{{#Wiki_filter:From: Buckberg, Perry To: Docket, Hearing
{{#Wiki_filter:From:               Buckberg, Perry To:                 Docket, Hearing; Pepperl, Nicole; Scro, Jennifer
; Pepperl, Nicole
; Scro, Jennifer


==Subject:==
==Subject:==
RE: FPL"s Turkey Point Permit Comment Period Date: Friday, January 15, 2016 8:37:28 AM Good morning, I am acting as the NRR/DORL Turkey Point Project Manager while the Lead PM (Audrey
RE: FPL"s Turkey Point Permit Comment Period Date:               Friday, January 15, 2016 8:37:28 AM Good morning, I am acting as the NRR/DORL Turkey Point Project Manager while the Lead PM (Audrey Klett) is out of the office.
 
The comments below look to be intended for the official hearing record for this weeks Turkey Point cooling canals hearing (Jan. 11, 2016 in Homestead, FL) but were submitted via an OPA feedback form. I am forwarding the comments to youbut I can provide Notice of Hearing submittal requirements with this member of the public if needed. Please let me know.
Klett) is out of the office.
: Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03 From: Buckberg, Perry Sent: Friday, January 15, 2016 7:54 AM To: Hannah, Roger; Klett, Audrey; Williamson, Alicia Cc: Ledford, Joey
 
The comments below look to be intended for the official hearing record for this week's Turkey Point cooling canals hearing (Jan. 11, 2016 in Homestead, FL) but were submitted
 
via an OPA feedback form.
I am forwarding the comments to you-but I can provide
 
'Notice of Hearing' submittal requirements with this member of the public if needed. Please
 
let me know.
 
Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383     O-08E03 From: Buckberg, Perry Sent: Friday, January 15, 2016 7:54 AM To: Hannah, Roger; Klett, Audrey; Williamson, Alicia Cc: Ledford, Joey


==Subject:==
==Subject:==
RE: FPL's Turkey Point Permit Comment Period Thanks Roger.
RE: FPL's Turkey Point Permit Comment Period Thanks Roger.
 
I will ensure these comments are included 'in the official hearings record on these issues' as requested and as appropriate.
I will ensure these comments are included 'in the official hearings record on these issues'
: Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03
 
-----Original Message-----
as requested and as appropriate.
From: Hannah, Roger Sent: Friday, January 15, 2016 7:40 AM To: Klett, Audrey; Buckberg, Perry; Williamson, Alicia Cc: Ledford, Joey
Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383     O-08E03 -----Original Message-----
 
From: Hannah, Roger  
 
Sent: Friday, January 15, 2016 7:40 AM
 
To: Klett, Audrey; Buckberg, Perry; Williamson, Alicia
 
Cc: Ledford, Joey


==Subject:==
==Subject:==
FW: FPL's Turkey Point Permit Comment Period
FW: FPL's Turkey Point Permit Comment Period This came in through our public web page and I'm not sure who should get it or if this individual has provided these comments in some other manner, but I'm sending it to all of you so that it hopefully gets to the right place.
 
: Thanks, Roger Hannah, APR Senior Public Affairs Officer Region II -- Atlanta, Ga.
This came in through our public web page and I'm not sure who should get it or if this
Office - 404-997-4417 Mobile - 404-317-3879 roger.hannah@nrc.gov
 
individual has provided these comments in some other manner, but I'm sending it to all of
 
you so that it hopefully gets to the right place.
Thanks, Roger Hannah, APR
 
Senior Public Affairs Officer
 
Region II -- Atlanta, Ga.
 
