ML17291A831: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P RI (3 RI"EY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9506130264 DOC.DATE: 95/05/31 NOTARIZED:
{{#Wiki_filter:RI (3 RI "EY PACCELERATED      RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.
ACCESSION NBR:9506130264                 DOC.DATE: 95/05/31 NOTARIZED: NO                 DOCKET FACIL:50-397   WPPSS     Nuclear Project, Unit 2, Washington Public               Powe 05000397 AUTH. NAME               AUTHOR AFFILIATION EMBREE,D.G.             Washington Public Power Supply System PARRISH,J.V.           Washington Public Power Supply System RECIP.NAME               RECIPIENT AFFILIATION
Washington Public Power Supply System PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for May 1995 for WNP-).W/950609 ltr DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J COPIES LTTR ENCL 1 1 INTERNAL: 10 10 E CENTE 1 1 1 NRR~O~~OECB 1 1 AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 1 1 1 1 1 1 EXTERNAL LITCO BRYCE i J H NRC PDR 1 1 1 1 NOAC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept               for   May 1995   for WNP-).W/950609 ltr DISTRIBUTION CODE: IE24D               COPIES RECEIVED:LTR             ENCL     SIZE TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE iVASTE!CONTACI'THE DOCUMENT CONTROL DESK, ROOK!Pl-37 (EXT.504-2083)TO ELliiIIVATE YOUR NA!iIE FROil DISTRIBUTION LISTS I'OR DOCl'ME.4'I'S YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 96B~3000 George Washington Way~Richland, Washington 99352 June 9, 1995 G02-95-111 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
NOTES:
RECIPIENT                  COPIES              RECIPIENT         COPIES ID CODE/NAME                LTTR ENCL          ID CODE/NAME       LTTR ENCL PD4-2 PD                         1     1       CLIFFORD,J             1     1 INTERNAL:                                 10     10       AEOD/SPD/RRAB          1    1 E CENTE           1         1     1      NRR/DISP/PIPB          1    1 NRR~O ~~OECB                     1     1       RGN4                   1     1 EXTERNAL   LITCO BRYCE i J H               1     1       NOAC                  1     1 NRC PDR                          1     1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACI'THE DOCUMENT CONTROL DESK, ROOK! Pl-37 (EXT. 504-2083 ) TO ELliiIIVATEYOUR NA!iIE FROil DISTRIBUTION LISTS I'OR DOCl'ME. 4'I'S YOU DON "I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                     20   ENCL     20
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96B ~ 3000 George Washington Way ~ Richland, Washington 99352 June 9, 1995 G02-95-111 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT MAY 1995 Transmitted herewith is the Monthly Operating Report for the month of May 1995 as required by Technical Specification 6.9.1.6..V.Parrish (Mail Drop 1023)Vice President, Nuclear Operations JVP:DGE CC: LJ Callan, NRC RIV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)'st506f30264 95053i PDR ADOCK05000397.R'.',>,-",: PDR  
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MAY 1995 Transmitted herewith is the Monthly Operating Report for the month           of May   1995 as required by Technical Specification 6.9.1.6.
~t Q'>g~)~~~,
  . V. Parrish     (Mail Drop 1023)
OPERATING STATUS REPORT for WNP-2 Date: June 1, 1995 1.2.3.4 5.6.7.8.9.Docket: 50-397 Reporting Period: MAY 1995 Outage+On-Line Hours: 744.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons: 10.11.Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: None 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 0.0 0.0 0.0 0.0 0 0-6,104 0.0%0.0%0.0%0.0%0.0%0.0 YEAR 3,623.0 2,404.3 0.0 2,324.5 0.0 7,404,028 2,553,980 2,445,691 64.2%64.2%62.2%60.3%13.0%348.6 CUMULATIVE 91,711.2 65,104.9 340.4 62,892.1 381.7 186,666,868 62,907,480 60,270,825 68.6%69.0%60.2%59.5%11.7%8,319.7 26.27.If currently shutdown, estimated startup date: Shutdowns scheduled over the next 6 months (type, date, duration):
Vice President, Nuclear Operations JVP:DGE CC:     LJ Callan, NRC RIV NRC Sr. Resident Inspector (927N)
Refueling, April 22, 1995, 42 days.June 4, 1995 Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.
INPO ANI Library Utility Data Institute BPA (399)
t t AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: MAY 1995 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
'st506f30264 95053i PDR
50-397 WNP-2 June 1, 1995 D.G.Embree (509)377-844$DAY 4 AVERAGE DAILY POWER LEVEL (Net MWe)-12-10 9-9 AVERAGE DAILY POWER LEVEL DAY (Net MWe)16 17 18 19 20 21 22 23 10 12 13 14 15-'8-9-7 24 25 26 27 28 29 30 31-7-10-10-10-12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
.R       '. ',
CR I UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: MAY 1995 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: June 1, 1995 COMPLETED BY: D.G.Embree TELEPHONE:
ADOCK 05000397
(509)377-8448 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9545 4/22/95 S 744.0 C N/A RC FUELXX Continuation from previous month.
                  >,-",: PDR
 
