ML17338B050: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:LICENSEES:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 5, 2017 LICENSEES:         Entergy Nuclear Operations, Inc.
FACILITIES:  
FACILITIES:         Palisades Nuclear Plant


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 5, 2017 Entergy Nuclear Operations, Inc. Palisades Nuclear Plant


==SUMMARY==
==SUMMARY==
OF NOVEMBER 28, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING A POTENTIAL REQUEST ASSOCIATED WITH AN ALTERNATIVE TO THE REEXAMINATION FREQUENCY FOR A RELEVANT CONDITION (EPID L-2017-LRM-0053)
OF NOVEMBER 28, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING A POTENTIAL REQUEST ASSOCIATED WITH AN ALTERNATIVE TO THE REEXAMINATION FREQUENCY FOR A RELEVANT CONDITION (EPID L-2017-LRM-0053)
On November 28, 2017, a Category 1 public teleconference meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO or licensee).
On November 28, 2017, a Category 1 public teleconference meeting was held between the U.S.
The purpose of the meeting was to discuss a potential request associated with an alternative to the reexamination frequency for a relevant condition at Palisades Nuclear Plant (PNP). Specifically, the relevant condition refers to a lodged primary coolant pump impeller piece in the reactor vessel. The licensee provided background information on the lodged primary coolant pump impeller piece. Details of the lodged piece, the licensee's evaluation, and the NRC staff's evaluation can be found in the NRG inspection report dated May 7, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14127A543). The licensee provided the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section XI, requirements for successive examinations of the lodged impeller piece. The ASME Code, Section XI, lWB-2420, states, in part, "the areas containing flaws [or relevant conditions]
Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO or licensee). The purpose of the meeting was to discuss a potential request associated with an alternative to the reexamination frequency for a relevant condition at Palisades Nuclear Plant (PNP). Specifically, the relevant condition refers to a lodged primary coolant pump impeller piece in the reactor vessel.
shall be reexamined during the next three inspection periods listed in the schedule of the Inspection Program of IWB-2400." The licensee stated that a full core offload and core support barrel removal would have to be completed in order to pertorm these successive examinations; therefore, the licensee considers the examinations a hardship.
The licensee provided background information on the lodged primary coolant pump impeller piece. Details of the lodged piece, the licensee's evaluation, and the NRC staff's evaluation can be found in the NRG inspection report dated May 7, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14127A543). The licensee provided the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),
As such, the licensee intends to submit a request for an alternative to the ASME Code, pursuant to Title 1 O of the Code of Federal Regulations Section 50.55a(z)(2), which allows the licensee to submit an alternative to the ASME Code for NRG review and approval if they can show that compliance with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee stated that their proposed alternative would be to pertorm 1 reexamination during the 2nd or 3rd period of the 5th inservice inspection (ISi) interval.
Section XI, requirements for successive examinations of the lodged impeller piece. The ASME Code, Section XI, lWB-2420, states, in part, "the areas containing flaws [or relevant conditions]
The licensee stated the 5th ISi interval started on December 13, 2015, and ends on December 12, 2025. The licensee stated that the basis for the proposed alternative would be similar to their analysis of the lodged piece, which is summarized in the May 7, 2014, NRC inspection report. The NRG staff asked some clarifying questions regarding the level of detail to be provided in the request. The licensee stated they intend to submit the request within 2 weeks of the public teleconference and request the NRG review to be completed by May 31, 2018. The accelerated schedule is to facilitate planning of their fall 2018 outage.
shall be reexamined during the next three inspection periods listed in the schedule of the Inspection Program of IWB-2400." The licensee stated that a full core offload and core support barrel removal would have to be completed in order to pertorm these successive examinations; therefore, the licensee considers the examinations a hardship. As such, the licensee intends to submit a request for an alternative to the ASME Code, pursuant to Title 1O of the Code of Federal Regulations Section 50.55a(z)(2), which allows the licensee to submit an alternative to the ASME Code for NRG review and approval if they can show that compliance with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee stated that their proposed alternative would be to pertorm 1 reexamination during the 2nd or 3rd period of the 5th inservice inspection (ISi) interval. The licensee stated the 5th ISi interval started on December 13, 2015, and ends on December 12, 2025. The licensee stated that the basis for the proposed alternative would be similar to their analysis of the lodged piece, which is summarized in the May 7, 2014, NRC inspection report. The NRG staff asked some clarifying questions regarding the level of detail to be provided in the request.
* 2
The licensee stated they intend to submit the request within 2 weeks of the public teleconference and request the NRG review to be completed by May 31, 2018. The accelerated schedule is to facilitate planning of their fall 2018 outage.
* The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned.
 