Office - 404-997-4417
 
Mobile - 404-317-3879
 
roger.hannah@nrc.gov
 
-----Original Message-----
-----Original Message-----
 
From: Larry E. Fink, M.S. [mailto:larryfink@waterwiseconsulting.com]
From: Larry E. Fink, M.S. [
Sent: Thursday, January 14, 2016 5:04 PM To: OPA2 Resource <OPA2.Resource@nrc.gov>
mailto:larryfink@waterwiseconsulting.com
]Sent: Thursday, January 14, 2016 5:04 PM
 
To: OPA2 Resource <
OPA2.Resource@nrc.gov
>


==Subject:==
==Subject:==
FPL's Turkey Point Permit Comment Period
FPL's Turkey Point Permit Comment Period Below is the result of your feedback form. It was submitted by Larry E. Fink, M.S. (larryfink@waterwiseconsulting.com) on Thursday, January 14, 2016 at 17:04:27 through the IP 216.246.75.15 using the form at http://www.nrc.gov/about-nrc/public-affairs/contact-opa.html and resulted in this email to opa2.resource@nrc.gov
 
Below is the result of your feedback form.
It was submitted by
 
Larry E. Fink, M.S. (larryfink@waterwiseconsulting.com) on Thursday, January 14, 2016 at 17:04:27
 
through the IP 216.246.75.15
 
using the form at http://www.nrc.gov/about-nrc/public-affairs/contact-opa.html
 
and resulted in this email to opa2.resource@nrc.gov
 
---------------------------------------------------------------------------
---------------------------------------------------------------------------
comments: The old Turkey Point units are operating outside of permit limits regarding fresh cooling water flow, water temperature, salinity and radionuclides and the combined facility-contaminated groundwater and surface water loads to Biscayne Bay are causing or contributing to a violation of Water Quality Standards, and the routine operation of new Units 6 and 7 will just exacerbate these problems when the old units consume more fresh surface and ground water than they were originally allocated and more pollution assimilation capacities in the groundwater and surface water to which its regulated and unregulated discharges are effluent. In addition, FPL misrepresented the source of tritium in the groundwater underlying the facility and confluence with Biscayne Bay as primarily natural rather than unnatural in origin, a misrepresentation for which it was held to account by scientists working for the South Florida Water Management District under the aegis of its Executive Director, Carol Wehle. Please include these comments in the official hearings record on these issues. Operation of the old units should be scaled back until the more restrictive of the fresh water flow, temperature, or salinity on the source side or pollution load limits are met on the receiving waters side based on a USGS-approved, calibrated, and validated combined surface water-groundwater water quantity and quality model. This temporary emergency operating condition should continue until such time as the EIS for the combined operation of the old and new units are revised to reflect these new circumstances and the ability for FPL to provide the required reasonable assurances reconsidered.


comments: The old Turkey Point units are operating outside of permit limits regarding fresh cooling water flow, water temperature, salinity and radionuclides and the combined facility-contaminated groundwater and surface water loads to Biscayne Bay are causing or contributing to a violation of Water Quality Standards, and the routine operation of new Units 6 and 7 will just exacerbate these problems when the old units consume more fresh surface and ground water than they were originally allocated and more pollution assimilation capacities in the groundwater and surface water to which its regulated and unregulated discharges are effluent. In addition, FPL misrepresented the source of tritium in the groundwater underlying the facility and confluence with Biscayne Bay as primarily natural rather than unnatural in origin, a misrepresentation for which it was held to account by scientists working for the South Florida Water Management District under the aegis of its Executive Director, Carol Wehle. Please include these comments in the official hearings record on these issues. Operation of the old units should be scaled back until the more restrictive of the fresh water flow, temperature, or salinity on the source side or pollution load limits are met on the receiving waters side based on a USGS-approved, calibrated, and validated combined surface water-groundwater water quantity and quality model. This temporary emergency operating condition should continue until such time as the EIS for the combined operation of the old and new units are revised to reflect these new circumstances and the ability for FPL to provide the required reasonable assurances reconsidered.
Thank you.
Thank you.
 
Larry E Fink, M.S Owner and Principal Waterwise Consulting, LLC organization: Waterwise Consulting, LLC address1: 1601 S. Ocean Drive address2: Suite 406 city: Hollywood state: FL zip: 33019 country: USA phone: 954-923-7374
Larry E Fink, M.S
 
Owner and Principal
 
Waterwise Consulting, LLC
 
organization: Waterwise Consulting, LLC
 
address1: 1601 S. Ocean Drive
 
address2: Suite 406
 
city: Hollywood
 
state: FL
 
zip: 33019
 
country: USA
 
phone: 954-923-7374
 
---------------------------------------------------------------------------
---------------------------------------------------------------------------