            ~ t Q'> g~)~~ ~,
 
OPERATING STATUS REPORT for WNP-2 Date: June 1, 1995
: 1. Docket: 50-397
: 2. Reporting Period: MAY 1995                                 Outage   + On-Line Hours: 744.0
: 3. Utility Contact:       David G. Embree (509) 377-8448 4    Licensed Thermal Power (MW, ):
: 5. Nameplate Rating (Gross MW, ):
: 6. Design Electrical Rating (Net MW,):
: 7. Maximum Dependable Capacity (Gross MW,):
: 8. Maximum Dependable Capacity (Net MW, ):
: 9. If changes occur above since last report, give reasons:
: 10. Power to which restricted, if any (Net MW,):                                               None
: 11. Reasons for restrictions, if any:
MONTH                YEAR              CUMULATIVE
: 12. Report Period Hours                              744.0              3,623.0              91,711.2
: 13. Hours Reactor Critical                              0.0            2,404.3              65,104.9
: 14. Rx Reserve Shutdown Hours                            0.0                  0.0                340.4
: 15. Hours Generator On-Line                             0.0            2,324.5              62,892.1
: 16. Unit Reserve Shutdown Hours                         0.0                  0.0                381.7
: 17. Gross Thermal Energy (MWH)                             0          7,404,028            186,666,868
: 18. Gross Electrical Energy (MWH)                         0          2,553,980            62,907,480
: 19. Net Electrical Energy (MWH)                     -6,104          2,445,691            60,270,825
: 20. Unit Service Factor                               0.0%                64.2%                  68.6%
: 21. Unit Availability Factor                          0.0%               64.2%                 69.0%
: 22. Unit Capacity Factor (MDC Net)                    0.0%               62.2%                  60.2%
: 23. Unit Capacity Factor (DER Net)                    0.0%                60.3%                 59.5%
: 24. Unit Forced Outage Rate                          0.0%               13.0%                 11.7%
: 25. Forced Outage Hours                                  0.0              348.6                8,319.7
: 26. Shutdowns scheduled over the next 6 months (type, date, duration):                     Refueling, April 22, 1995, 42 days.
: 27. Ifcurrently shutdown, estimated startup date:                                      June 4, 1995 Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.
 
t AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.:       50-397 UNIT:    WNP-2 DATE:    June 1, 1995 COMPLETED BY:        D. G. Embree TELEPHONE:        (509) 377-844$
REPORT PERIOD:            MAY 1995 AVERAGE DAILYPOWER LEVEL                                      AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                 DAY                 (Net MWe)
                              -12                                  16
                              -10                                  17 18 4                                                                19 9                                  20
                                -9                                  21 22 23 24                        -7 10                                                               25                      -10
                                -'8                                 26                      -10 12                          -9                                   27                      -10 13                          -7                                   28 14                                                              29 15                                                              30 31                     -12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
CR I
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:       50-397 UNIT NAME:       WNP-2 DATE:   June 1, 1995 COMPLETED BY:         D.G. Embree TELEPHONE:       (509) 377-8448 REPORT PERIOD:      MAY 1995 No.       Date   Type     Hours     Reason     Method   LER Number       System Component     Cause and Corrective Action To Prevent Recurrence 9545       4/22/95   S       744.0       C                     N/A             RC   FUELXX       Continuation from previous month.


