{{#Wiki_filter:JOB PERFORMANCE MEASURE TASK CONDITIONS: | {{#Wiki_filter:JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit 1 Admin NSO. | : 1. You are the Unit 1 Admin NSO. | ||
: 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak. | : 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak. | ||
: 3. You have been ordered to perform a manual Steam Generat or Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1. | : 3. You have been ordered to perform a manual Steam Generat or Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Complete step F.2, of 1BOSR SG | : 1. Complete step F.2, of 1BOSR SG | ||
-1, Steam Generator Pr imary to Secondary Leakage Estimation. | -1, Steam Generator Pr imary to Secondary Leakage Estimation. | ||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit 1 Admin NSO. | : 1. You are the Unit 1 Admin NSO. | ||
: 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak. | : 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak. | ||
: 3. You have been ordered to perform a manual Steam Gener ator Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1. | : 3. You have been ordered to perform a manual Steam Gener ator Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Complete step F.2, of 1BOSR SG-1 , Steam Generator Pr imary to Secondary Leakage Estimation. | : 1. Complete step F.2, of 1BOSR SG-1 , Steam Generator Pr imary to Secondary Leakage Estimation. | ||
| Line 41: | Line 41: | ||
IN PLANT______ | IN PLANT______ | ||
SIMULATOR___ | SIMULATOR___ | ||
X__ MATERIALS: | X__ MATERIALS: | ||
: 1. Copy of 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation GENERAL | : 1. Copy of 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. Byron Technical Specifications | : 1. Byron Technical Specifications | ||
: 2. Byron Tec hnical Specification Bases 3. 1BOA SEC-1, SG Tube Leak TASK STANDARDS: | : 2. Byron Tec hnical Specification Bases 3. 1BOA SEC-1, SG Tube Leak TASK STANDARDS: | ||
: 1. Determine Pr imary to Secondary Leakage per step F.2 of 1BOSR SG-1. 2. Request Chemistry to initiate sampling per BCP 300-9 TASK CONDITIONS: 1. You are the Unit 1 Admin NSO. | : 1. Determine Pr imary to Secondary Leakage per step F.2 of 1BOSR SG-1. 2. Request Chemistry to initiate sampling per BCP 300-9 TASK CONDITIONS: 1. You are the Unit 1 Admin NSO. | ||
: 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak. 3. You have been ordered to preform a manual Steam Generator Pr imary to Secondary Leakage Estimation calculation pe r step F.2 of 1BOSR SG-1. | : 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak. 3. You have been ordered to preform a manual Steam Generator Pr imary to Secondary Leakage Estimation calculation pe r step F.2 of 1BOSR SG-1. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Complete 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation. CRITICAL ELEMENTS: (*) 2.b, 2.c & 2.g | : 1. Complete 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation. CRITICAL ELEMENTS: (*) 2.b, 2.c & 2.g | ||
APPROXIMATE COMPLETION TIME: 30 minutes Performance Checklist Standard Sat Unsat N/A RECORD START TIME ________ | APPROXIMATE COMPLETION TIME: 30 minutes Performance Checklist Standard Sat Unsat N/A RECORD START TIME ________ | ||
: 1. Review Prerequisites, Precautions, & Limitations and Actions. | : 1. Review Prerequisites, Precautions, & Limitations and Actions. | ||
Cue: When asked, inform applicant that Chemistry has been NOTIFIED to initiate sampling per BCP 300-9 Cue: When asked for SJAE readings and Chemistry Dept. printout of | Cue: When asked, inform applicant that Chemistry has been NOTIFIED to initiate sampling per BCP 300-9 Cue: When asked for SJAE readings and Chemistry Dept. printout of | ||
| Line 65: | Line 65: | ||
*3. Record individual SJAE flow readings from shiftly dailies or local readings | *3. Record individual SJAE flow readings from shiftly dailies or local readings | ||
from NLO. | from NLO. | ||
: 4. Request Chem Dept RCS Gas Grab sample result | : 4. Request Chem Dept RCS Gas Grab sample result | ||
| Line 134: | Line 134: | ||
________________________ | ________________________ | ||
__________________________________________________ | __________________________________________________ | ||
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit Supervisor. | : 1. You are the Unit Supervisor. | ||
: 2. Unit 1 is currently in a refuel outage with fuel movement in-progress. | : 2. Unit 1 is currently in a refuel outage with fuel movement in-progress. | ||
: 3. The Unit 1 assist NSO has just info rmed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed. | : 3. The Unit 1 assist NSO has just info rmed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed. | ||
: 4. 1BOA INST-1, Attachment C, has been completed through step 6.b. | : 4. 1BOA INST-1, Attachment C, has been completed through step 6.b. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Perform applicable steps of 1BOA INST-1 and complete required paper work. | : 1. Perform applicable steps of 1BOA INST-1 and complete required paper work. | ||
Page 2 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS: | Page 2 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit Supervisor. | : 1. You are the Unit Supervisor. | ||
: 2. Unit 1 is currently in a refuel outage with fuel movement in-progress. | : 2. Unit 1 is currently in a refuel outage with fuel movement in-progress. | ||