From: Buckberg, Perry To: Docket, Hearing
From:               Buckberg, Perry To:                 Docket, Hearing; Pepperl, Nicole; Scro, Jennifer
; Pepperl, Nicole
; Scro, Jennifer


==Subject:==
==Subject:==
RE: FPL"s Turkey Point Permit Comment Period Date: Friday, January 15, 2016 8:37:28 AM Good morning, I am acting as the NRR/DORL Turkey Point Project Manager while the Lead PM (Audrey
RE: FPL"s Turkey Point Permit Comment Period Date:               Friday, January 15, 2016 8:37:28 AM Good morning, I am acting as the NRR/DORL Turkey Point Project Manager while the Lead PM (Audrey Klett) is out of the office.
 
The comments below look to be intended for the official hearing record for this weeks Turkey Point cooling canals hearing (Jan. 11, 2016 in Homestead, FL) but were submitted via an OPA feedback form. I am forwarding the comments to youbut I can provide Notice of Hearing submittal requirements with this member of the public if needed. Please let me know.
Klett) is out of the office.
: Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03 From: Buckberg, Perry Sent: Friday, January 15, 2016 7:54 AM To: Hannah, Roger; Klett, Audrey; Williamson, Alicia Cc: Ledford, Joey
 
The comments below look to be intended for the official hearing record for this week's Turkey Point cooling canals hearing (Jan. 11, 2016 in Homestead, FL) but were submitted
 
via an OPA feedback form.
I am forwarding the comments to you-but I can provide
 
'Notice of Hearing' submittal requirements with this member of the public if needed. Please
 
let me know.
 
Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383     O-08E03 From: Buckberg, Perry Sent: Friday, January 15, 2016 7:54 AM To: Hannah, Roger; Klett, Audrey; Williamson, Alicia Cc: Ledford, Joey


==Subject:==
==Subject:==
RE: FPL's Turkey Point Permit Comment Period Thanks Roger.
RE: FPL's Turkey Point Permit Comment Period Thanks Roger.
 
I will ensure these comments are included 'in the official hearings record on these issues' as requested and as appropriate.
I will ensure these comments are included 'in the official hearings record on these issues'
: Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03
 
-----Original Message-----
as requested and as appropriate.
From: Hannah, Roger Sent: Friday, January 15, 2016 7:40 AM To: Klett, Audrey; Buckberg, Perry; Williamson, Alicia Cc: Ledford, Joey
Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383     O-08E03 -----Original Message-----
 
From: Hannah, Roger  
 
Sent: Friday, January 15, 2016 7:40 AM
 
To: Klett, Audrey; Buckberg, Perry; Williamson, Alicia
 
Cc: Ledford, Joey


==Subject:==
==Subject:==
FW: FPL's Turkey Point Permit Comment Period
FW: FPL's Turkey Point Permit Comment Period This came in through our public web page and I'm not sure who should get it or if this individual has provided these comments in some other manner, but I'm sending it to all of you so that it hopefully gets to the right place.
 
: Thanks, Roger Hannah, APR Senior Public Affairs Officer Region II -- Atlanta, Ga.
This came in through our public web page and I'm not sure who should get it or if this
Office - 404-997-4417 Mobile - 404-317-3879 roger.hannah@nrc.gov
 
individual has provided these comments in some other manner, but I'm sending it to all of
 
you so that it hopefully gets to the right place.
Thanks, Roger Hannah, APR
 
Senior Public Affairs Officer
 
Region II -- Atlanta, Ga.
 