Members of the public were present and provided comments to the NRC staff. The staff indicated that members of the public who had questions that were outside the scope of the meeting could contact the regional public affairs officers.
                                                *2*
No regulatory decisions or commitments were made during the meeting. No public meeting feedback forms were received.
The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned. Members of the public were present and provided comments to the NRC staff. The staff indicated that members of the public who had questions that were outside the scope of the meeting could contact the regional public affairs officers.
There were no meeting materials provided by the licensee.
No regulatory decisions or commitments were made during the meeting. No public meeting feedback forms were received. There were no meeting materials provided by the licensee.
A list of meeting attendees is enclosed.
A list of meeting attendees is enclosed.
Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.
Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.
Docket No. 50-255  
                                              \{}A.~_.-"
ud-i';ivine K. Rankin, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255


==Enclosure:==
==Enclosure:==


List of Attendees cc w/enc1: Listserv \{}A.~_.-" ud-i';ivine K. Rankin, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATIENDEES NOVEMBER 28 2017 PUBLIC TELECONFERENCE MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. PALISADES NUCLEAR PLANT NAME ORGANIZATION Jennie Rankin NRC/NRR/DORL Christopher Sydnor NRC/NRR/DMLR Steve Ruffin NRC/NRR/DMLR Prema Chandrathil NRG/Region 111 Harral Logaras NRG/Region Ill Viktoria Mitlyng NRG/Region Ill April Nguyen NRG/Region Ill Jim Miksa Entergy/Palisades Gary Katt Entergy/Palisades Jeff Erickson Entergy/Palisades Jeff Hardy Entergy/Palisades Joe Jerz Entergy/Palisades Brian Sova Entergy/Palisades Jan Boudart Nuclear Energy Information Service Rebecca Mandrell Sierra Club Bette Pierman MSEF-SH Michael Keegan Don't Waste Michigan Kevin Kamps Beyond Nuclear Enclosure 
List of Attendees cc w/enc1: Listserv


==SUBJECT:==
LIST OF ATIENDEES NOVEMBER 28 2017 PUBLIC TELECONFERENCE MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.
PALISADES NUCLEAR PLANT NAME                              ORGANIZATION Jennie Rankin                  NRC/NRR/DORL Christopher Sydnor              NRC/NRR/DMLR Steve Ruffin                    NRC/NRR/DMLR Prema Chandrathil              NRG/Region 111 Harral Logaras                  NRG/Region Ill Viktoria Mitlyng                NRG/Region Ill April Nguyen                    NRG/Region Ill Jim Miksa                      Entergy/Palisades Gary Katt                      Entergy/Palisades Jeff Erickson                  Entergy/Palisades Jeff Hardy                      Entergy/Palisades Joe Jerz                        Entergy/Palisades Brian Sova                    Entergy/Palisades Jan Boudart                    Nuclear Energy Information Service Rebecca Mandrell              Sierra Club Bette Pierman                  MSEF-SH Michael Keegan                Don't Waste Michigan Kevin Kamps                    Beyond Nuclear
~
Enclosure


==SUMMARY==
Meeting Notice ML17311A783 Summa1 ML173388050 OFFICE NRR/DORL/LPL3/PM N RR/DORL/LPL3/LA NRR/DORL/LPL3         NRR/DORL/LPL3/PM NAME JRankin                SRohrer           DWrona           JRankin DATE    12105117          12105117           12/05117         12105117}}
OF NOVEMBER 28, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING A POTENTIAL REQUEST ASSOCIATED WITH AN ALTERNATIVE TO THE REEXAMINATION FREQUENCY FOR A RELEVANT CONDITION (EPID L-2017-LRM-0053)
DATED DECEMBER 5, 2017 DISTRIBUTION:
PUBLIC PM Reading File RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorllpl3 Resource RidsNrrDraAplb Resource RidsNrrLASRohrer Resource RidsNrrPMPalisades Resource ADAMS Accession Nos.: Meeting Notice ML17311A783 Summa1 ML173388050 OFFICE NRR/DORL/LPL3/PM NAME JRankin DATE 12105117 RidsRgn3MailCenter Resource TWertz, NRR Tlnverso, EDO SRuffin, NRR CSydnor, NRR N RR/DORL/LPL3/LA NRR/DORL/LPL3 NRR/DORL/LPL3/PM SRohrer DWrona JRankin 12105117 12/05117 12105117 OFFICIAL RECORD COPY}}

Revision as of 10:37, 22 October 2019

Summary of November 28, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding a Potential Request Associated with an Alternative to the Reexamination Frequency for a Relevant Condition
ML17338B050
Person / Time
Site: Palisades 
Issue date: 12/05/2017
From: Jennivine Rankin
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Rankin J, NRR/DORL/LPL3, 415-1530
References
EPID L-2017-LRM-0053
Download: ML17338B050 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 5, 2017 LICENSEES: Entergy Nuclear Operations, Inc.

