ML19053A529

From kanterella
Jump to navigation Jump to search
OEDO-19-00135 - Enclosure Supplemental Response to the ACRS Letter, Response to the December 15, 2016, Staff Letter Regarding; Draft Final Rule on Mitigation of Beyond-Design-Basis Events and Associated Regulatory Guidance
ML19053A529
Person / Time
Issue date: 04/09/2019
From: Robert Bernardo
Beyond-Design-Basis Management Branch
To: Riccardella P
Advisory Committee on Reactor Safeguards
Bernardo R, NRR/DLP, 301-415-2621
Shared Package
ML19053A532 List:
References
Download: ML19053A529 (2)


Text

Publicly Available Seismic Probabilistic Risk Assessment Reports and Corresponding NRC Staff Assessments Vogtle Electric Generating Plant Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: March 27, 2017 - ADAMS Accession No. ML17088A130 (https://www.nrc.gov/docs/ML1708/ML17088A130.pdf)

Staff Review of Seismic Probabilistic Risk Assessment: March 7, 2018 - ADAMS Accession No. ML17293A427 (https://www.nrc.gov/docs/ML1729/ML17293A427.pdf)

Beaver Valley Power Station Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: July 27, 2017 - ADAMS Accession No. ML17213A014 (https://www.nrc.gov/docs/ML1721/ML17213A014.html)

Staff Review of Seismic Probabilistic Risk Assessment: June 6, 2018 - ADAMS Accession No. ML18092A837 (https://www.nrc.gov/docs/ML1809/ML18092A837.pdf)

Watts Bar Nuclear Plant, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: June 30, 2017 - ADAMS Accession No. ML17181A485 (https://www.nrc.gov/docs/ML1718/ML17181A485.pdf)

Staff Review of Seismic Probabilistic Risk Assessment: July 10, 2018 - ADAMS Accession No. ML18115A138 (https://www.nrc.gov/docs/ML1811/ML18115A138.pdf)

Diablo Canyon Power Plant, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: April 24, 2018 - ADAMS Accession No. ML18120A201 (https://www.nrc.gov/docs/ML1812/ML18120A201.pdf)

Staff Review of Seismic Probabilistic Risk Assessment: July 10, 2018 - ADAMS Accession No. ML18254A040 (https://www.nrc.gov/docs/ML1825/ML18254A040.pdf)

Enclosure

Publicly Available Seismic Probabilistic Risk Assessment Reports NRC Staff Assessments in Progress North Anna Power Station, Units 1 and 2 Seismic Probabilistic Risk Assessment Summary Report: March 28, 2018 - ADAMS Accession No. ML181093A445 (https://www.nrc.gov/docs/ML1809/ML18093A445.pdf)

Peach Bottom Atomic Power Station, Units 2 and 3 Seismic Probabilistic Risk Assessment Summary Report: September 28, 2018 -

ADAMS Accession No. ML18240A065 (https://www.nrc.gov/docs/ML1824/ML18240A065.pdf)

Virgil C. Summer Nuclear Station, Unit 1 Seismic Probabilistic Risk Assessment Summary Report: September 28, 2018 -

ADAMS Accession No. ML18271A109 (https://www.nrc.gov/docs/ML1827/ML18271A109.pdf)

Non-Publicly Available Seismic Probabilistic Risk Assessment Reports - NRC Staff Assessments in Progress Oconee Nuclear Station, Units 1, 2, and 3 Seismic Probabilistic Risk Assessment Summary Report: December 21, 2018 - ADAMS Package Accession No. ML19009A128 (Non-Public). The enclosure to the report is non-public (ADAMS Accession No. ML19009A124) because it contains Critical Energy Infrastructure Information. The cover letter is public (ADAMS Accession No. ML19004A127) (https://www.nrc.gov/docs/ML1900/ML19004A127.pdf) 2