Office - 404-997-4417
 
Mobile - 404-317-3879
 
roger.hannah@nrc.gov
 
-----Original Message-----
-----Original Message-----
 
From: Larry E. Fink, M.S. [mailto:larryfink@waterwiseconsulting.com]
From: Larry E. Fink, M.S. [
Sent: Thursday, January 14, 2016 5:04 PM To: OPA2 Resource <OPA2.Resource@nrc.gov>
mailto:larryfink@waterwiseconsulting.com
]Sent: Thursday, January 14, 2016 5:04 PM
 
To: OPA2 Resource <
OPA2.Resource@nrc.gov
>


==Subject:==
==Subject:==
FPL's Turkey Point Permit Comment Period
FPL's Turkey Point Permit Comment Period Below is the result of your feedback form. It was submitted by Larry E. Fink, M.S. (larryfink@waterwiseconsulting.com) on Thursday, January 14, 2016 at 17:04:27 through the IP 216.246.75.15 using the form at http://www.nrc.gov/about-nrc/public-affairs/contact-opa.html and resulted in this email to opa2.resource@nrc.gov
 
Below is the result of your feedback form.
It was submitted by
 
Larry E. Fink, M.S. (larryfink@waterwiseconsulting.com) on Thursday, January 14, 2016 at 17:04:27
 
through the IP 216.246.75.15
 
using the form at http://www.nrc.gov/about-nrc/public-affairs/contact-opa.html
 
and resulted in this email to opa2.resource@nrc.gov
 
---------------------------------------------------------------------------
---------------------------------------------------------------------------
comments: The old Turkey Point units are operating outside of permit limits regarding fresh cooling water flow, water temperature, salinity and radionuclides and the combined facility-contaminated groundwater and surface water loads to Biscayne Bay are causing or contributing to a violation of Water Quality Standards, and the routine operation of new Units 6 and 7 will just exacerbate these problems when the old units consume more fresh surface and ground water than they were originally allocated and more pollution assimilation capacities in the groundwater and surface water to which its regulated and unregulated discharges are effluent. In addition, FPL misrepresented the source of tritium in the groundwater underlying the facility and confluence with Biscayne Bay as primarily natural rather than unnatural in origin, a misrepresentation for which it was held to account by scientists working for the South Florida Water Management District under the aegis of its Executive Director, Carol Wehle. Please include these comments in the official hearings record on these issues. Operation of the old units should be scaled back until the more restrictive of the fresh water flow, temperature, or salinity on the source side or pollution load limits are met on the receiving waters side based on a USGS-approved, calibrated, and validated combined surface water-groundwater water quantity and quality model. This temporary emergency operating condition should continue until such time as the EIS for the combined operation of the old and new units are revised to reflect these new circumstances and the ability for FPL to provide the required reasonable assurances reconsidered.


comments: The old Turkey Point units are operating outside of permit limits regarding fresh cooling water flow, water temperature, salinity and radionuclides and the combined facility-contaminated groundwater and surface water loads to Biscayne Bay are causing or contributing to a violation of Water Quality Standards, and the routine operation of new Units 6 and 7 will just exacerbate these problems when the old units consume more fresh surface and ground water than they were originally allocated and more pollution assimilation capacities in the groundwater and surface water to which its regulated and unregulated discharges are effluent. In addition, FPL misrepresented the source of tritium in the groundwater underlying the facility and confluence with Biscayne Bay as primarily natural rather than unnatural in origin, a misrepresentation for which it was held to account by scientists working for the South Florida Water Management District under the aegis of its Executive Director, Carol Wehle. Please include these comments in the official hearings record on these issues. Operation of the old units should be scaled back until the more restrictive of the fresh water flow, temperature, or salinity on the source side or pollution load limits are met on the receiving waters side based on a USGS-approved, calibrated, and validated combined surface water-groundwater water quantity and quality model. This temporary emergency operating condition should continue until such time as the EIS for the combined operation of the old and new units are revised to reflect these new circumstances and the ability for FPL to provide the required reasonable assurances reconsidered.
Thank you.
Thank you.
 
Larry E Fink, M.S Owner and Principal Waterwise Consulting, LLC organization: Waterwise Consulting, LLC address1: 1601 S. Ocean Drive address2: Suite 406 city: Hollywood state: FL zip: 33019 country: USA phone: 954-923-7374
Larry E Fink, M.S
 
Owner and Principal
 
Waterwise Consulting, LLC
 
organization: Waterwise Consulting, LLC
 
address1: 1601 S. Ocean Drive
 
address2: Suite 406
 
city: Hollywood
 
state: FL
 
zip: 33019
 
country: USA
 
phone: 954-923-7374
 
---------------------------------------------------------------------------}}
---------------------------------------------------------------------------}}