FACILITIES: Palisades Nuclear Plant

SUBJECT:

SUMMARY

OF NOVEMBER 28, 2017, PUBLIC MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC. REGARDING A POTENTIAL REQUEST ASSOCIATED WITH AN ALTERNATIVE TO THE REEXAMINATION FREQUENCY FOR A RELEVANT CONDITION (EPID L-2017-LRM-0053)

On November 28, 2017, a Category 1 public teleconference meeting was held between the U.S.

Nuclear Regulatory Commission (NRC) staff and representatives of Entergy Nuclear Operations, Inc. (ENO or licensee). The purpose of the meeting was to discuss a potential request associated with an alternative to the reexamination frequency for a relevant condition at Palisades Nuclear Plant (PNP). Specifically, the relevant condition refers to a lodged primary coolant pump impeller piece in the reactor vessel.

The licensee provided background information on the lodged primary coolant pump impeller piece. Details of the lodged piece, the licensee's evaluation, and the NRC staff's evaluation can be found in the NRG inspection report dated May 7, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14127A543). The licensee provided the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),

Section XI, requirements for successive examinations of the lodged impeller piece. The ASME Code,Section XI, lWB-2420, states, in part, "the areas containing flaws [or relevant conditions]

shall be reexamined during the next three inspection periods listed in the schedule of the Inspection Program of IWB-2400." The licensee stated that a full core offload and core support barrel removal would have to be completed in order to pertorm these successive examinations; therefore, the licensee considers the examinations a hardship. As such, the licensee intends to submit a request for an alternative to the ASME Code, pursuant to Title 1O of the Code of Federal Regulations Section 50.55a(z)(2), which allows the licensee to submit an alternative to the ASME Code for NRG review and approval if they can show that compliance with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee stated that their proposed alternative would be to pertorm 1 reexamination during the 2nd or 3rd period of the 5th inservice inspection (ISi) interval. The licensee stated the 5th ISi interval started on December 13, 2015, and ends on December 12, 2025. The licensee stated that the basis for the proposed alternative would be similar to their analysis of the lodged piece, which is summarized in the May 7, 2014, NRC inspection report. The NRG staff asked some clarifying questions regarding the level of detail to be provided in the request.

The licensee stated they intend to submit the request within 2 weeks of the public teleconference and request the NRG review to be completed by May 31, 2018. The accelerated schedule is to facilitate planning of their fall 2018 outage.

  • 2*

The public was invited to listen to the meeting and was given an opportunity to communicate with the NRC after the business portion, but before the meeting was adjourned. Members of the public were present and provided comments to the NRC staff. The staff indicated that members of the public who had questions that were outside the scope of the meeting could contact the regional public affairs officers.

No regulatory decisions or commitments were made during the meeting. No public meeting feedback forms were received. There were no meeting materials provided by the licensee.

A list of meeting attendees is enclosed.

Please direct any inquiries to me at 301-415-1530, or Jennivine.Rankin@nrc.gov.

\{}A.~_.-"

ud-i';ivine K. Rankin, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosure:

List of Attendees cc w/enc1: Listserv

LIST OF ATIENDEES NOVEMBER 28 2017 PUBLIC TELECONFERENCE MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.

PALISADES NUCLEAR PLANT NAME ORGANIZATION Jennie Rankin NRC/NRR/DORL Christopher Sydnor NRC/NRR/DMLR Steve Ruffin NRC/NRR/DMLR Prema Chandrathil NRG/Region 111 Harral Logaras NRG/Region Ill Viktoria Mitlyng NRG/Region Ill April Nguyen NRG/Region Ill Jim Miksa Entergy/Palisades Gary Katt Entergy/Palisades Jeff Erickson Entergy/Palisades Jeff Hardy Entergy/Palisades Joe Jerz Entergy/Palisades Brian Sova Entergy/Palisades Jan Boudart Nuclear Energy Information Service Rebecca Mandrell Sierra Club Bette Pierman MSEF-SH Michael Keegan Don't Waste Michigan Kevin Kamps Beyond Nuclear

~

Enclosure

Meeting Notice ML17311A783 Summa1 ML173388050 OFFICE NRR/DORL/LPL3/PM N RR/DORL/LPL3/LA NRR/DORL/LPL3 NRR/DORL/LPL3/PM NAME JRankin SRohrer DWrona JRankin DATE 12105117 12105117 12/05117 12105117