B Report of Dr. Joram Hopenfeld in Response to Entergy and Sept. 9, 2015 Filed/Proffered for NRC Staff Testimony Regarding Contention NYS- Track 2, not 26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5 Admitted

[PROPRIETARY]

RIV000162 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY] Track 2, not Admitted RIV000163 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-26B/RK-TC-1B Track 2, not

[PROPRIETARY] Admitted 18

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000164 RK-TC-5; RK-TC-1B NUREG-1740, ACRS, Voltage-Based Alternative Repair Sept. 9, 2015 Filed/Proffered for Criteria: A Report to the Advisory Committee on Reactor Track 2, not Safeguards by the Ad Hoc Subcommittee on a Differing Admitted Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf RIV000165 RK-TC-5; RK-TC-1B U.S. NRC, Office of the Inspector General, OIG-07-A-15, Sept. 9, 2015 Filed/Proffered for Audit of NRCs License Renewal Program (September 6, Track 2, not 2007), available at, Admitted http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdf 19

United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. RIVR14001 (Indian Point Nuclear Generating Units 2 and 3)

Revised: November 5, 2015 ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: RIVR14001-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn:

Rejected: Stricken:

Other:

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIVR14001 All Riverkeeper Track 2 Tailored Hearing Exhibit List Nov. 5, 2015 Proffered RIV000004 RK-TC-2; RK-TC-1B; Curriculum Vitae of Joram Hopenfeld ("Hopenfeld CV") Dec. 22, 2011 Admitted during RK-TC-5 Track 1 Hearings (10-15-2012)

RIV000034 RK-TC-1B Dr.Hopenfeld Pre-filed Testimony Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000035 RK-TC-1B; RK-TC-5 Dr. Hopenfeld Report Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000036 RK-TC-1B; RK-TC-5 Westinghouse "EnvFat User's Manual Version 1" Dec. 22, 2011 Admitted during IPECPROP00056785 Track 1 Hearings (10-15-2012)

RIV000037 RK-TC-1B; RK-TC-5 Official Transcript, ACRS Subcommittee, 12/6/2006 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 1

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000038 RK-TC-1B; RK-TC-5 NRC IN 2011-04 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000039 RK-TC-1B; RK-TC-5 Entergy Nuclear Vt. Yankee, Affidavit of Kenneth C. Chang, Dec. 22, 2011 Admitted during 5/12/08 Track 1 Hearings (10-15-2012)

RIV000040 RK-TC-1B; RK-TC-5 Taylor, EPRI R & D Status Report, Jan/Feb 1983 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000041 RK-TC-1B; RK-TC-5 Entergy, Table of Environmental Correction Actions for Dec. 22, 2011 Admitted during Metal Fatigue, 11/6/07 Track 1 Hearings (10-15-2012)

RIV000042 RK-TC-1B; RK-TC-5 DC Cook Charging Nozzle LR Fatigue Evaluations, Dec. 22, 2011 Admitted during IPECPROP00061294 Track 1 Hearings (10-15-2012) 2

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000043 RK-TC-1B; RK-TC-5 Diablo Canyon Unit 1 Insurge/Outsurge Eval, Dec. 22, 2011 Admitted during IPECPROP00061179 Track 1 Hearings (10-15-2012)

RIV000044 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000045 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 1 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000046 RK-TC-1B; RK-TC-5 NRC Bulletin 88-08 Supp. 2 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 3

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000047 RK-TC-1B; RK-TC-5 NRC IN 97-46 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000048 RK-TC-1B; RK-TC-5 Final Report of the NESC-Thermal Fatigue Project, Dec. 22, 2011 Admitted during EUR22763 Track 1 Hearings (10-15-2012)

RIV000049 RK-TC-1B; RK-TC-5, Entergy Indian Point U3, FAC, 3RF13 Outage, 2005 Dec. 22, 2011 Admitted during RK-TC-2 Track 1 Hearings (10-15-2012)

RIV000050 RK-TC-1B; RK-TC-5 Westinghouse, WCAP-14950, IPECPROP00059247 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000051 RK-TC-1B; RK-TC-5 Kwang Chu Kim, Journal of Mechanical Dec. 22, 2011 Admitted during Science/Technology, 2008 Track 1 Hearings (10-15-2012) 4

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000052A RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1110 Dec. 22, 2011 Admitted during

-D Track 1 Hearings (10-15-2012)

RIV000053 RK-TC-1B; RK-TC-5 Combustion Engineering, Inc., CENC-1122 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000054 RK-TC-1B; RK-TC-5 letter from P. Bessette to D. Brancato, 10/18/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000055 RK-TC-1B; RK-TC-5 Westinghouse CN-PAFM-09-64, IPECPROP00058077 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIV000056 RK-TC-1B; RK-TC-5 Systems Standard Design Criteria, IPECPROP00059698 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012) 5

