ML17262A757: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Issue Date:  08/23/18 1 71130  NRC INSPECTION MANUAL NSIR/DSO INSPECTION PROCEDURE 71130   SECURITY Effective Date: January 1, 2019   PROGRAM APPLICABILITY: IMC 2201 A   71130-01 INSPECTION OBJECTIVE The objective of this inspection procedure (IP) is to gather information to determine whether a licensee is meeting the objective of the security cornerstone, which is to provide assurance that a power reactor security system and material control and accounting program can protect against the design basis threat (DBT) of radiological sabotage consistent with Title 10 of the Code of Federal Regulations (10 and the theft or loss of special nuclear material consistent with 10 CFR Part 74, Material Control and Accounting of Special Nuclear Material." In meeting this objective, this procedure has provisions for verification and assessment of licensee action with respect to Commission initiatives deemed necessary to address adequacy in the protection of public health and safety and maintaining common defense and security at operating power reactor facilities. Commission initiatives include Orders, rulemaking or other action. 71130-02 INSPECTION REQUIREMENTS 02.01 Baseline inspection requirements are identified in and satisfied by the following inspectable area attachments to this IP: a. Access Authorization (IP 71130.01) b. Access Control (IP 71130.02) c. Contingency Response - Force-on-Force Testing (IP 71130.03) d. Equipment Performance, Testing, and Maintenance (IP 71130.04) e. Protective Strategy Evaluation and Performance Evaluation Program (IP 71130.05) f. Protection of Safeguards Information (IP 71130.06) g. Security Training (IP 71130.07) h. Fitness-for-Duty Program (IP 71130.08) i. Information Technology Security (IP 71130.10) ** j. Material Control and Accounting (IP 71130.11) k. Review of Power Reactor Target Sets (IP 71130.14) ** These inspectable area attachments are being developed.
{{#Wiki_filter:NRC INSPECTION MANUAL                                           NSIR/DSO INSPECTION PROCEDURE 71130 SECURITY Effective Date: January 1, 2019 PROGRAM APPLICABILITY: IMC 2201 A 71130-01       INSPECTION OBJECTIVE The objective of this inspection procedure (IP) is to gather information to determine whether a licensee is meeting the objective of the security cornerstone, which is to provide assurance that a power reactor licensees security system and material control and accounting program can protect against the design basis threat (DBT) of radiological sabotage consistent with Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Physical Protection of Plants and Materials, and the theft or loss of special nuclear material consistent with 10 CFR Part 74, Material Control and Accounting of Special Nuclear Material."
Issue Date: 08/23/18 2 71130 02.02 These requirements represent the minimum inspection activity to be conducted at each reactor site at the frequencies shown in each inspectable area attachment. a. The inspection requirements in Section 02 of the listed attachments describe the necessary actions to be completed in order to achieve the inspection objective(s) stated in Section 01 of the listed attachments. Inspection requirements may include, but are not limited to, inspecting systems, components, records, procedures, programs, and operations. b. The sample size identified within each inspectable area has been determined to meet the inspection objective(s) and the general performance objective of the Security Cornerstone. Inspection of the minimum number of inspection requirements within each inspectable area attachment at the periodicity specified within the attachment demonstrates the completion of the respective inspection procedure. c. The inspectable area attachments within the Security Baseline Inspection Program include a risk-informed structure which is depicted within each attachment through the requirements within the specified sample. The inspection requirements are separated into three tier level sections (Tier I, Tier II, and Tier III) with the most risk significant being assigned to the Tier I section of the attachment. This tier level concept ensures inspection oversight relative to the risk significance of the specific elements that   02.03 Identification and Resolution of Problems. The primary means by which licensees maintain an appropriate level of safety and security is through an effective problem identification and resolution program to correct deficiencies involving human performance, equipment, programs, and procedures. The baseline inspection program includes periodic inspections of the licensees corrective action programs to gauge their effectiveness for identifying and correcting problems. 71130-03 INSPECTION GUIDANCE Applicable Performance Indicator: The security cornerstone includes one performance indicator, The Protected Area Security Equipment Performance Index, which monitors the effectiveness of the maintenance process and equipment degradation of components of protected area perimeter detection and assessment. 71130-04 INSPECTION RESOURCES Estimates of inspection resources are identified within each inspectable area attachment. END Issue Date: 08/23/18 Att1-1 71130 Attachment 1- Revision History for 71130 Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Needed and Completion Date Comment Resolution and Closed Feedback Accession Number (Pre-Decisional, Non-Public Information) 04/03/00 CN 00-003 Initial issuance. ML040680555 02/19/04 CN 04-007 Periodic revision. N/A ML071930406212/10/08 CN 08-035  This document has been revised to include updates resulting from inspection feedback and oversight; add new inspectable area (MC&A); correct editorial errors and the conversion to MS Word. N/A ML073550675 N/A ML093421304 01/12/10 CN10-002  This document has been revised to address the changes to 10 CFR Part 73 that resulted from a rulemaking; and in accordance with the ROP realignment process. N/A N/A N/A ML100471188 02/24/10 CN 10-007 Effective date changed to 04/01/10. N/A N/A N/A ML14296A315 04/20/15 CN 15-006 This document has been revised to change the program applicability to ensure the procedures have connectivity to the appropriate base document which specifically identifies the inspectable areas within its content. N/A ML15041A166 Issue Date: 08/23/18 Att1-2 71130 Commitment Tracking Number Accession Number Issue Date Change Notice Description of Change Description of Training Needed and Completion Date Comment Resolution and Closed Feedback Accession Number (Pre-Decisional, Non-Public Information) N/A ML17262A757 08/23/18 CN 18-028 SOSB revised the 71130 series Inspection Procedures (IP) and associated Inspection Manual Chapters (IMC) in response to Staff Requirements SECY 16-0073 (Options and Recommendations for the Force-On-Force Inspection Program) and the March 2017 Assessment Team (Regions and 71130 series IPs for power reactors. Upon completion of a SUNSI review, the staff concluded that this document should be de-controlled. administrative revision of this document was conducted to remove SUNSI markings. N/A ML17262A704}}
In meeting this objective, this procedure has provisions for verification and assessment of licensee action with respect to Commission initiatives deemed necessary to address adequacy in the protection of public health and safety and maintaining common defense and security at operating power reactor facilities. Commission initiatives include Orders, rulemaking or other action.
71130-02       INSPECTION REQUIREMENTS 02.01 Baseline inspection requirements are identified in and satisfied by the following inspectable area attachments to this IP:
: a. Access Authorization (IP 71130.01)
: b. Access Control (IP 71130.02)
: c. Contingency Response - Force-on-Force Testing (IP 71130.03)
: d. Equipment Performance, Testing, and Maintenance (IP 71130.04)
: e. Protective Strategy Evaluation and Performance Evaluation Program (IP 71130.05)
: f. Protection of Safeguards Information (IP 71130.06)
: g. Security Training (IP 71130.07)
: h. Fitness-for-Duty Program (IP 71130.08)
: i. Information Technology Security (IP 71130.10) **
: j. Material Control and Accounting (IP 71130.11)
: k. Review of Power Reactor Target Sets (IP 71130.14)
    ** These inspectable area attachments are being developed.
Issue Date: 08/23/18                               1                                        71130
 