: 3. The Unit 1 assist NSO has just info rmed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed. | : 3. The Unit 1 assist NSO has just info rmed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed. | ||
: 4. 1BOA INST-1, Attachment C, has been completed through step 6.b. | : 4. 1BOA INST-1, Attachment C, has been completed through step 6.b. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Perform applicable steps of 1BOA INST-1 and complete required paper work. | : 1. Perform applicable steps of 1BOA INST-1 and complete required paper work. | ||
| Line 166: | Line 166: | ||
IN PLANT______ | IN PLANT______ | ||
SIMULATOR______ | SIMULATOR______ | ||
MATERIALS: | MATERIALS: | ||
: 1. Copy of Byron Technical Specifications and Bases | : 1. Copy of Byron Technical Specifications and Bases | ||
: 2. 1BOL 9.3, LCOAR Nuclear Instrumentation | : 2. 1BOL 9.3, LCOAR Nuclear Instrumentation | ||
| Line 173: | Line 173: | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. Byron Technical Specifications | : 1. Byron Technical Specifications | ||
: 2. Byron Technical Specification Bases | : 2. Byron Technical Specification Bases | ||
: 3. 1BOL 9.3, LCOAR Nuclear Instrumentation | : 3. 1BOL 9.3, LCOAR Nuclear Instrumentation | ||
TASK STANDARDS: | TASK STANDARDS: | ||
: 1. Determine Technical Specification requirements | : 1. Determine Technical Specification requirements | ||
: 2. Complete 1BOL 9.3, LCOAR Nuclear Instrumentation | : 2. Complete 1BOL 9.3, LCOAR Nuclear Instrumentation | ||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. You are the Unit Superviosr. | : 1. You are the Unit Superviosr. | ||
: 2. Unit 1 is currently in a refuel outage with fuel movement in-progress. 3. The Unit 1 assist NSO has just inform ed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed. | : 2. Unit 1 is currently in a refuel outage with fuel movement in-progress. 3. The Unit 1 assist NSO has just inform ed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed. | ||
INITIATING CUES: | INITIATING CUES: | ||
| Line 190: | Line 190: | ||
CRITICAL ELEMENTS: (*) 3 & 4 | CRITICAL ELEMENTS: (*) 3 & 4 | ||
APPROXIMATE COMPLETION TIME: 10 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________ | APPROXIMATE COMPLETION TIME: 10 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________ | ||
: 1. Refer to 1BOA INST-1 Nuclear Inst Malfunction Unit 1. | : 1. Refer to 1BOA INST-1 Nuclear Inst Malfunction Unit 1. | ||
REVIEW 1BOA INST-1 | REVIEW 1BOA INST-1 | ||
___ ___ ____ | ___ ___ ____ | ||
: 2. Refer to Byron Tech Spec's. | : 2. Refer to Byron Tech Spec's. | ||
| Line 220: | Line 220: | ||
___________________________________________________________________________ | ___________________________________________________________________________ | ||
Page 1 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS: | Page 1 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are an Extra NSO on shift. | : 1. You are an Extra NSO on shift. | ||
: 2. Unit 1 is currently in at 100% reactor power. | : 2. Unit 1 is currently in at 100% reactor power. | ||
: 3. Passport is currently unavail able to write Clearance Orders. | : 3. Passport is currently unavail able to write Clearance Orders. | ||
: 4. The Unit 1 Unit Supervisor requests that you write a Clearance Order for the 1A CV pump by hand. | : 4. The Unit 1 Unit Supervisor requests that you write a Clearance Order for the 1A CV pump by hand. | ||
| Line 232: | Line 232: | ||
so that Maintenance can r eplace its outboard pump seal. | so that Maintenance can r eplace its outboard pump seal. | ||
Page 2 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS: | Page 2 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are an Extra NSO on shift. | : 1. You are an Extra NSO on shift. | ||
: 2. Unit 1 is currently in at 100% reactor power. | : 2. Unit 1 is currently in at 100% reactor power. | ||
: 3. Passport is currently unavail able to write Clearance Orders. | : 3. Passport is currently unavail able to write Clearance Orders. | ||
: 4. The Unit 1 Unit Supervisor requests that you write a Clearance Order for the 1A CV pump by hand. | : 4. The Unit 1 Unit Supervisor requests that you write a Clearance Order for the 1A CV pump by hand. | ||
INITIATING CUES: | INITIATING CUES: | ||
| Line 256: | Line 256: | ||
IN PLANT______ | IN PLANT______ | ||
SIMULATOR______ | SIMULATOR______ | ||
MATERIALS: | MATERIALS: | ||
: 1. OP-AA-109-101 Attachment 14, Part 1 | : 1. OP-AA-109-101 Attachment 14, Part 1 | ||
: 2. Electrical and Mechanical Prints | : 2. Electrical and Mechanical Prints | ||
| Line 263: | Line 263: | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. OP-AA-109-101, Clearance and Tagging | : 1. OP-AA-109-101, Clearance and Tagging | ||
: 2. P&ID M-64 sheets 3a, 4b | : 2. P&ID M-64 sheets 3a, 4b | ||
: 3. CV Electrical Prints 6E-1-4030CV01, CV04, and CV16 | : 3. CV Electrical Prints 6E-1-4030CV01, CV04, and CV16 | ||
TASK STANDARDS: | TASK STANDARDS: | ||
: 1. Determine the isolation points to hang a Clearance Order on the 1CV01PA pump. 2. Provide an adequate zone of protection to allow a pump seal replacement. | : 1. Determine the isolation points to hang a Clearance Order on the 1CV01PA pump. 2. Provide an adequate zone of protection to allow a pump seal replacement. | ||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. You are an Extra NSO on shift. | : 1. You are an Extra NSO on shift. | ||