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000057 RK-TC-1B; RK-TC-5 RAI Indian Point U2 and U3 LRA, 2/10/11 Dec. 22, 2011 Admitted during Track 1 Hearings (10-15-2012)

RIVR00058 RK-TC-1B; RK-TC-5 Response to RAI, Indian Point U2 and U3, 3/28/11 Oct. 9, 2012 Admitted during Track 1 Hearings (10-15-2012)

RIV000102 RK-TC-5 Pre-Filed Testimony of Joram Hopenfeld in Support of RK- June 19, 2012 Admitted during TC-5 Track 1 Hearings (10-15-2012)

RIV000103 RK-TC-5; RK-TC-1B Hopenfeld, Small Sodium-to-Gas Leak Behavior in Relation June 19, 2012 Admitted during to LMFBR Leak Detection System Design (International Track 1 Hearings Conference on Liquid Metal Technology, May 3-6, 1976) (10-15-2012) 6

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000104 RK-TC-5; RK-TC-1B Memorandum from S. Collins (NRR) to W. Travers (EDO), June 19, 2012 Admitted during Re: Steam Generator Action Plan Revision to Address Track 1 Hearings Differing Professional Opinion on Steam Generator Tube (10-15-2012)

Integrity (WITS ITEM 200100026), May 11, 2011 RIV000105 RK-TC-5; RK-TC-1B NUREG-1740, Voltage-Based Alternative Repair Criteria, A June 19, 2012 Admitted during Report to the Advisory Committee on Reactor Safeguards by Track 1 Hearings the Ad Hoc Subcommittee on a Differing Professional (10-15-2012)

Opinion (March/Feb. 2001)

RIV000106 RK-TC-5; RK-TC-1B Associated Press, Nuke inspectors focus on 'unusual' wear on June 19, 2012 Admitted during tubes, Fox News.com, February 3, 2012 Track 1 Hearings (10-15-2012)

RIV000114 RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld June 29, 2012 Admitted during Regarding Contention NYS-26B/TC-1B - Metal Fatigue Track 1 Hearings (10-15-2012) 7

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000115 RK-TC-1B; RK-TC-5 NRC Bulletin No. 88-11: Pressurizer Surge Line Thermal June 29, 2012 Admitted during Stratification (December 20, 1988) Track 1 Hearings (10-15-2012)

RIV000116 RK-TC-1B; RK-TC-5 Audit of NRCs License Renewal Program, OIG-07-A-15, June 29, 2012 Admitted during September 6, 2007 Track 1 Hearings (10-15-2012)

RIV000117 RK-TC-1B; RK-TC-5 Makoto Higuchi, Takao Nakamura, & Yasuaki Sugie, June 29, 2012 Admitted during Development of an Environmental Fatigue Evaluation Track 1 Hearings Method for Nuclear Power Plants in JSME Code* , J. of (10-15-2012)

Environment and Engineering Vol. 6, No. 2, 2011 8

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000118 RK-TC-1B; RK-TC-5 G. T. Yahr and R. C. Gwaltney (Oak Ridge National June 29, 2012 Admitted during Laboratory), Ao K. Richardson and W. L. Server (EG&G Track 1 Hearings Idaho, Inc), Case Study of the Propagation of a Small Flaw (10-15-2012)

Under PWR Loading Conditions and Comparison with the ASME Code Design Life, Comparison of the ASME Code Section III and XI , CONF-86072212, TI86 005150 RIV000119 RK-TC-1B; RK-TC-5 International Atomic Energy Agency, Applicability of the June 29, 2012 Admitted during leak before break concept, Report of the IAEA Track 1 Hearings Extrabudgetary Programme on the Safety of WWER-440 (10-15-2012)

Model 230 Nuclear Power Plants, Status report on a generic safety issue, IAEA-TECDOC-710, ISSN 1011-4289 (June 1993) 9

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000132 RK-TC-2; RK-TC-5 Excerpt of IP3, RO13 FAC Inspection Report (2005), Oct. 17, 2012 Admitted during IP00044076 Track 1 Hearings (10-17-2012)

RIV000133 RK-TC-2; RK-TC-5 Excerpt of IP3, RO15 FAC Inspection Report (2009), Oct. 17, 2012 Admitted during IPEC00213685 Track 1 Hearings (10-17-2012)

RIV000134 RK-TC-5 Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Nov. 9, 2012 Filed/Proffered Regarding Contention NYS-38/RK-TC-5 duing Track 1, not Admitted RIV000135 RK-TC-5; RK-TC-1B Entergy Ultrasonic Examination Reports, IPEC00020933 Nov. 9, 2012 Filed/Proffered duing Track 1, not Admitted 10