02.02 These requirements represent the minimum inspection activity to be conducted at each reactor site at the frequencies shown in each inspectable area attachment.
: a. The inspection requirements in Section 02 of the listed attachments describe the necessary actions to be completed in order to achieve the inspection objective(s) stated in Section 01 of the listed attachments. Inspection requirements may include, but are not limited to, inspecting systems, components, records, procedures, programs, and operations.
: b. The sample size identified within each inspectable area has been determined to meet the inspection objective(s) and the general performance objective of the Security Cornerstone. Inspection of the minimum number of inspection requirements within each inspectable area attachment at the periodicity specified within the attachment demonstrates the completion of the respective inspection procedure.
: c. The inspectable area attachments within the Security Baseline Inspection Program include a risk-informed structure which is depicted within each attachment through the application of a tier level format to indicate the risk significance of the inspection requirements within the specified sample. The inspection requirements are separated into three tier level sections (Tier I, Tier II, and Tier III) with the most risk significant being assigned to the Tier I section of the attachment. This tier level concept ensures that the licensees physical protection program and protective strategy receive inspection oversight relative to the risk significance of the specific elements that comprise the licensees security programs.
02.03 Identification and Resolution of Problems. The primary means by which licensees maintain an appropriate level of safety and security is through an effective problem identification and resolution program to correct deficiencies involving human performance, equipment, programs, and procedures. The baseline inspection program includes periodic inspections of the licensees corrective action programs to gauge their effectiveness for identifying and correcting problems.
71130-03         INSPECTION GUIDANCE Applicable Performance Indicator: The security cornerstone includes one performance indicator, The Protected Area Security Equipment Performance Index, which monitors the effectiveness of the maintenance process and equipment degradation of components of protected area perimeter detection and assessment.
71130-04         INSPECTION RESOURCES Estimates of inspection resources are identified within each inspectable area attachment.
END Issue Date: 08/23/18                                 2                                              71130
 
