ML17318A530: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ACCESSION NBR ~ 800 1 03062 FACELl50 315" AOYH g NAME SFIAt:CEKgt) ~ V.
REGUlATORY Donald'.,
                          '
1
                                                                'RMATION DISTRIBUTION DOC ~ DATE! 79/1 2/28 Cook Nuclear Powei Planti Onit
                                            'UTHOR At'F1LYAl'ION Indiana 6 Itl'ichigan Power Co.
                                                                                        'OCKET        SYS NOTARIZED ~
li I    (RIDS)
NO Indiana            L    05ootIps Rft'IF, NAME                            "RECIPIENT'F'F ILIATLON curl JKGT:  ~791212            'ue                metero        logical monitor 1ng lnet r umentat lan out of      svc                        to insta) l at              i on of new equipment Ins tel I at i on g
delayed by adverse weather conditions',Instrumentation operable after installation Il calibr completed, DISTRIBUTION
                            ':
              '"""TCODE! A002S                                COPIES RECEIVED ~ O'TR nc ent" epor ts
                                                                                    "'"'WWW
                                                                                                  / ENCL>> Q SIZE!~
r"=                                                                              Mem w Meme ~
RKC IP        IKNT'D COPIES                    RECIPIENT              COPIES eIIOEiNAMK;                              t:h'fH      EN    L      ID COOL/NAMK'-'-      LTYA"EACL.
                              ~gg ~                            r            &
                                                                ~    m      ~
ACTION:      05 Be,                                                4 INTERNAL:    0    REG          FILE;                              1                  02 NRC PDR                    1          1 0                                                                        11  HPA A    YA/EDO                                                              iS NOPAK/KNIEI i6    EFB,                                                                i7  'A'D"FOR ENGH              i i8    PlANT SYS BR                                    1                  19 LLC SYS BA 20 AU"iPI AA'f SYS                                                        22 HEAC SAFt BR                1 28 EAGA BH                                            i                  24 RAECEA                      i 25 fItIR SYS BR                                        i                  26 AOi8TTE,-ANAL              i 2'I OPERA LI6 BR                                                          28 ACDENT AAL78                1 29 A'OR                                                i                  E  JORDAN/IF;""'
SY8"BR'ANAUKRaSg i                    IHKl:AND" STS GRUUI                          LEADR              i                  TM'I 8 "SYREKT EXTERNAL; 03 LPDR                                                                      04 NSIC 29 ACR8 TOTAL NUMBER OF COPIES RKQUIREDe lTTR                                                ~      ENCL rrT+r .5 Iil<<'t'lttr)t)Irrrt.r'Irr(rP )]'ru49rit>l' tr'I '" ~                                ,'<e'tlrr>rr'IHr"I
 
4  4 V 4    II Y 4 1
 
Op
/~leotvla INDIANA& MICHIGANPOWER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 December 28, 1979 Operating License DPR-58 Docket 8 50-315 Mr. J. G. Keppler, Regional Director Office Of Inspection and Enforcement U. S. Nucleat Regulatory Commission Region  III 799 Roosevelt Road Glen    Ellyn,  Illinois        60137
 
==Dear Hr. Keppler:==
 
This report is submitted as required by Technical Specification 3.3.3.4, as the required Meteorological Monitoring Instrumentation was inoperable from December 12, 1979 until December 24, 1979.
The Meteorological        Monitoring Instrumentation was taken out-of-service on Decemb'er 12, for the          installation of new meteorological equipment, of a modified design, to improve Meteorological System operability during the win-ter months. The completion of the new equipment installation was delayed by several days of adverse weather conditions, preventing any work on the weather tower.
After completing the installation and calibration of the new equipment, the Meteorological Monitoring Instrumentation was determined to be operable on December 24, 1979. No gaseous releases were made during this time period.
Very  truly yours, D. V. Shaller Plant Manager
  /ms cc: J.                                          G. Olson                                        0 R.
E. Dol an S. Hunter                              J. H. Hennigan qDg R. H. Jurgensen                          PNSRC R. F. Kroeger                            J. F. Stietzel R.      Kilburn                            E. L. Townley R. E. Masse      RO:III                  Dir.,  IE (20 copies)
R. C. Callen      HPSC                  Dir.,  MIPC  (2 copies)
C.      Charnoff', Esq.
s'eo(aroint                    ~~79 OEG ~ <
                                                              &0 trr O'TQ+Rl!5}}

Revision as of 06:57, 29 October 2019

Ro:On 791212,meteorological Monitoring Instrumentation Out of Svc Due to Installation of New Equipment.Installation Delayed by Adverse Weather Conditions.Instrumentation Operable After Installation & Calibr Completed
ML17318A530
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/28/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To:
References
NUDOCS 8001030621
Download: ML17318A530 (3)


Text

ACCESSION NBR ~ 800 1 03062 FACELl50 315" AOYH g NAME SFIAt:CEKgt) ~ V.