: 2. Unit 1 is currently in at 100% reactor power. | : 2. Unit 1 is currently in at 100% reactor power. | ||
: 3. Passport is currently unavail able to write Clearance Orders. | : 3. Passport is currently unavail able to write Clearance Orders. | ||
: 4. The Unit 1 Unit Supervisor requests that y ou write a Clearance Order for the 1A CV pump by hand. INITIATING CUES: | : 4. The Unit 1 Unit Supervisor requests that y ou write a Clearance Order for the 1A CV pump by hand. INITIATING CUES: | ||
The Unit Supervisor requests that you hand-write a Clearance Order for the Unit 1A CV pump | The Unit Supervisor requests that you hand-write a Clearance Order for the Unit 1A CV pump | ||
so that Maintenance can r eplace its outboard pump seal. | so that Maintenance can r eplace its outboard pump seal. | ||
CRITICAL ELEMENTS: (*) 2, 3 & 4 APPROXIMATE COMPLETION TIME: 15 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________ | CRITICAL ELEMENTS: (*) 2, 3 & 4 APPROXIMATE COMPLETION TIME: 15 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________ | ||
: 1. Perform Hand Written C/O for 1A CV Pp seal replacement. | : 1. Perform Hand Written C/O for 1A CV Pp seal replacement. | ||
Perform C/O for 1A CV Pp | Perform C/O for 1A CV Pp | ||
| Line 302: | Line 302: | ||
isolation valves are CLOSED to | isolation valves are CLOSED to | ||
isolate pump. | isolate pump. | ||
: 1. MCB Control Switch | : 1. MCB Control Switch | ||
: 2. Pump Breaker Fuses | : 2. Pump Breaker Fuses | ||
: 3. Pump Breaker | : 3. Pump Breaker | ||
: 4. Discharge Valve | : 4. Discharge Valve | ||
: 5. Recirc Valve | : 5. Recirc Valve | ||
: 6. Suction Valve | : 6. Suction Valve | ||
| Line 318: | Line 318: | ||
Performance Checklist Standard Sat Unsat N/A Page 5 of 5 | Performance Checklist Standard Sat Unsat N/A Page 5 of 5 | ||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit Supervisor. | : 1. You are the Unit Supervisor. | ||
: 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Assist NSO to perform a manual Steam Generator Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1. | : 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Assist NSO to perform a manual Steam Generator Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1. | ||
: 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1. | : 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Review 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation for completene ss and accurracy of results. | : 1. Review 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation for completene ss and accurracy of results. | ||
JOB PERFORMANCE MEASURE TASK CONDITIONS: | JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit Supervisor. | : 1. You are the Unit Supervisor. | ||
: 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Assist NSO to perform a manual Steam Generator Primary to Secondary Leakage Estimation calculati on per step F.2 of 1BOSR SG-1. | : 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Assist NSO to perform a manual Steam Generator Primary to Secondary Leakage Estimation calculati on per step F.2 of 1BOSR SG-1. | ||
: 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1. | : 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Review 1BOSR SG-1, Steam Gener ator Primary to Secondary Leakage Estimation for completene ss and accurracy of results. | : 1. Review 1BOSR SG-1, Steam Gener ator Primary to Secondary Leakage Estimation for completene ss and accurracy of results. | ||
| Line 342: | Line 342: | ||
IN PLANT______ | IN PLANT______ | ||
SIMULATOR___ | SIMULATOR___ | ||
X__ MATERIALS: | X__ MATERIALS: | ||
: 1. Copy of 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation GENERAL | : 1. Copy of 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. Byron Technical Specifications | : 1. Byron Technical Specifications | ||
: 2. Byron Tec hnical Specification Bases TASK STANDARDS: | : 2. Byron Tec hnical Specification Bases TASK STANDARDS: | ||
: 1. Determine Primary to Secondary Leakage 2. Request Chemistry to initiate sampling per BCP 300-9 | : 1. Determine Primary to Secondary Leakage 2. Request Chemistry to initiate sampling per BCP 300-9 | ||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. You are the Unit Supervisor. | : 1. You are the Unit Supervisor. | ||
: 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Admin NSO to preform a manual Steam Generator Pr imary to Secondary Leakage Estimation calculation pe r step F.2 of 1BOSR SG-1. 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1. | : 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Admin NSO to preform a manual Steam Generator Pr imary to Secondary Leakage Estimation calculation pe r step F.2 of 1BOSR SG-1. 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Review 1BOSR SG-1, Steam Generator Primary to Sec ondary Leakage Estimation for completeness and accurracy of results. CRITICAL ELEMENTS: (*) 2, 3 & 4 | : 1. Review 1BOSR SG-1, Steam Generator Primary to Sec ondary Leakage Estimation for completeness and accurracy of results. CRITICAL ELEMENTS: (*) 2, 3 & 4 | ||
APPROXIMATE COMPLETION TIME: 10 minutes Performance Checklist Standard Sat Unsat N/A RECORD START TIME ________ | APPROXIMATE COMPLETION TIME: 10 minutes Performance Checklist Standard Sat Unsat N/A RECORD START TIME ________ | ||