Attachment 1- Revision History for 71130 Comment Resolution Accession                                                        Description of Commitment                                                                                         and Closed Feedback Number                                                        Training Needed Tracking                                   Description of Change                                  Accession Number Issue Date                                                       and Completion Number                                                                                           (Pre-Decisional, Non-Change Notice                                                      Date Public Information) 04/03/00       Initial issuance.
CN 00-003 ML040680555    Periodic revision.
02/19/04 CN 04-007 N/A             ML0719304062  This document has been revised to include updates   N/A            ML073550675 12/10/08      resulting from inspection feedback and oversight; CN 08-035      add new inspectable area (MC&A); correct editorial errors and the conversion to MS Word.
N/A             ML093421304   This document has been revised to address the       N/A            N/A 01/12/10      changes to 10 CFR Part 73 that resulted from a CN10-002      rulemaking; and in accordance with the ROP realignment process.
N/A             ML100471188   Effective date changed to 04/01/10.                 N/A             N/A 02/24/10 CN 10-007 N/A             ML14296A315   This document has been revised to change the         N/A            ML15041A166 04/20/15      program applicability to ensure the procedures CN 15-006      have connectivity to the appropriate base document which specifically identifies the inspectable areas within its content.
Issue Date: 08/23/18                                         Att1-1                                                71130
 
Comment Resolution Accession                                                      Description of Commitment                                                                                       and Closed Feedback Number                                                        Training Needed Tracking                                   Description of Change                                  Accession Number Issue Date                                                     and Completion Number                                                                                           (Pre-Decisional, Non-Change Notice                                                    Date Public Information)
N/A             ML17262A757   SOSB revised the 71130 series Inspection           N/A            ML17262A704 08/23/18      Procedures (IP) and associated Inspection Manual CN 18-028      Chapters (IMC) in response to Staff Requirements
                              - SECY 16-0073 (Options and Recommendations for the Force-On-Force Inspection Program) and the March 2017 Assessment Team (Regions and HQ) review for redundancys and efficiencies of the 71130 series IPs for power reactors. Upon completion of a SUNSI review, the staff concluded that this document should be de-controlled.
Consistent with the staffs SUNSI determination, an administrative revision of this document was conducted to remove SUNSI markings.
Issue Date: 08/23/18                                        Att1-2                                                71130}}

Latest revision as of 17:36, 29 October 2019

IP 71130 Security
ML17262A757
Person / Time
Issue date: 08/23/2018
From: Eric Wharton
NRC/NSIR/DSO/SOSB
To:
Wharton E 287-3621
Shared Package
ML17262A696, ML18234A023 List:
References
CN 18-028
Download: ML17262A757 (4)


Text

NRC INSPECTION MANUAL NSIR/DSO INSPECTION PROCEDURE 71130 SECURITY Effective Date: January 1, 2019 PROGRAM APPLICABILITY: IMC 2201 A 71130-01 INSPECTION OBJECTIVE The objective of this inspection procedure (IP) is to gather information to determine whether a licensee is meeting the objective of the security cornerstone, which is to provide assurance that a power reactor licensees security system and material control and accounting program can protect against the design basis threat (DBT) of radiological sabotage consistent with Title 10 of the Code of Federal Regulations (10 CFR) Part 73, Physical Protection of Plants and Materials, and the theft or loss of special nuclear material consistent with 10 CFR Part 74, Material Control and Accounting of Special Nuclear Material."

In meeting this objective, this procedure has provisions for verification and assessment of licensee action with respect to Commission initiatives deemed necessary to address adequacy in the protection of public health and safety and maintaining common defense and security at operating power reactor facilities. Commission initiatives include Orders, rulemaking or other action.

