ML19053A529: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Publicly Available Seismic Probabilistic Risk Assessment Reports and Corresponding NRC Staff Assessments Vogtle Electric Generating Plant Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: March 27, 2017 - ADAMS Accession No. ML17088A130 (https://www.nrc.gov/docs/ML1708/ML17088A130.pdf)
Staff Review of Seismic Probabilistic Risk Assessment: March 7, 2018 - ADAMS Accession No. ML17293A427 (https://www.nrc.gov/docs/ML1729/ML17293A427.pdf)
Beaver Valley Power Station Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: July 27, 2017 - ADAMS Accession No. ML17213A014 (https://www.nrc.gov/docs/ML1721/ML17213A014.html)
Staff Review of Seismic Probabilistic Risk Assessment: June 6, 2018 - ADAMS Accession No. ML18092A837 (https://www.nrc.gov/docs/ML1809/ML18092A837.pdf)
Watts Bar Nuclear Plant, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: June 30, 2017 - ADAMS Accession No. ML17181A485 (https://www.nrc.gov/docs/ML1718/ML17181A485.pdf)
Staff Review of Seismic Probabilistic Risk Assessment: July 10, 2018 - ADAMS Accession No. ML18115A138 (https://www.nrc.gov/docs/ML1811/ML18115A138.pdf)
Diablo Canyon Power Plant, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: April 24, 2018 - ADAMS Accession No. ML18120A201 (https://www.nrc.gov/docs/ML1812/ML18120A201.pdf)
Staff Review of Seismic Probabilistic Risk Assessment: July 10, 2018 - ADAMS Accession No. ML18254A040 (https://www.nrc.gov/docs/ML1825/ML18254A040.pdf)
Enclosure
 
Publicly Available Seismic Probabilistic Risk Assessment Reports NRC Staff Assessments in Progress North Anna Power Station, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: March 28, 2018 - ADAMS Accession No. ML181093A445 (https://www.nrc.gov/docs/ML1809/ML18093A445.pdf)
Peach Bottom Atomic Power Station, Units 2 and 3 Seismic Probabilistic Risk Assessment Summary Report: September 28, 2018 -
ADAMS Accession No. ML18240A065 (https://www.nrc.gov/docs/ML1824/ML18240A065.pdf)
Virgil C. Summer Nuclear Station, Unit 1 Seismic Probabilistic Risk Assessment Summary Report: September 28, 2018 -
ADAMS Accession No. ML18271A109 (https://www.nrc.gov/docs/ML1827/ML18271A109.pdf)
Non-Publicly Available Seismic Probabilistic Risk Assessment Reports - NRC Staff Assessments in Progress Oconee Nuclear Station, Units 1, 2, and 3 Seismic Probabilistic Risk Assessment Summary Report: December 21, 2018 - ADAMS Package Accession No. ML19009A128 (Non-Public). The enclosure to the report is non-public (ADAMS Accession No. ML19009A124) because it contains Critical Energy Infrastructure Information. The cover letter is public (ADAMS Accession No. ML19004A127) (https://www.nrc.gov/docs/ML1900/ML19004A127.pdf) 2}}

Latest revision as of 00:26, 20 October 2019

OEDO-19-00135 - Enclosure Supplemental Response to the ACRS Letter, Response to the December 15, 2016, Staff Letter Regarding; Draft Final Rule on Mitigation of Beyond-Design-Basis Events and Associated Regulatory Guidance
ML19053A529
Person / Time
Issue date: 04/09/2019
From: Robert Bernardo
Beyond-Design-Basis Management Branch
To: Riccardella P
Advisory Committee on Reactor Safeguards
Bernardo R, NRR/DLP, 301-415-2621
Shared Package
ML19053A532 List:
References
Download: ML19053A529 (2)


Text

Publicly Available Seismic Probabilistic Risk Assessment Reports and Corresponding NRC Staff Assessments Vogtle Electric Generating Plant Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: March 27, 2017 - ADAMS Accession No. ML17088A130 (https://www.nrc.gov/docs/ML1708/ML17088A130.pdf)

Staff Review of Seismic Probabilistic Risk Assessment: March 7, 2018 - ADAMS Accession No. ML17293A427 (https://www.nrc.gov/docs/ML1729/ML17293A427.pdf)

Beaver Valley Power Station Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: July 27, 2017 - ADAMS Accession No. ML17213A014 (https://www.nrc.gov/docs/ML1721/ML17213A014.html)

Staff Review of Seismic Probabilistic Risk Assessment: June 6, 2018 - ADAMS Accession No. ML18092A837 (https://www.nrc.gov/docs/ML1809/ML18092A837.pdf)

Watts Bar Nuclear Plant, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: June 30, 2017 - ADAMS Accession No. ML17181A485 (https://www.nrc.gov/docs/ML1718/ML17181A485.pdf)

Staff Review of Seismic Probabilistic Risk Assessment: July 10, 2018 - ADAMS Accession No. ML18115A138 (https://www.nrc.gov/docs/ML1811/ML18115A138.pdf)

Diablo Canyon Power Plant, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: April 24, 2018 - ADAMS Accession No. ML18120A201 (https://www.nrc.gov/docs/ML1812/ML18120A201.pdf)

Staff Review of Seismic Probabilistic Risk Assessment: July 10, 2018 - ADAMS Accession No. ML18254A040 (https://www.nrc.gov/docs/ML1825/ML18254A040.pdf)

Enclosure

Publicly Available Seismic Probabilistic Risk Assessment Reports NRC Staff Assessments in Progress North Anna Power Station, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: March 28, 2018 - ADAMS Accession No. ML181093A445 (https://www.nrc.gov/docs/ML1809/ML18093A445.pdf)

Peach Bottom Atomic Power Station, Units 2 and 3 Seismic Probabilistic Risk Assessment Summary Report: September 28, 2018 -

ADAMS Accession No. ML18240A065 (https://www.nrc.gov/docs/ML1824/ML18240A065.pdf)

Virgil C. Summer Nuclear Station, Unit 1 Seismic Probabilistic Risk Assessment Summary Report: September 28, 2018 -

ADAMS Accession No. ML18271A109 (https://www.nrc.gov/docs/ML1827/ML18271A109.pdf)

Non-Publicly Available Seismic Probabilistic Risk Assessment Reports - NRC Staff Assessments in Progress Oconee Nuclear Station, Units 1, 2, and 3 Seismic Probabilistic Risk Assessment Summary Report: December 21, 2018 - ADAMS Package Accession No. ML19009A128 (Non-Public). The enclosure to the report is non-public (ADAMS Accession No. ML19009A124) because it contains Critical Energy Infrastructure Information. The cover letter is public (ADAMS Accession No. ML19004A127) (https://www.nrc.gov/docs/ML1900/ML19004A127.pdf) 2