: 1. Review SJAE Rad Monitor 1PR27J reading on data D2. | : 1. Review SJAE Rad Monitor 1PR27J reading on data D2. | ||
*2. Determine Total SJAE flow in step 2.b is | *2. Determine Total SJAE flow in step 2.b is | ||
| Line 403: | Line 403: | ||
_____________________ | _____________________ | ||
______________________________ | ______________________________ | ||
1 JOB PERFORMANCE MEASURE TASK CONDITIONS: | 1 JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are an Assist NSO. | : 1. You are an Assist NSO. | ||
: 2. Both Units are in Mode 1, Steady State Power. | : 2. Both Units are in Mode 1, Steady State Power. | ||
: 3. Chemistry Department has informed the Control Room that the activity in the 0A gas decay tank (GDT) has been measured at 8.68 x 10 4 curies. INITIATING CUES: | : 3. Chemistry Department has informed the Control Room that the activity in the 0A gas decay tank (GDT) has been measured at 8.68 x 10 4 curies. INITIATING CUES: | ||
The Unit Supervisor directs you to take acti on to reduce activity level in the 0A GDT per 0BOA RAD-3, DECAY TANK HIGH ACTIVITY , while the Shift Manager evaluates for Emergency Action Levels. | The Unit Supervisor directs you to take acti on to reduce activity level in the 0A GDT per 0BOA RAD-3, DECAY TANK HIGH ACTIVITY , while the Shift Manager evaluates for Emergency Action Levels. | ||
| Line 437: | Line 437: | ||
Correctly calculate the pressure required in the 0A GDT to reduce activity level to within limits. | Correctly calculate the pressure required in the 0A GDT to reduce activity level to within limits. | ||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. You are an Assist NSO. | : 1. You are an Assist NSO. | ||
: 2. Both Units are in Mode 1, Steady State Power. | : 2. Both Units are in Mode 1, Steady State Power. | ||
: 3. Chemistry Department has informed the Control Room that the activity in the 0A gas decay tank (GDT) has been measured at 8.68 x 10 4 curies. INITIATING CUES: | : 3. Chemistry Department has informed the Control Room that the activity in the 0A gas decay tank (GDT) has been measured at 8.68 x 10 4 curies. INITIATING CUES: | ||
The Unit Supervisor directs you to take acti on to reduce activity level in the 0A GDT per 0BOA RAD-3, DECAY TANK HIGH ACTIVITY , while the Shift Manager evaluates for Emergency Action Levels. | The Unit Supervisor directs you to take acti on to reduce activity level in the 0A GDT per 0BOA RAD-3, DECAY TANK HIGH ACTIVITY , while the Shift Manager evaluates for Emergency Action Levels. | ||
| Line 445: | Line 445: | ||
CRITICAL ELEMENTS: (*) | CRITICAL ELEMENTS: (*) | ||
3 and 4 APPROXIMATE COMPLETION TIME: | 3 and 4 APPROXIMATE COMPLETION TIME: | ||
10 Minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 3 RECORD START TIME________ | 10 Minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 3 RECORD START TIME________ | ||
: 1. Refer to 0BOA RAD-3 for directionNote: Provide copy of BOA RAD-3 as necessary. | : 1. Refer to 0BOA RAD-3 for directionNote: Provide copy of BOA RAD-3 as necessary. | ||
Locate a copy of 0BOA RAD-3, Decay Tank High Activity. 2. Suspend radioactive additions to the OA GDT. Cue: 0A GDT is still IN SERVICE Cue: 0D GDT is being placed in service per BOP GW-6. | Locate a copy of 0BOA RAD-3, Decay Tank High Activity. 2. Suspend radioactive additions to the OA GDT. Cue: 0A GDT is still IN SERVICE Cue: 0D GDT is being placed in service per BOP GW-6. | ||
| Line 488: | Line 488: | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 5 COMMENTS: | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 5 COMMENTS: | ||
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 6 CALCULATION | PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 6 CALCULATION | ||
: 1. PA = 88 + 15 PA = | : 1. PA = 88 + 15 PA = | ||
103 psi 2. Plim = 103 x (5 x 10 4 curies) Plim = | 103 psi 2. Plim = 103 x (5 x 10 4 curies) Plim = | ||
59.33 psi 8.68 x 10 4 curies 3. Indicated Pressure equivalent to Plim = 59.33 - 15 = | 59.33 psi 8.68 x 10 4 curies 3. Indicated Pressure equivalent to Plim = 59.33 - 15 = | ||
44.33 Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | 44.33 Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit Supervisor. | : 1. You are the Unit Supervisor. | ||
: 2. Unit 1 is currently at 100% reactor power. | : 2. Unit 1 is currently at 100% reactor power. | ||
: 3. Passport is currently unavail able to write Clearance Orders. | : 3. Passport is currently unavail able to write Clearance Orders. | ||
: 4. The Unit 1 assist NSO has just comple ted writing a Clearance Order for the Unit 1A CV pump by hand. | : 4. The Unit 1 assist NSO has just comple ted writing a Clearance Order for the Unit 1A CV pump by hand. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Review and approve the hand written Clear ance Order for the Unit 1A CV pump. | : 1. Review and approve the hand written Clear ance Order for the Unit 1A CV pump. | ||
Page 2 of 4 JOB PERFORMANCE MEASURE TASK CONDITIONS: | Page 2 of 4 JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Unit Supervisor. | : 1. You are the Unit Supervisor. | ||
: 2. Unit 1 is currently at 100% reactor power. | : 2. Unit 1 is currently at 100% reactor power. | ||
: 3. Passport is currently unavail able to write Clearance Orders. | : 3. Passport is currently unavail able to write Clearance Orders. | ||