Revision as of 03:00, 31 October 2019

Limited Appearance Statement of Larry Fink Regarding Turkey Point, Units 3 and 4, License Amendment Request
ML16019A357
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/14/2016
From: Fink L
Waterwise Consulting
To:
Atomic Safety and Licensing Board Panel, NRC/SECY
SECY/RAS
References
50-250-LA, 50-251-LA, ASLBP 15-935-02-LA-BD01, VVV-28
Download: ML16019A357 (3)


Text

From: Buckberg, Perry To: Docket, Hearing; Pepperl, Nicole; Scro, Jennifer

Subject:

RE: FPL"s Turkey Point Permit Comment Period Date: Friday, January 15, 2016 8:37:28 AM Good morning, I am acting as the NRR/DORL Turkey Point Project Manager while the Lead PM (Audrey Klett) is out of the office.

The comments below look to be intended for the official hearing record for this weeks Turkey Point cooling canals hearing (Jan. 11, 2016 in Homestead, FL) but were submitted via an OPA feedback form. I am forwarding the comments to youbut I can provide Notice of Hearing submittal requirements with this member of the public if needed. Please let me know.

Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03 From: Buckberg, Perry Sent: Friday, January 15, 2016 7:54 AM To: Hannah, Roger; Klett, Audrey; Williamson, Alicia Cc: Ledford, Joey

Subject:

RE: FPL's Turkey Point Permit Comment Period Thanks Roger.

I will ensure these comments are included 'in the official hearings record on these issues' as requested and as appropriate.

Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03

Original Message-----

From: Hannah, Roger Sent: Friday, January 15, 2016 7:40 AM To: Klett, Audrey; Buckberg, Perry; Williamson, Alicia Cc: Ledford, Joey

Subject:

FW: FPL's Turkey Point Permit Comment Period This came in through our public web page and I'm not sure who should get it or if this individual has provided these comments in some other manner, but I'm sending it to all of you so that it hopefully gets to the right place.

Thanks, Roger Hannah, APR Senior Public Affairs Officer Region II -- Atlanta, Ga.

Office - 404-997-4417 Mobile - 404-317-3879 roger.hannah@nrc.gov


Original Message-----

From: Larry E. Fink, M.S. [1]

Sent: Thursday, January 14, 2016 5:04 PM To: OPA2 Resource <OPA2.Resource@nrc.gov>

Subject:

FPL's Turkey Point Permit Comment Period Below is the result of your feedback form. It was submitted by Larry E. Fink, M.S. (larryfink@waterwiseconsulting.com) on Thursday, January 14, 2016 at 17:04:27 through the IP 216.246.75.15 using the form at http://www.nrc.gov/about-nrc/public-affairs/contact-opa.html and resulted in this email to opa2.resource@nrc.gov


comments: The old Turkey Point units are operating outside of permit limits regarding fresh cooling water flow, water temperature, salinity and radionuclides and the combined facility-contaminated groundwater and surface water loads to Biscayne Bay are causing or contributing to a violation of Water Quality Standards, and the routine operation of new Units 6 and 7 will just exacerbate these problems when the old units consume more fresh surface and ground water than they were originally allocated and more pollution assimilation capacities in the groundwater and surface water to which its regulated and unregulated discharges are effluent. In addition, FPL misrepresented the source of tritium in the groundwater underlying the facility and confluence with Biscayne Bay as primarily natural rather than unnatural in origin, a misrepresentation for which it was held to account by scientists working for the South Florida Water Management District under the aegis of its Executive Director, Carol Wehle. Please include these comments in the official hearings record on these issues. Operation of the old units should be scaled back until the more restrictive of the fresh water flow, temperature, or salinity on the source side or pollution load limits are met on the receiving waters side based on a USGS-approved, calibrated, and validated combined surface water-groundwater water quantity and quality model. This temporary emergency operating condition should continue until such time as the EIS for the combined operation of the old and new units are revised to reflect these new circumstances and the ability for FPL to provide the required reasonable assurances reconsidered.

Thank you.