71130-02 INSPECTION REQUIREMENTS 02.01 Baseline inspection requirements are identified in and satisfied by the following inspectable area attachments to this IP:

a. Access Authorization (IP 71130.01)
b. Access Control (IP 71130.02)
c. Contingency Response - Force-on-Force Testing (IP 71130.03)
d. Equipment Performance, Testing, and Maintenance (IP 71130.04)
e. Protective Strategy Evaluation and Performance Evaluation Program (IP 71130.05)
f. Protection of Safeguards Information (IP 71130.06)
g. Security Training (IP 71130.07)
h. Fitness-for-Duty Program (IP 71130.08)
i. Information Technology Security (IP 71130.10) **
j. Material Control and Accounting (IP 71130.11)
k. Review of Power Reactor Target Sets (IP 71130.14)
    • These inspectable area attachments are being developed.

Issue Date: 08/23/18 1 71130

02.02 These requirements represent the minimum inspection activity to be conducted at each reactor site at the frequencies shown in each inspectable area attachment.

a. The inspection requirements in Section 02 of the listed attachments describe the necessary actions to be completed in order to achieve the inspection objective(s) stated in Section 01 of the listed attachments. Inspection requirements may include, but are not limited to, inspecting systems, components, records, procedures, programs, and operations.
b. The sample size identified within each inspectable area has been determined to meet the inspection objective(s) and the general performance objective of the Security Cornerstone. Inspection of the minimum number of inspection requirements within each inspectable area attachment at the periodicity specified within the attachment demonstrates the completion of the respective inspection procedure.
c. The inspectable area attachments within the Security Baseline Inspection Program include a risk-informed structure which is depicted within each attachment through the application of a tier level format to indicate the risk significance of the inspection requirements within the specified sample. The inspection requirements are separated into three tier level sections (Tier I, Tier II, and Tier III) with the most risk significant being assigned to the Tier I section of the attachment. This tier level concept ensures that the licensees physical protection program and protective strategy receive inspection oversight relative to the risk significance of the specific elements that comprise the licensees security programs.

02.03 Identification and Resolution of Problems. The primary means by which licensees maintain an appropriate level of safety and security is through an effective problem identification and resolution program to correct deficiencies involving human performance, equipment, programs, and procedures. The baseline inspection program includes periodic inspections of the licensees corrective action programs to gauge their effectiveness for identifying and correcting problems.

71130-03 INSPECTION GUIDANCE Applicable Performance Indicator: The security cornerstone includes one performance indicator, The Protected Area Security Equipment Performance Index, which monitors the effectiveness of the maintenance process and equipment degradation of components of protected area perimeter detection and assessment.

71130-04 INSPECTION RESOURCES Estimates of inspection resources are identified within each inspectable area attachment.

END Issue Date: 08/23/18 2 71130

Attachment 1- Revision History for 71130 Comment Resolution Accession Description of Commitment and Closed Feedback Number Training Needed Tracking Description of Change Accession Number Issue Date and Completion Number (Pre-Decisional, Non-Change Notice Date Public Information) 04/03/00 Initial issuance.

CN 00-003 ML040680555 Periodic revision.

02/19/04 CN 04-007 N/A ML0719304062 This document has been revised to include updates N/A ML073550675 12/10/08 resulting from inspection feedback and oversight; CN 08-035 add new inspectable area (MC&A); correct editorial errors and the conversion to MS Word.

N/A ML093421304 This document has been revised to address the N/A N/A 01/12/10 changes to 10 CFR Part 73 that resulted from a CN10-002 rulemaking; and in accordance with the ROP realignment process.

N/A ML100471188 Effective date changed to 04/01/10. N/A N/A 02/24/10 CN 10-007 N/A ML14296A315 This document has been revised to change the N/A ML15041A166 04/20/15 program applicability to ensure the procedures CN 15-006 have connectivity to the appropriate base document which specifically identifies the inspectable areas within its content.

Issue Date: 08/23/18 Att1-1 71130

Comment Resolution Accession Description of Commitment and Closed Feedback Number Training Needed Tracking Description of Change Accession Number Issue Date and Completion Number (Pre-Decisional, Non-Change Notice Date Public Information)

N/A ML17262A757 SOSB revised the 71130 series Inspection N/A ML17262A704 08/23/18 Procedures (IP) and associated Inspection Manual CN 18-028 Chapters (IMC) in response to Staff Requirements

- SECY 16-0073 (Options and Recommendations for the Force-On-Force Inspection Program) and the March 2017 Assessment Team (Regions and HQ) review for redundancys and efficiencies of the 71130 series IPs for power reactors. Upon completion of a SUNSI review, the staff concluded that this document should be de-controlled.

Consistent with the staffs SUNSI determination, an administrative revision of this document was conducted to remove SUNSI markings.

Issue Date: 08/23/18 Att1-2 71130