{{#Wiki_filter:( Dominion Energy Nuclear Connecticut, Inc. 5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com U.S. Nuclear Regulatory Commission Regional Administrator, Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 | {{#Wiki_filter:( | ||
-ITEMS D.1 AND E.1 On November 21, 2017, the Nuclear Regulatory Commission (NRC) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG). Section V of the Confirmatory Order requires DENG to complete Items 0.1 and E.1 within 180 days of issuance of the Confirmatory Order, and to notify the NRC in writing within 30 days of completion. | Dominion Energy Nuclear Connecticut, Inc. | ||
On March 9, 2018, DENG evaluated the implementation of the Armorer function at Millstone Power Station (MPS) per Item 0.1, and reviewed the process for performing and recording in-service and out-of-service weapons inventory per Item E.1. The evaluations included a comparison of the MPS processes to other Dominion Energy and non-Dominion Energy nuclear stations. | 5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com March 28, 2018 | ||
Results of the evaluations were captured in a Station Performance Improvement Report (PIR). The PIR identified strengths and also recommended enhancements, which are being reviewed for implementation. | !5i& Dominion P" Energy U.S. Nuclear Regulatory Commission Serial No. 17-465C Regional Administrator, Region I NSSL/TFO RO 2100 Renaissance Blvd, Suite 100 Docket Nos. 50-336 King of Prussia, PA 19406-2713 50-423 License Nos. DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC. | ||
As specified in Items 0.1 and E.1, the evaluation results are available to the NRC for review during an inspection. | MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION FOR CONFIRMATORY ORDER EA-17-077 - ITEMS D.1 AND E.1 On November 21, 2017, the Nuclear Regulatory Commission (NRC) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG). | ||
Section V of the Confirmatory Order requires DENG to complete Items 0.1 and E.1 within 180 days of issuance of the Confirmatory Order, and to notify the NRC in writing within 30 days of completion. On March 9, 2018, DENG evaluated the implementation of the Armorer function at Millstone Power Station (MPS) per Item 0.1, and reviewed the process for performing and recording in-service and out-of-service weapons inventory per Item E.1. The evaluations included a comparison of the MPS processes to other Dominion Energy and non-Dominion Energy nuclear stations. Results of the evaluations were captured in a Station Performance Improvement Report (PIR). The PIR identified strengths and also recommended enhancements, which are being reviewed for implementation. As specified in Items 0.1 and E.1, the evaluation results are available to the NRC for review during an inspection. | |||
If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123. | If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123. | ||
Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Nuclear Connecticut, Inc. Commitments made in this letter: None | Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Nuclear Connecticut, Inc. | ||
' \ / cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station | Commitments made in this letter: None | ||
Serial No. 17-465C Docket Nos. 50-336/423 | |||
'\ Page 2 of 2 | |||
/ | |||
cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station}} | |||
Revision as of 11:19, 21 October 2019
| ML18094A117 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/28/2018 |
| From: | Stoddard D Dominion Energy Nuclear Connecticut |
| To: | Document Control Desk, NRC Region 1 |
| References | |
| EA-17-077 | |
| Download: ML18094A117 (2) | |
Text
(
Dominion Energy Nuclear Connecticut, Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com March 28, 2018
!5i& Dominion P" Energy U.S. Nuclear Regulatory Commission Serial No. 17-465C Regional Administrator, Region I NSSL/TFO RO 2100 Renaissance Blvd, Suite 100 Docket Nos. 50-336 King of Prussia, PA 19406-2713 50-423 License Nos. DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION FOR CONFIRMATORY ORDER EA-17-077 - ITEMS D.1 AND E.1 On November 21, 2017, the Nuclear Regulatory Commission (NRC) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG).
Section V of the Confirmatory Order requires DENG to complete Items 0.1 and E.1 within 180 days of issuance of the Confirmatory Order, and to notify the NRC in writing within 30 days of completion. On March 9, 2018, DENG evaluated the implementation of the Armorer function at Millstone Power Station (MPS) per Item 0.1, and reviewed the process for performing and recording in-service and out-of-service weapons inventory per Item E.1. The evaluations included a comparison of the MPS processes to other Dominion Energy and non-Dominion Energy nuclear stations. Results of the evaluations were captured in a Station Performance Improvement Report (PIR). The PIR identified strengths and also recommended enhancements, which are being reviewed for implementation. As specified in Items 0.1 and E.1, the evaluation results are available to the NRC for review during an inspection.
If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123.
Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Nuclear Connecticut, Inc.
Commitments made in this letter: None
Serial No. 17-465C Docket Nos. 50-336/423
'\ Page 2 of 2
/
cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station