: 4. The Unit 1 assist NSO has just comple ted writing a Clearance Order for the Unit 1A CV pump by hand. | : 4. The Unit 1 assist NSO has just comple ted writing a Clearance Order for the Unit 1A CV pump by hand. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. Review and approve the hand written Clear ance Order for the Unit 1A CV pump. | : 1. Review and approve the hand written Clear ance Order for the Unit 1A CV pump. | ||
| Line 523: | Line 523: | ||
IN PLANT______ | IN PLANT______ | ||
SIMULATOR______ | SIMULATOR______ | ||
MATERIALS: | MATERIALS: | ||
: 1. Copy of Hand Written Clearance Order | : 1. Copy of Hand Written Clearance Order | ||
: 2. Marked up Electrical and Mechanical Prints | : 2. Marked up Electrical and Mechanical Prints | ||
| Line 530: | Line 530: | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. OP-AA-109-101, Clearance and Tagging | : 1. OP-AA-109-101, Clearance and Tagging | ||
: 2. P&ID M-64 sheets 3a; 4b | : 2. P&ID M-64 sheets 3a; 4b | ||
: 3. CV Electrical Prints 1-4030CV01; CV04; CV16 TASK STANDARDS: | : 3. CV Electrical Prints 1-4030CV01; CV04; CV16 TASK STANDARDS: | ||
: 1. Determine that Clearance Order c ontains several flaws and needs to be re-worked. 2. Do not approve / sign Clearance Order | : 1. Determine that Clearance Order c ontains several flaws and needs to be re-worked. 2. Do not approve / sign Clearance Order | ||
TASK CONDITIONS: | TASK CONDITIONS: | ||
: 1. You are the Unit Superviosr. | : 1. You are the Unit Superviosr. | ||
: 2. Unit 1 is currently in at 100% reactor power. | : 2. Unit 1 is currently in at 100% reactor power. | ||
: 3. Passport is currently unavail able to write Clearance Orders. | : 3. Passport is currently unavail able to write Clearance Orders. | ||
: 4. The Unit 1 assist NSO has just complet ed writing a Clearance Order for the Unit 1A CV pump by hand. | : 4. The Unit 1 assist NSO has just complet ed writing a Clearance Order for the Unit 1A CV pump by hand. | ||
INITIATING CUES: | INITIATING CUES: | ||
Review and approve the hand written Clearanc e Order for the Unit 1A CV pump. | Review and approve the hand written Clearanc e Order for the Unit 1A CV pump. | ||
CRITICAL ELEMENTS: (*) 2, 3 & 4 APPROXIMATE COMPLETION TIME: 15 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 4 RECORD START TIME ________ | CRITICAL ELEMENTS: (*) 2, 3 & 4 APPROXIMATE COMPLETION TIME: 15 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 4 RECORD START TIME ________ | ||
: 1. Refer to Hand Written C/O for 1A CV Pp. | : 1. Refer to Hand Written C/O for 1A CV Pp. | ||
Review C/O for 1A CV Pp | Review C/O for 1A CV Pp | ||
| Line 577: | Line 577: | ||
Job Performance Measure | Job Performance Measure | ||
Task Conditions: | Task Conditions: | ||
: 1. You are the Unit 1 Assist NSO | : 1. You are the Unit 1 Assist NSO | ||
: 2. Unit 1 is currently operating at 100% power with all systems in automatic control. | : 2. Unit 1 is currently operating at 100% power with all systems in automatic control. | ||
Initiating Cue: | Initiating Cue: | ||
: 1. Fire Alarm 1D-37 on 1PM09J is alarming. Address the alarm per the applicable BAR. | : 1. Fire Alarm 1D-37 on 1PM09J is alarming. Address the alarm per the applicable BAR. | ||
Job Performance Measure | Job Performance Measure | ||
Task Conditions: | Task Conditions: | ||
: 1. You are the Unit 1 Assist NSO | : 1. You are the Unit 1 Assist NSO | ||
: 2. Unit 1 is currently operating at 100% power with all systems in automatic control. | : 2. Unit 1 is currently operating at 100% power with all systems in automatic control. | ||
Initiating Cue: | Initiating Cue: | ||
: 1. Fire Alarm 1D-37 on 1PM09J is alarming. Address the alarm per the applicable BAR. | : 1. Fire Alarm 1D-37 on 1PM09J is alarming. Address the alarm per the applicable BAR. | ||
| Line 605: | Line 605: | ||
Location: In Plant _________ Simulator: ____________ | Location: In Plant _________ Simulator: ____________ | ||
Materials: | Materials: | ||
: 1. BAP 1100-10, Response Procedure for Fire | : 1. BAP 1100-10, Response Procedure for Fire | ||
: 2. BAR 1PM09J-E17, U1 Turbi ne Bldg Mezz. Floor 426' (1D-37) | : 2. BAR 1PM09J-E17, U1 Turbi ne Bldg Mezz. Floor 426' (1D-37) | ||
: 3. BOP FR-1, Fire Response Guidelines | : 3. BOP FR-1, Fire Response Guidelines | ||
| Line 613: | Line 613: | ||
==References:== | ==References:== | ||
: 1. BAP 1100-10, Response Procedure for Fire | : 1. BAP 1100-10, Response Procedure for Fire | ||
: 2. BAR 1PM09J-E17, U1 Turbi ne Bldg Mezz. Floor 426' (1D-37) | : 2. BAR 1PM09J-E17, U1 Turbi ne Bldg Mezz. Floor 426' (1D-37) | ||
: 3. BOP FR-1, Fire Response Guidelines Task Standards: | : 3. BOP FR-1, Fire Response Guidelines Task Standards: | ||
: 1. Refer to BAR 1PM09J-E17 for Fire Alarm 1D-37 | : 1. Refer to BAR 1PM09J-E17 for Fire Alarm 1D-37 | ||
: 2. Refer to BAP 1100-10, Response Procedure for Fire | : 2. Refer to BAP 1100-10, Response Procedure for Fire | ||
: 3. Complete Section C of BAP 1100-10 | : 3. Complete Section C of BAP 1100-10 | ||
Task Conditions: | Task Conditions: | ||
: 1. You are the Unit 1 Assist NSO | : 1. You are the Unit 1 Assist NSO | ||
: 2. Unit 1 is at 100% power wit h all controls in Automatic | : 2. Unit 1 is at 100% power wit h all controls in Automatic | ||