REGUlATORY Donald'.,

'

1

'RMATION DISTRIBUTION DOC ~ DATE! 79/1 2/28 Cook Nuclear Powei Planti Onit

'UTHOR At'F1LYAl'ION Indiana 6 Itl'ichigan Power Co.

'OCKET SYS NOTARIZED ~

li I (RIDS)

NO Indiana L 05ootIps Rft'IF, NAME "RECIPIENT'F'F ILIATLON curl JKGT: ~791212 'ue metero logical monitor 1ng lnet r umentat lan out of svc to insta) l at i on of new equipment Ins tel I at i on g

delayed by adverse weather conditions',Instrumentation operable after installation Il calibr completed, DISTRIBUTION

':

'"""TCODE! A002S COPIES RECEIVED ~ O'TR nc ent" epor ts

"'"'WWW

/ ENCL>> Q SIZE!~

r"= Mem w Meme ~

RKC IP IKNT'D COPIES RECIPIENT COPIES eIIOEiNAMK; t:h'fH EN L ID COOL/NAMK'-'- LTYA"EACL.

~gg ~ r &

~ m ~

ACTION: 05 Be, 4 INTERNAL: 0 REG FILE; 1 02 NRC PDR 1 1 0 11 HPA A YA/EDO iS NOPAK/KNIEI i6 EFB, i7 'A'D"FOR ENGH i i8 PlANT SYS BR 1 19 LLC SYS BA 20 AU"iPI AA'f SYS 22 HEAC SAFt BR 1 28 EAGA BH i 24 RAECEA i 25 fItIR SYS BR i 26 AOi8TTE,-ANAL i 2'I OPERA LI6 BR 28 ACDENT AAL78 1 29 A'OR i E JORDAN/IF;""'

SY8"BR'ANAUKRaSg i IHKl:AND" STS GRUUI LEADR i TM'I 8 "SYREKT EXTERNAL; 03 LPDR 04 NSIC 29 ACR8 TOTAL NUMBER OF COPIES RKQUIREDe lTTR ~ ENCL rrT+r .5 Iil<<'t'lttr)t)Irrrt.r'Irr(rP )]'ru49rit>l' tr'I '" ~ ,'<e'tlrr>rr'IHr"I

4 4 V 4 II Y 4 1

Op

/~leotvla INDIANA& MICHIGANPOWER COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 (616) 465-5901 December 28, 1979 Operating License DPR-58 Docket 8 50-315 Mr. J. G. Keppler, Regional Director Office Of Inspection and Enforcement U. S. Nucleat Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Hr. Keppler:

This report is submitted as required by Technical Specification 3.3.3.4, as the required Meteorological Monitoring Instrumentation was inoperable from December 12, 1979 until December 24, 1979.

The Meteorological Monitoring Instrumentation was taken out-of-service on Decemb'er 12, for the installation of new meteorological equipment, of a modified design, to improve Meteorological System operability during the win-ter months. The completion of the new equipment installation was delayed by several days of adverse weather conditions, preventing any work on the weather tower.

After completing the installation and calibration of the new equipment, the Meteorological Monitoring Instrumentation was determined to be operable on December 24, 1979. No gaseous releases were made during this time period.

Very truly yours, D. V. Shaller Plant Manager

/ms cc: J. G. Olson 0 R.

E. Dol an S. Hunter J. H. Hennigan qDg R. H. Jurgensen PNSRC R. F. Kroeger J. F. Stietzel R. Kilburn E. L. Townley R. E. Masse RO:III Dir., IE (20 copies)

R. C. Callen HPSC Dir., MIPC (2 copies)

C. Charnoff', Esq.

s'eo(aroint ~~79 OEG ~ <

&0 trr O'TQ+Rl!5