Larry E Fink, M.S Owner and Principal Waterwise Consulting, LLC organization: Waterwise Consulting, LLC address1: 1601 S. Ocean Drive address2: Suite 406 city: Hollywood state: FL zip: 33019 country: USA phone: 954-923-7374


From: Buckberg, Perry To: Docket, Hearing; Pepperl, Nicole; Scro, Jennifer

Subject:

RE: FPL"s Turkey Point Permit Comment Period Date: Friday, January 15, 2016 8:37:28 AM Good morning, I am acting as the NRR/DORL Turkey Point Project Manager while the Lead PM (Audrey Klett) is out of the office.

The comments below look to be intended for the official hearing record for this weeks Turkey Point cooling canals hearing (Jan. 11, 2016 in Homestead, FL) but were submitted via an OPA feedback form. I am forwarding the comments to youbut I can provide Notice of Hearing submittal requirements with this member of the public if needed. Please let me know.

Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03 From: Buckberg, Perry Sent: Friday, January 15, 2016 7:54 AM To: Hannah, Roger; Klett, Audrey; Williamson, Alicia Cc: Ledford, Joey

Subject:

RE: FPL's Turkey Point Permit Comment Period Thanks Roger.

I will ensure these comments are included 'in the official hearings record on these issues' as requested and as appropriate.

Thanks, Perry Buckberg Senior Project Manager Office of Nuclear Reactor Regulation 415-1383 O-08E03

Original Message-----

From: Hannah, Roger Sent: Friday, January 15, 2016 7:40 AM To: Klett, Audrey; Buckberg, Perry; Williamson, Alicia Cc: Ledford, Joey

Subject:

FW: FPL's Turkey Point Permit Comment Period This came in through our public web page and I'm not sure who should get it or if this individual has provided these comments in some other manner, but I'm sending it to all of you so that it hopefully gets to the right place.

Thanks, Roger Hannah, APR Senior Public Affairs Officer Region II -- Atlanta, Ga.

Office - 404-997-4417 Mobile - 404-317-3879 roger.hannah@nrc.gov


Original Message-----

From: Larry E. Fink, M.S. [2]

Sent: Thursday, January 14, 2016 5:04 PM To: OPA2 Resource <OPA2.Resource@nrc.gov>

Subject:

FPL's Turkey Point Permit Comment Period Below is the result of your feedback form. It was submitted by Larry E. Fink, M.S. (larryfink@waterwiseconsulting.com) on Thursday, January 14, 2016 at 17:04:27 through the IP 216.246.75.15 using the form at http://www.nrc.gov/about-nrc/public-affairs/contact-opa.html and resulted in this email to opa2.resource@nrc.gov


comments: The old Turkey Point units are operating outside of permit limits regarding fresh cooling water flow, water temperature, salinity and radionuclides and the combined facility-contaminated groundwater and surface water loads to Biscayne Bay are causing or contributing to a violation of Water Quality Standards, and the routine operation of new Units 6 and 7 will just exacerbate these problems when the old units consume more fresh surface and ground water than they were originally allocated and more pollution assimilation capacities in the groundwater and surface water to which its regulated and unregulated discharges are effluent. In addition, FPL misrepresented the source of tritium in the groundwater underlying the facility and confluence with Biscayne Bay as primarily natural rather than unnatural in origin, a misrepresentation for which it was held to account by scientists working for the South Florida Water Management District under the aegis of its Executive Director, Carol Wehle. Please include these comments in the official hearings record on these issues. Operation of the old units should be scaled back until the more restrictive of the fresh water flow, temperature, or salinity on the source side or pollution load limits are met on the receiving waters side based on a USGS-approved, calibrated, and validated combined surface water-groundwater water quantity and quality model. This temporary emergency operating condition should continue until such time as the EIS for the combined operation of the old and new units are revised to reflect these new circumstances and the ability for FPL to provide the required reasonable assurances reconsidered.

Thank you.

Larry E Fink, M.S Owner and Principal Waterwise Consulting, LLC organization: Waterwise Consulting, LLC address1: 1601 S. Ocean Drive address2: Suite 406 city: Hollywood state: FL zip: 33019 country: USA phone: 954-923-7374