Initiating Cue: | Initiating Cue: | ||
: 1. Respond to changing plant conditions | : 1. Respond to changing plant conditions | ||
Critical Elements: | Critical Elements: | ||
(*) 4, 5, 6, 7 | (*) 4, 5, 6, 7 | ||
| Line 640: | Line 640: | ||
Turb. Bldg Fire Alarm | Turb. Bldg Fire Alarm | ||
Note: Examiner to provide BAR 1PM09J-E7 | Note: Examiner to provide BAR 1PM09J-E7 | ||
: 1. Refer to BAR 1PM09J-E17, U1 TB 426' Mezz. | : 1. Refer to BAR 1PM09J-E17, U1 TB 426' Mezz. | ||
Note: The dispatched EO reports a fire near the Hydrogen Seal Oil Skid. | Note: The dispatched EO reports a fire near the Hydrogen Seal Oil Skid. | ||
: 2. The U1 Assist dispatches an EO to investigate at | : 2. The U1 Assist dispatches an EO to investigate at | ||
the location of the alarm. | the location of the alarm. | ||
: 3. U1 Assist NSO verbally notifies the Unit | : 3. U1 Assist NSO verbally notifies the Unit | ||
| Line 687: | Line 687: | ||
*6. U1 Assist NSO actuates the plant fire alarm for | *6. U1 Assist NSO actuates the plant fire alarm for | ||
approximately 2 minutes Note: CO 2 or Halon systems will not actuate as a result of this fire. | approximately 2 minutes Note: CO 2 or Halon systems will not actuate as a result of this fire. | ||
: 7. U1 Assist NSO should call Rad Protection and | : 7. U1 Assist NSO should call Rad Protection and | ||
| Line 700: | Line 700: | ||
Department assistance and Emergency Medical | Department assistance and Emergency Medical | ||
Service assistance. | Service assistance. | ||
: 8. U1 Assist NSO will receive radio communication from Fire | : 8. U1 Assist NSO will receive radio communication from Fire | ||
| Line 774: | Line 774: | ||
___ ___ ___ | ___ ___ ___ | ||
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the Field Supervisor. | : 1. You are the Field Supervisor. | ||
: 2. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed. | : 2. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed. | ||
: 3. You have the Liquid Release Package and it is completed up to step 8.5. | : 3. You have the Liquid Release Package and it is completed up to step 8.5. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. You are to review BCP 400-TWX01 and ensure sections 1, 2, 3, 4, 5, and 6 have been completed properly to authorize the liquid release. | : 1. You are to review BCP 400-TWX01 and ensure sections 1, 2, 3, 4, 5, and 6 have been completed properly to authorize the liquid release. | ||
Page 2 of 5 TASK CONDITIONS: | Page 2 of 5 TASK CONDITIONS: | ||
: 1. You are the Field Supervisor. | : 1. You are the Field Supervisor. | ||
: 2. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed. | : 2. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed. | ||
: 3. You have the Liquid Release Package and it is completed up to step 8.5. | : 3. You have the Liquid Release Package and it is completed up to step 8.5. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. You are to review BCP 400-TWX01 and ensure sections 1, 2, 3, 4, 5, and 6 have been completed properly to authorize the liquid release. | : 1. You are to review BCP 400-TWX01 and ensure sections 1, 2, 3, 4, 5, and 6 have been completed properly to authorize the liquid release. | ||
| Line 798: | Line 798: | ||
LOCATION: | LOCATION: | ||
IN PLANT______ | IN PLANT______ | ||
SIMULATOR______ MATERIALS: | SIMULATOR______ MATERIALS: | ||
: 1. BC P 400-TWX01, Rev. 53 | : 1. BC P 400-TWX01, Rev. 53 | ||
: 2. 0BOL 11.a, Radioactive Liquid Effluent Monitoring Instrumentation | : 2. 0BOL 11.a, Radioactive Liquid Effluent Monitoring Instrumentation | ||
: 3. 0BRSR 11.c.1-1, Radioactive Liquid Effluents - Sh ift Manager Request - Prior to Each Liquid Release??? 4. Chemistry Sample results from 0WX01T. | : 3. 0BRSR 11.c.1-1, Radioactive Liquid Effluents - Sh ift Manager Request - Prior to Each Liquid Release??? 4. Chemistry Sample results from 0WX01T. | ||
: 5. Radiation Protection analysis for a Liquid Release Package. GENERAL | : 5. Radiation Protection analysis for a Liquid Release Package. GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. Byron Technical Specification | : 1. Byron Technical Specification | ||
: 2. BCP 400-TWX01 TASK STANDARDS: | : 2. BCP 400-TWX01 TASK STANDARDS: | ||
: 1. Determine that section 5.4 Rad Monito r Setpoints were incorrectly chosen. | : 1. Determine that section 5.4 Rad Monito r Setpoints were incorrectly chosen. | ||
: 2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path ( 0WX001 is recorded instead of 0WX630). 4. Determine that step 6.16.10 is misssing a verification initial. CRITICAL ELEMENTS: (*) 2, 3, 4, & 5 APPROXIMATE COMPLETION TIME: 20 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________ | : 2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path ( 0WX001 is recorded instead of 0WX630). 4. Determine that step 6.16.10 is misssing a verification initial. CRITICAL ELEMENTS: (*) 2, 3, 4, & 5 APPROXIMATE COMPLETION TIME: 20 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________ | ||
: 1. Refer to BCP 400-TWX01, Liquid Radwaste Release Form. | : 1. Refer to BCP 400-TWX01, Liquid Radwaste Release Form. | ||
*2. Determine that the Rad Protection Supervisor did not sign step 5.9. | *2. Determine that the Rad Protection Supervisor did not sign step 5.9. | ||
| Line 846: | Line 846: | ||
