Notification of Action Completion for Confirmatory Order EA-17-077 - Items D.1 and E.1
ML18094A117
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/28/2018
From: Stoddard D
Dominion Energy Nuclear Connecticut
To:
Document Control Desk, NRC Region 1
References
EA-17-077
Download: ML18094A117 (2)


Text

(

Dominion Energy Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 Dominion Energy.com March 28, 2018

!5i& Dominion P" Energy U.S. Nuclear Regulatory Commission Serial No. 17-465C Regional Administrator, Region I NSSL/TFO RO 2100 Renaissance Blvd, Suite 100 Docket Nos. 50-336 King of Prussia, PA 19406-2713 50-423 License Nos. DPR-65 NPF-49 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 NOTIFICATION OF ACTION COMPLETION FOR CONFIRMATORY ORDER EA-17-077 - ITEMS D.1 AND E.1 On November 21, 2017, the Nuclear Regulatory Commission (NRC) issued Confirmatory Order EA-17-077 to Dominion Energy Nuclear Connecticut, Inc. (DENG).

Section V of the Confirmatory Order requires DENG to complete Items 0.1 and E.1 within 180 days of issuance of the Confirmatory Order, and to notify the NRC in writing within 30 days of completion. On March 9, 2018, DENG evaluated the implementation of the Armorer function at Millstone Power Station (MPS) per Item 0.1, and reviewed the process for performing and recording in-service and out-of-service weapons inventory per Item E.1. The evaluations included a comparison of the MPS processes to other Dominion Energy and non-Dominion Energy nuclear stations. Results of the evaluations were captured in a Station Performance Improvement Report (PIR). The PIR identified strengths and also recommended enhancements, which are being reviewed for implementation. As specified in Items 0.1 and E.1, the evaluation results are available to the NRC for review during an inspection.

If you have any questions concerning this matter, please contact Michael Whitlock at (804) 273-3123.

Sincerely, Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Dominion Energy Nuclear Connecticut, Inc.

Commitments made in this letter: None

Serial No. 17-465C Docket Nos. 50-336/423

'\ Page 2 of 2

/

cc: U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Richard V. Guzman Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C 2 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station