ML16015A376: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Unit 5Units 1 & 2Units 3 & 4Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS UserCommunityCLIENTFPLMIAMI-DADE COUNTY, FLORIDAStack LocationsFacility LayoutTurkey Point Plant Property BoundaryISFSI StorageBuilding Certified AreaUnit 5 Certified AreaUnits 3 & 4 Certified AreaREFERENCEFACILITY LAYOUT, GOLDER ASSOCIATES INC., 2009-2014PROJECTFPL TURKEY POINT CCS SALINITY REDUCTION PROJECTTITLEEXISTING FACILITY LAYOUT1303064A00301.1-12014-09-05NRLNRLKJKKFK1 in0Path:  IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET HAS BEEN MODIFIED FROM: ANSI ACONSULTANTPROJECT No.CONTROLRev.FIGUREYYYY-MM-DD PREPAREDDESIGNREVIEWAPPROVEDLEGEND5000500250FEET1:6,000 Unit 5Units 1 & 2Units 3 & 4Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS UserCommunityCLIENTFPLMIAMI-DADE COUNTY, FLORIDAStack LocationsFacility LayoutTurkey Point Plant Property BoundaryISFSI StorageBuilding Certified AreaUnit 5 Certified AreaUnits 3 & 4 Certified AreaREFERENCEFACILITY LAYOUT, GOLDER ASSOCIATES INC., 2009-2014PROJECTFPL TURKEY POINT CCS SALINITY REDUCTION PROJECTTITLEEXISTING FACILITY LAYOUT1303064A00301.1-12014-09-05NRLNRLKJKKFK1 in0Path:  IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET HAS BEEN MODIFIED FROM: ANSI ACONSULTANTPROJECT No.CONTROLRev.FIGUREYYYY-MM-DD PREPAREDDESIGNREVIEWAPPROVEDLEGEND5000500250FEET1:6,000}}
{{#Wiki_filter:Path:
United States Nuclear Regulatory Commission Official Hearing Exhibit LEGEND Stack Locations Facility Layout                              In the Matter of:              FLORIDA POWER & LIGHT COMPANY Turkey Point Plant Property Boundary ISFSI Storage                                                            (Turkey Point Nuclear Generating, Units 3 and 4)
Building Certified Area Unit 5 Certified Area Units 3 & 4 Certified Area                                    ASLBP #: 15-935-02-LA-BD01 Unit 5 Docket #: 05000250 & 05000251 Exhibit #: FPL-005-00-BD01                  Identified: 1/4/2016 Admitted: 1/4/2016                          Withdrawn:
Rejected:                                    Stricken:
Units 1 & 2                                                                                                                                  Other:
REFERENCE Units 3 & 4 FACILITY LAYOUT, GOLDER ASSOCIATES INC., 2009-2014 CLIENT FPL MIAMI-DADE COUNTY, FLORIDA PROJECT FPL TURKEY POINT CCS SALINITY REDUCTION PROJECT TITLE EXISTING FACILITY LAYOUT IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET HAS BEEN MODIFIED FROM: ANSI A CONSULTANT                            YYYY-MM-DD                       2014-09-05                                                                                        1 in PREPARED                        NRL DESIGN                          NRL 500      250  0  500                                                                                                                      REVIEW                          KJK Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,                                         APPROVED                        KFK FPL-005 Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User    PROJECT No.        CONTROL                          Rev.                                                              FIGURE 1:6,000            FEET              Community                                                      1303064            A003                            0                                                                1.1-1                                            0
 