Performance Checklist Standard Sat Unsat N/A Page 5 of 5 Comment: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ | Performance Checklist Standard Sat Unsat N/A Page 5 of 5 Comment: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS: | ||
: 1. You are the WEC Supervisor. | : 1. You are the WEC Supervisor. | ||
: 2. You have just received a call that the door 0DSD351 (Turbine Bldg into the Div. | : 2. You have just received a call that the door 0DSD351 (Turbine Bldg into the Div. | ||
11 ESF Switchgear Room) is broken and stuck half way open. | 11 ESF Switchgear Room) is broken and stuck half way open. | ||
: 3. All plant fire protection and fi re detection systems are available. | : 3. All plant fire protection and fi re detection systems are available. | ||
: 4. An Extra SRO will address Fire Protection LOCAR's and Fire Watch Paper Work. | : 4. An Extra SRO will address Fire Protection LOCAR's and Fire Watch Paper Work. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. As the WEC Supervisor initiate the PBI paper work. | : 1. As the WEC Supervisor initiate the PBI paper work. | ||
Examinee's Cue Sheet TASK CONDITIONS: | Examinee's Cue Sheet TASK CONDITIONS: | ||
: 1. You are the WEC Supervisor. | : 1. You are the WEC Supervisor. | ||
: 2. You have just received a call that the door 0DSD351 (Turbine Bldg into the Div. | : 2. You have just received a call that the door 0DSD351 (Turbine Bldg into the Div. | ||
11 ESF Switchgear Room) is broken and stuck half way open. | 11 ESF Switchgear Room) is broken and stuck half way open. | ||
: 3. All plant fire protection and fi re detection systems are available. | : 3. All plant fire protection and fi re detection systems are available. | ||
: 4. An Extra SRO will address Fire Protection LOCAR's and Fire Watch Paper Work. | : 4. An Extra SRO will address Fire Protection LOCAR's and Fire Watch Paper Work. | ||
INITIATING CUES: | INITIATING CUES: | ||
: 1. As the WEC Supervisor initiate the PBI paper work. | : 1. As the WEC Supervisor initiate the PBI paper work. | ||
| Line 875: | Line 875: | ||
LOCATION: | LOCATION: | ||
IN PLANT______ | IN PLANT______ | ||
SIMULATOR______ MATERIALS: | SIMULATOR______ MATERIALS: | ||
: 1. CC-AA-201, Pl ant Barrier Control Program | : 1. CC-AA-201, Pl ant Barrier Control Program | ||
: 2. BAP 1100-3, Plant Barrier Impairment (PBI) Program | : 2. BAP 1100-3, Plant Barrier Impairment (PBI) Program | ||
: 3. BAP 1100-3A3, Pre-Evaluated Plant Barrier Matrix 4. 0BOL 10.g, LCOAR Fire Assemblies TRM LCO # 3.10.g GENERAL | : 3. BAP 1100-3A3, Pre-Evaluated Plant Barrier Matrix 4. 0BOL 10.g, LCOAR Fire Assemblies TRM LCO # 3.10.g GENERAL | ||
==REFERENCES:== | ==REFERENCES:== | ||
: 1. Byron Technical Requirements Manual | : 1. Byron Technical Requirements Manual | ||
: 2. Byr on Station Fire Plan 3. Byron Station UFSAR TASK STANDARDS: | : 2. Byr on Station Fire Plan 3. Byron Station UFSAR TASK STANDARDS: | ||
: 1. Complete section I. of Attatchment 1, Plant Barrier Impairment Permit. 2. Determine the broken door is a Fire Barrier , Security Barrier, and a HELB barrier and complete section II. of Attatchment 1, Plant Barrier Impairment Permit. 3. Determine that a hourly fire watch must be initiated and document on Attatchment 1, Plant Barrier Impairment Permi | : 1. Complete section I. of Attatchment 1, Plant Barrier Impairment Permit. 2. Determine the broken door is a Fire Barrier , Security Barrier, and a HELB barrier and complete section II. of Attatchment 1, Plant Barrier Impairment Permit. 3. Determine that a hourly fire watch must be initiated and document on Attatchment 1, Plant Barrier Impairment Permi | ||
: t. Also identify the correct Detection Zones and Fire Zones to be watched. 4. Complete sections III. and IV. of Attatchment 1, Plant Barrier Impairment Permit to authorize the PBI. CRITICAL ELEMENTS: (*) 2, 3 APPROXIMATE COMPLETION TIME: 20 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 6 RECORD START TIME ________ | : t. Also identify the correct Detection Zones and Fire Zones to be watched. 4. Complete sections III. and IV. of Attatchment 1, Plant Barrier Impairment Permit to authorize the PBI. CRITICAL ELEMENTS: (*) 2, 3 APPROXIMATE COMPLETION TIME: 20 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 6 RECORD START TIME ________ | ||
: 1. Refer to CC-AA-201, Plant Barrier Control Program. Note: Applicant may refer to BAP 1100-3, PBI Program for guidance. | : 1. Refer to CC-AA-201, Plant Barrier Control Program. Note: Applicant may refer to BAP 1100-3, PBI Program for guidance. | ||
Note: Applicant should refer to BAP 1100-3A3, Pre-Evaluated Plant Barrier Matrix. | Note: Applicant should refer to BAP 1100-3A3, Pre-Evaluated Plant Barrier Matrix. | ||
Revision as of 19:48, 11 July 2019
| ML092180326 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 05/19/2008 |
| From: | NRC/RGN-III/DNMS/MLB |
| To: | |
| References | |
| Download: ML092180326 (46) | |
Text
JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit 1 Admin NSO.
- 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak.
- 3. You have been ordered to perform a manual Steam Generat or Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1.
INITIATING CUES:
- 1. Complete step F.2, of 1BOSR SG
-1, Steam Generator Pr imary to Secondary Leakage Estimation.
JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit 1 Admin NSO.
- 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak.