==SUMMARY==
==SUMMARY==
: At the beginning of the month, the plant continued the annual refueling outage with an estimated startup date of June 4, 1995.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG-0161 Exhibits F&H 0 4>>'I}}
:             At the beginning of the month, the plant continued the annual refueling outage with an estimated startup date of June 4, 1995.
TYPE                     REASON                                                          METHOD                    SYSTEM & COMPONENT F - Forced               A - Equipment Failure             E - Operator Training &       1 - Manual                NUREG-0161 Exhibits F & H S - Scheduled            B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction        G - Operational Error          4 - Continued H - Other                      5 - Reduced Load 9 - Other
 
0 4>>
    'I}}

Revision as of 12:25, 29 October 2019

Monthly Operating Rept for May 1995 for WNP-2.W/950609 Ltr
ML17291A831
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-111, NUDOCS 9506130264
Download: ML17291A831 (8)


Text

RI (3 RI "EY PACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9506130264 DOC.DATE: 95/05/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1995 for WNP-).W/950609 ltr DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: 10 10 AEOD/SPD/RRAB 1 1 E CENTE 1 1 1 NRR/DISP/PIPB 1 1 NRR~O ~~OECB 1 1 RGN4 1 1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACI'THE DOCUMENT CONTROL DESK, ROOK! Pl-37 (EXT. 504-2083 ) TO ELliiIIVATEYOUR NA!iIE FROil DISTRIBUTION LISTS I'OR DOCl'ME. 4'I'S YOU DON "I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 96B ~ 3000 George Washington Way ~ Richland, Washington 99352 June 9, 1995 G02-95-111 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MAY 1995 Transmitted herewith is the Monthly Operating Report for the month of May 1995 as required by Technical Specification 6.9.1.6.

. V. Parrish (Mail Drop 1023)

Vice President, Nuclear Operations JVP:DGE CC: LJ Callan, NRC RIV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399)

'st506f30264 95053i PDR

.R '. ',

ADOCK 05000397

>,-",: PDR

~ t Q'> g~)~~ ~,

OPERATING STATUS REPORT for WNP-2 Date: June 1, 1995

1. Docket: 50-397
2. Reporting Period: MAY 1995 Outage + On-Line Hours: 744.0
3. Utility Contact: David G. Embree (509) 377-8448 4 Licensed Thermal Power (MW, ):
5. Nameplate Rating (Gross MW, ):
6. Design Electrical Rating (Net MW,):
7. Maximum Dependable Capacity (Gross MW,):
8. Maximum Dependable Capacity (Net MW, ):
9. If changes occur above since last report, give reasons:
10. Power to which restricted, if any (Net MW,): None
11. Reasons for restrictions, if any:

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 3,623.0 91,711.2
13. Hours Reactor Critical 0.0 2,404.3 65,104.9
14. Rx Reserve Shutdown Hours 0.0 0.0 340.4
15. Hours Generator On-Line 0.0 2,324.5 62,892.1
16. Unit Reserve Shutdown Hours 0.0 0.0 381.7
17. Gross Thermal Energy (MWH) 0 7,404,028 186,666,868
18. Gross Electrical Energy (MWH) 0 2,553,980 62,907,480
19. Net Electrical Energy (MWH) -6,104 2,445,691 60,270,825
20. Unit Service Factor 0.0% 64.2% 68.6%
21. Unit Availability Factor 0.0% 64.2% 69.0%
22. Unit Capacity Factor (MDC Net) 0.0% 62.2% 60.2%
23. Unit Capacity Factor (DER Net) 0.0% 60.3% 59.5%
24. Unit Forced Outage Rate 0.0% 13.0% 11.7%
25. Forced Outage Hours 0.0 348.6 8,319.7
26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, April 22, 1995, 42 days.
27. Ifcurrently shutdown, estimated startup date: June 4, 1995 Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

t AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO.: 50-397 UNIT: WNP-2 DATE: June 1, 1995 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-844$

REPORT PERIOD: MAY 1995 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe)

-12 16

-10 17 18 4 19 9 20

-9 21 22 23 24 -7 10 25 -10

-'8 26 -10 12 -9 27 -10 13 -7 28 14 29 15 30 31 -12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

CR I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: June 1, 1995 COMPLETED BY: D.G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: MAY 1995 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9545 4/22/95 S 744.0 C N/A RC FUELXX Continuation from previous month.

SUMMARY

At the beginning of the month, the plant continued the annual refueling outage with an estimated startup date of June 4, 1995.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG-0161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

0 4>>

'I