Path:
United States Nuclear Regulatory Commission Official Hearing Exhibit LEGEND Stack Locations Facility Layout                              In the Matter of:              FLORIDA POWER & LIGHT COMPANY Turkey Point Plant Property Boundary ISFSI Storage                                                            (Turkey Point Nuclear Generating, Units 3 and 4)
Building Certified Area Unit 5 Certified Area Units 3 & 4 Certified Area                                    ASLBP #: 15-935-02-LA-BD01 Unit 5 Docket #: 05000250 & 05000251 Exhibit #: FPL-005-00-BD01                  Identified: 1/4/2016 Admitted: 1/4/2016                          Withdrawn:
Rejected:                                    Stricken:
Units 1 & 2                                                                                                                                  Other:
REFERENCE Units 3 & 4 FACILITY LAYOUT, GOLDER ASSOCIATES INC., 2009-2014 CLIENT FPL MIAMI-DADE COUNTY, FLORIDA PROJECT FPL TURKEY POINT CCS SALINITY REDUCTION PROJECT TITLE EXISTING FACILITY LAYOUT IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET HAS BEEN MODIFIED FROM: ANSI A CONSULTANT                            YYYY-MM-DD                       2014-09-05                                                                                        1 in PREPARED                        NRL DESIGN                          NRL 500      250  0  500                                                                                                                      REVIEW                          KJK Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX,                                        APPROVED                        KFK FPL-005 Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User    PROJECT No.        CONTROL                          Rev.                                                              FIGURE 1:6,000            FEET              Community                                                      1303064            A003                            0                                                                1.1-1                                            0}}

Latest revision as of 02:06, 31 October 2019

Official Exhibit - FPL-005-00-BD01 - Map of Turkey Point Facility Layout (Figure from 2014 Turkey Point Units 3-5 Site Certification Modification Application)
ML16015A376
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/05/2014
From:
Florida Power & Light Co
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 28494, ASLBP 15-935-02-LA-BD01, 50-250-LA, 50-251-LA
Download: ML16015A376 (1)


Text

Path:

United States Nuclear Regulatory Commission Official Hearing Exhibit LEGEND Stack Locations Facility Layout In the Matter of: FLORIDA POWER & LIGHT COMPANY Turkey Point Plant Property Boundary ISFSI Storage (Turkey Point Nuclear Generating, Units 3 and 4)

Building Certified Area Unit 5 Certified Area Units 3 & 4 Certified Area ASLBP #: 15-935-02-LA-BD01 Unit 5 Docket #: 05000250 & 05000251 Exhibit #: FPL-005-00-BD01 Identified: 1/4/2016 Admitted: 1/4/2016 Withdrawn:

Rejected: Stricken:

Units 1 & 2 Other:

REFERENCE Units 3 & 4 FACILITY LAYOUT, GOLDER ASSOCIATES INC., 2009-2014 CLIENT FPL MIAMI-DADE COUNTY, FLORIDA PROJECT FPL TURKEY POINT CCS SALINITY REDUCTION PROJECT TITLE EXISTING FACILITY LAYOUT IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET HAS BEEN MODIFIED FROM: ANSI A CONSULTANT YYYY-MM-DD 2014-09-05 1 in PREPARED NRL DESIGN NRL 500 250 0 500 REVIEW KJK Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, APPROVED KFK FPL-005 Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User PROJECT No. CONTROL Rev. FIGURE 1:6,000 FEET Community 1303064 A003 0 1.1-1 0

Path:

United States Nuclear Regulatory Commission Official Hearing Exhibit LEGEND Stack Locations Facility Layout In the Matter of: FLORIDA POWER & LIGHT COMPANY Turkey Point Plant Property Boundary ISFSI Storage (Turkey Point Nuclear Generating, Units 3 and 4)

Building Certified Area Unit 5 Certified Area Units 3 & 4 Certified Area ASLBP #: 15-935-02-LA-BD01 Unit 5 Docket #: 05000250 & 05000251 Exhibit #: FPL-005-00-BD01 Identified: 1/4/2016 Admitted: 1/4/2016 Withdrawn:

Rejected: Stricken:

Units 1 & 2 Other:

REFERENCE Units 3 & 4 FACILITY LAYOUT, GOLDER ASSOCIATES INC., 2009-2014 CLIENT FPL MIAMI-DADE COUNTY, FLORIDA PROJECT FPL TURKEY POINT CCS SALINITY REDUCTION PROJECT TITLE EXISTING FACILITY LAYOUT IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET HAS BEEN MODIFIED FROM: ANSI A CONSULTANT YYYY-MM-DD 2014-09-05 1 in PREPARED NRL DESIGN NRL 500 250 0 500 REVIEW KJK Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, APPROVED KFK FPL-005 Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User PROJECT No. CONTROL Rev. FIGURE 1:6,000 FEET Community 1303064 A003 0 1.1-1 0