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000136 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT155, IPEC00021837 duing Track 1, not Admitted RIV000137 RK-TC-5; RK-TC-1B New York Power Authority Ultrasonic Examination Report, Nov. 9, 2012 Filed/Proffered Report No.: 99UT251, IPEC00021885 duing Track 1, not Admitted RIV000138 RK-TC-5; RK-TC-1B J.S. Kim & J.S. Seo, Development of Engineering Formulae Nov. 9, 2012 Filed/Proffered for Stress Concentration Factors of Local Wall Thinning in duing Track 1, not CANDU Feeder Pipe Under Pressure, Proceedings of the Admitted ASME 2011 Pressure Vessels & Piping Division Conference, PVP2011, July 17-21, 2011, Baltimore, Maryland, USA, PVP2011-57930 RIV000139 RK-TC-5; RK-TC-1B M.J. Jhung, Fatigue Analysis of a Reactor Pressure Vessel Nov. 9, 2012 Filed/Proffered For SMART, Nuclear Engineering and Technology, Vol. 44, duing Track 1, not No. 6 (August 2012) Admitted 11

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000140 RK-TC-5; RK-TC-1B François Vaillant, et al., Influence of a Cyclic Loading on the Nov. 9, 2012 Filed/Proffered Initiation and Propagation of PWSCC in Weld Metal 182, duing Track 1, not Proceedings of the 12th International Conference on Admitted Environmental Degradation of Materials in Nuclear Power System - Water Reactors - Edited by T.R. Allen, P.J. King, and L. Nelson TMS (The Minerals, Metals & Materials Society), 2005 RIV000141 RK-TC-5; RK-TC-1B E.C. Eggertson, et al, Turbulent Mixing and its Effects on Nov. 9, 2012 Filed/Proffered Thermal Fatigue in Nuclear Reactors, World Academy of duing Track 1, not Science, Engineering and Technology 52 (2011) Admitted RIV000142 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-26B/RK-TC-1B Track 2, not Admitted 12

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000143 RK-TC-5; RK-TC-1B Supplemental Prefiled Written Testimony of Dr. Joram June 9, 2015 Filed/Proffered for Hopenfeld Regarding Contention NYS-38/RK-TC-5 Track 2, not Admitted RIV000144 RK-TC-5; RK-TC-1B Supplemental Report of Dr. Joram Hopenfeld in Support of June 9, 2015 Filed/Proffered for Contention NYS-26B/RK-TC-1B and Amended Contention Track 2, not NYS-38/RK-TC-5 (Non-Public/Non-Redacted) Admitted

[PROPRIETARY]

RIV000145 RK-TC-5; RK-TC-1B K L Murty, Materials Ageing and Degradation in Light June 9, 2015 Filed/Proffered for Water Reactors (Woodhead Publishing Ltd. 2013) Track 2, not

[EXCERPT; COPYRIGHT] Admitted RIV00146A- RK-TC-5; RK-TC-1B NUREG-1150, Severe Accident Risks: An Assessment for June 9, 2015 Filed/Proffered for B Five U.S. Nuclear Power Plants (1990), available at Track 2, not http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/staff/sr1150/

13

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000147 RK-TC-5; RK-TC-1B NUREG-75/014 (WASH-1400), Reactor Safety Study: An June 9, 2015 Filed/Proffered for Assessment of Accident Risks in U.S. Commercial Nuclear Track 2, not Power Plants (1975) Admitted RIV000148 RK-TC-5; RK-TC-1B Declaration of Dr. Joram Hopenfeld (February 12, 2015) June 9, 2015 Filed/Proffered for

[PROPRIETARY] Track 2, not Admitted RIV000149 RK-TC-5; RK-TC-1B Material Aging Institute International Conference on Plants June 9, 2015 Filed/Proffered for Materials Degradations, Chemical conditioning of Light Track 2, not Water reactors Systems (2008), IPEC00265853 Admitted RIV000150 RK-TC-5; RK-TC-1B ANL, Report on Assessment of Environmentally-Assisted June 9, 2015 Filed/Proffered for Fatigue for LWR Extended Service Conditions, ANL-LWRS- Track 2, not 47 (September 2011) Admitted 14

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000151 RK-TC-5; RK-TC-1B NASA, Nuclear and Space Radiation Effects on Materials, June 9, 2015 Filed/Proffered for NASA SP-8053 (June 1970), available at, Track 2, not http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19710015 Admitted 558.pdf RIV000152 RK-TC-5; RK-TC-1B G. E. Korth & M. D. Harper, Effects of Neutron Radiation June 9, 2015 Filed/Proffered for on the Fatigue and Creep/Fatigue Behavior of Type 308 Track 2, not Stainless Steel Weld Metal at Elevated Temperatures Admitted (Seventh ASTM International Symposium on Effects of Radiation on Structural Materials, June 1974), available at, http://www.osti.gov/scitech/servlets/purl/4294682 15

