ML18003B323: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:REQUL TORY INFORNATION DISTRIBUT1 N SYSTEN{RIDS)C ACCESSIQN NBR: 8606160027 DOC.DATE: 86/06/16 NOTARIZED:
{{#Wiki_filter:C REQUL TORY INFORNATION DISTRIBUT1 N SYSTEN               {RIDS)
NO DOC}(ET FACIL: 50-400 Shearon Hav ris Nuclear Pover Planti Unit 1.Cav olina 05000400 Au TH.NANE AUTHOR AFFILIATION HORUITSp A.Affiliation Not Assigned RECIP.NANE RECIPIENT AFF ILIATl'GN DENTQNp H.Office of Nucleav Reactor Regulation~
ACCESSIQN NBR: 8606160027           DOC. DATE: 86/06/16       NOTARIZED: NO           DOC}(ET FACIL: 50-400 Shearon     Hav ris Nuclear Pover       Planti Unit   1. Cav olina   05000400 Au TH. NANE         AUTHOR   AFFILIATION HORUITSp A.         Affiliation Not Assigned RECIP. NANE         RECIPIENT AFF ILIATl'GN DENTQNp H.           Office of Nucleav Reactor Regulation~             Div ector (post 851125
Div ector (post 851125  


==SUBJECT:==
==SUBJECT:==
Opposes util exemption+rom v equiv'ements of full participation emev gencg plan test within 1 gr of QL issuance.DISTRIBUTION CODE: YEO3D COPIEE RECEIVED: LTR g ENCLSIZE: TITLE: Request fov NRR Action<e.g.2.206 Petitions)
Opposes   util exemption +rom v equiv'ements of full participation     emev gencg plan test within 1 gr of           QL issuance.
Zc Related Correspondenc NOTES: Application fov pev mi t v enewal f i led.05000400 RECIPIENT ID CODE/NAI'tE PNR A PD2 LA BUCI(LEY B 01 INTERNAL: EDO/ACB 04 COPIES LTTR ENCL RECIPIENT ID CODE/NAltE PWR-A PD2 PD ELD/HD$1 NRR DIR COPIES LTTR ENCL EXTERNAL: 24X NRC PDR LPDR NSI C 03 05 TOTAL NUNBER'QF COPIES REGUlRED: LTTR 12 ENCL 1 0 I t l f qK C I g p J I J, Mr.Harold Denton Director, Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 (301)492-7000  
DISTRIBUTION CODE: YEO3D TITLE: Request   fov NRR COPIEE RECEIVED: LTR Action g  ENCL
                                        <e. g. 2. 206 Petitions) Zc SIZE:
Related Correspondenc NOTES: Application fov   pev mi t v enewal   f i led.                               05000400 RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAI'tE       LTTR ENCL          ID CODE/NAltE        LTTR ENCL PNR A PD2 LA                           PWR-A PD2 PD BUCI(LEY B     01 INTERNAL: EDO/ACB                                   ELD/HD$1 NRR DIR 04 EXTERNAL: 24X                                       LPDR            03 NRC PDR                                 NSI C           05 TOTAL NUNBER 'QF COPIES REGUlRED: LTTR             12   ENCL   1
 
0 I
f q t       l K
C I g p J
I             J,
 
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000


==Subject:==
==Subject:==
Shearon Harris nuclear plant, Carolina Power&Light, Emergency Plan  
Shearon Harris nuclear plant, Carolina Power & Light, Emergency Plan
 
==Dear Mr. Denton,==
 
Carolina Power      6  Light  Company  has  not conducted a full participation test of the present            emergency  plan for the Shearon      Harris nuclear plant        as  required by federal, regulation, 10 CFR Part 50.
This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.        Thus, no plan which could actually be implemented    if  the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
Clearly, any such action would further complicate this matter.
At,  least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any      full power  license should    be considered or approved.
Sincerely, Q/8rz) ebObf.b
~'b  Ob 1 b00>  Og000pDR pDOGV pQR H
                                                                  ]p5


==Dear Mr.Denton,==
0     r
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal, regulation, 10 CFR Part 50.This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.Thus, no plan which could actually be implemented if the plant were to operate has been tested.In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.Clearly, any such action would further complicate this matter.At, least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.Sincerely, Q/8rz)ebObf.b~'b pDOGV pDR Ob 1 b00>Og000 pQR H]p5 0 r'C t}}
    'C t}}

Revision as of 06:19, 22 October 2019

Opposes Util Exemption from Requirements of Full Participation Emergency Plan Test within 1 Yr of OL Issuance
ML18003B323
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/16/1986
From: Horwitz A
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606160027
Download: ML18003B323 (4)


Text

C REQUL TORY INFORNATION DISTRIBUT1 N SYSTEN {RIDS)

ACCESSIQN NBR: 8606160027 DOC. DATE: 86/06/16 NOTARIZED: NO DOC}(ET FACIL: 50-400 Shearon Hav ris Nuclear Pover Planti Unit 1. Cav olina 05000400 Au TH. NANE AUTHOR AFFILIATION HORUITSp A. Affiliation Not Assigned RECIP. NANE RECIPIENT AFF ILIATl'GN DENTQNp H. Office of Nucleav Reactor Regulation~ Div ector (post 851125

SUBJECT:

Opposes util exemption +rom v equiv'ements of full participation emev gencg plan test within 1 gr of QL issuance.

DISTRIBUTION CODE: YEO3D TITLE: Request fov NRR COPIEE RECEIVED: LTR Action g ENCL

<e. g. 2. 206 Petitions) Zc SIZE:

Related Correspondenc NOTES: Application fov pev mi t v enewal f i led. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAI'tE LTTR ENCL ID CODE/NAltE LTTR ENCL PNR A PD2 LA PWR-A PD2 PD BUCI(LEY B 01 INTERNAL: EDO/ACB ELD/HD$1 NRR DIR 04 EXTERNAL: 24X LPDR 03 NRC PDR NSI C 05 TOTAL NUNBER 'QF COPIES REGUlRED: LTTR 12 ENCL 1

0 I

f q t l K

C I g p J

I J,

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power & Light, Emergency Plan

Dear Mr. Denton,

Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal, regulation, 10 CFR Part 50.

This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan. Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At, least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely, Q/8rz) ebObf.b

~'b Ob 1 b00> Og000pDR pDOGV pQR H

]p5

0 r

'C t