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000153 RK-TC-5; RK-TC-1B Argonne National Laboratory, Corrosion and Mechanics of June 9, 2015 Filed/Proffered for Materials, Light Water Reactors, Irradiation-Induced Stress Track 2, not Corrosion Cracking of Austenitic Stainless Steels, Admitted http://www.ne.anl.gov/capabilities/cmm/highlights/ssc_auste nic_ss.html (last visited June 2, 2015)

RIV000154 RK-TC-5; RK-TC-1B S. Mohanty, S. Majumdar, & K. Natesan, Argonne National June 9, 2015 Filed/Proffered for Laboratory, A Review of Stress Corrosion Cracking/Fatigue Track 2, not Modeling for Light Water Reactor Cooling System Admitted Components (June 2012)

RIV000155 RK-TC-5; RK-TC-1B S. McKelvey & A. Fatemi, Effect of Forging Surface on June 9, 2015 Filed/Proffered for Fatigue Behavior of Steels: A Literature Review (University Track 2, not of Toledo) Admitted 16

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000156 RK-TC-5; RK-TC-1B Westinghouse, Indian Point Unit 2 Reactor Vessel Core June 9, 2015 Filed/Proffered for Support Pad Fatigue Reevaluation, CN-MRCDA-13-11, Track 2, not IPECPROP00079179 [PROPRIETARY] Admitted RIV000157 RK-TC-5; RK-TC-1B Pilkey & Pilkey, Petersons Stress Concentration Factors, June 9, 2015 Filed/Proffered for 3rd Edition, ISBN: 978-0-470-04824-5 (2008) [EXCERPT; Track 2, not COPYRIGHT] Admitted RIV000158 RK-TC-5; RK-TC-1B Herve Bodineau & Thierry Sollier, Tube support plate June 9, 2015 Filed/Proffered for clogging up of French PWR steam generators, Eurosafe, Track 2, not IRSN - Reactor Safety Division, BP17 (2009) Admitted RIV000159 RK-TC-5; RK-TC-1B NUREG/BR-0058, Rev.4, Regulatory Analysis Guidelines of June 9, 2015 Filed/Proffered for the U.S. Nuclear Regulatory Commission (2004), available Track 2, not at http://www.nrc.gov/reading-rm/doc- Admitted collections/nuregs/brochures/br0058/br0058r4.pdf 17

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000160 RK-TC-5; RK-TC-1B U.S. NRC, Commissioner Apostolakis, Application of Risk June 9, 2015 Filed/Proffered for Assessment and Management to Nuclear Safety (DOE Track 2, not Nuclear Safety Workshop, September 2012), available at, Admitted http://energy.gov/sites/prod/files/2013/12/f5/Apostolakis.pdf RIV000161 RK-TC-5; RK-TC-1B Report of Dr. Joram Hopenfeld in Response to Entergy and Sept. 9, 2015 Filed/Proffered for NRC Staff Testimony Regarding Contention NYS- Track 2, not 26/RK0TC-1B and Amended Contention NYS-38/RK-TC-5 Admitted

[PROPRIETARY]

RIV000162 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-38/RK-TC-5 [PROPRIETARY] Track 2, not Admitted RIV000163 RK-TC-5; RK-TC-1B Prefiled Rebuttal Testimony of Dr. Joram Hopenfeld Sept. 9, 2015 Filed/Proffered for Regarding Contention NYS-26B/RK-TC-1B Track 2, not

[PROPRIETARY] Admitted 18

Entergy Nuclear Operations, Inc. (Indian Point Units 2 and 3),

Docket Nos. 50-247-LR and 50-286-LR, ASLBP No. 07-858-03-LR-BD01 Evidentiary Hearing Riverkeeper ("RIV") Hearing Exhibits RIV Exhibit Contentions Exhibit Name Exhibit Exhibit Status

  1. Addressed by Exhibit Submission Date RIV000164 RK-TC-5; RK-TC-1B NUREG-1740, ACRS, Voltage-Based Alternative Repair Sept. 9, 2015 Filed/Proffered for Criteria: A Report to the Advisory Committee on Reactor Track 2, not Safeguards by the Ad Hoc Subcommittee on a Differing Admitted Professional Opinion (2001), available at, http://pbadupws.nrc.gov/docs/ML0107/ML010750315.pdf RIV000165 RK-TC-5; RK-TC-1B U.S. NRC, Office of the Inspector General, OIG-07-A-15, Sept. 9, 2015 Filed/Proffered for Audit of NRCs License Renewal Program (September 6, Track 2, not 2007), available at, Admitted http://pbadupws.nrc.gov/docs/ML0724/ML072490486.pdf 19