- 3. You have been ordered to perform a manual Steam Gener ator Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1.
INITIATING CUES:
- 1. Complete step F.2, of 1BOSR SG-1 , Steam Generator Pr imary to Secondary Leakage Estimation.
JOB PERFORMANCE MEASURE TASK TITLE: Manually Calculate SG primary to secondary Leak rate. JPM No.: Admin-1(RO)
TPO No: 8E.AM-102 K&A No.: 2.1.33 K&A IMP: 3.4 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________ EVALUATION METHOD: PERFORM______ SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR___
X__ MATERIALS:
- 1. Copy of 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation GENERAL
REFERENCES:
- 1. Byron Technical Specifications
- 2. Byron Tec hnical Specification Bases 3. 1BOA SEC-1, SG Tube Leak TASK STANDARDS:
- 1. Determine Pr imary to Secondary Leakage per step F.2 of 1BOSR SG-1. 2. Request Chemistry to initiate sampling per BCP 300-9 TASK CONDITIONS: 1. You are the Unit 1 Admin NSO.
- 2. Unit 1 has a suspected primary to secondary leak in progress and the Unit Supervisor has entered 1BOA SEC-8, SG Tube Leak. 3. You have been ordered to preform a manual Steam Generator Pr imary to Secondary Leakage Estimation calculation pe r step F.2 of 1BOSR SG-1.
INITIATING CUES:
- 1. Complete 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation. CRITICAL ELEMENTS: (*) 2.b, 2.c & 2.g
APPROXIMATE COMPLETION TIME: 30 minutes Performance Checklist Standard Sat Unsat N/A RECORD START TIME ________
- 1. Review Prerequisites, Precautions, & Limitations and Actions.
Cue: When asked, inform applicant that Chemistry has been NOTIFIED to initiate sampling per BCP 300-9 Cue: When asked for SJAE readings and Chemistry Dept. printout of
most current RCS Gas Grab sample
results provide sample result
printout *2. Record SJAE Rad Monitor 1PR27J reading
from the RM-11 or Point History (PR0094) in step 2.a on data sheet D2.
- 3. Record individual SJAE flow readings from shiftly dailies or local readings
from NLO.
- 4. Request Chem Dept RCS Gas Grab sample result
printout.
- 5. Record weighted mean decay corrected activities
from RCS Gas sample
printout on data sheet D2.
Review Prerequisites, Precautions, & Limitations and
Actions.
Detemine SJAE Rad Monitor reading on 1PR27J. 2.3E-05 Ci/ml 1A SJAE reading is 18 scfm 1B SJAE reading is 16 scfm for a
total of 34 scfm.
Request Grab Sample printout from Chem Dept.
Record weighted mean decay corrected activities from RCS
Gas sample printout on data
sheet D2.
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ __
Performance Checklist Standard Sat Unsat N/A *6. Multiply Grab sample values by corrected RCS Activities for each isotope
on data sheet D2.
sheet D2 Cue: No NEW grab samples are
available.
- 8. Calculate Estimated Leak Rate using SJAE 1PR27J
activity, SJAE flow and
Total RCS Activity.
Multiply Grab sample values by
corrected RCS Activities.
Calculate Total RCS Activity
Calculate Estimated Leak Rate using SJAE 1PR27J activity, SJAE flow and Total RCS
Activity.
___ ___ ___
___ ___ ___
___ ___ ___
THAT COMPLETES THIS JPM.
RECORD STOP TIME ________
COMMENTS: ____________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
______________
________________________
__________________________________________________
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit Supervisor.
- 2. Unit 1 is currently in a refuel outage with fuel movement in-progress.
- 3. The Unit 1 assist NSO has just info rmed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed.
- 4. 1BOA INST-1, Attachment C, has been completed through step 6.b.
INITIATING CUES:
- 1. Perform applicable steps of 1BOA INST-1 and complete required paper work.
Page 2 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit Supervisor.
- 2. Unit 1 is currently in a refuel outage with fuel movement in-progress.
- 3. The Unit 1 assist NSO has just info rmed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed.
- 4. 1BOA INST-1, Attachment C, has been completed through step 6.b.
INITIATING CUES:
- 1. Perform applicable steps of 1BOA INST-1 and complete required paper work.
Page 3 of 5JOB PERFORMANCE MEASURE TASK TITLE: Initiate 1BOL 9.3 for failed s ource range detector.
JPM No.: Admin-1(SROa)
TPO No: 8E.AM-102 K&A No.: 2.1.12 K&A IMP: 4.0 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR______
MATERIALS:
- 1. Copy of Byron Technical Specifications and Bases
- 2. 1BOL 9.3, LCOAR Nuclear Instrumentation
GENERAL
REFERENCES:
- 1. Byron Technical Specifications
- 2. Byron Technical Specification Bases
- 3. 1BOL 9.3, LCOAR Nuclear Instrumentation
TASK STANDARDS:
- 1. Determine Technical Specification requirements
- 2. Complete 1BOL 9.3, LCOAR Nuclear Instrumentation
TASK CONDITIONS:
- 1. You are the Unit Superviosr.
- 2. Unit 1 is currently in a refuel outage with fuel movement in-progress. 3. The Unit 1 assist NSO has just inform ed you that the N-31 source range monitor has failed low and he thinks the source range detector has failed.
INITIATING CUES:
Determine what actions are required and complete the necessary paper work.
CRITICAL ELEMENTS: (*) 3 & 4
APPROXIMATE COMPLETION TIME: 10 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________
- 1. Refer to 1BOA INST-1 Nuclear Inst Malfunction Unit 1.
REVIEW 1BOA INST-1
___ ___ ____
- 2. Refer to Byron Tech Spec's.
- 3. Determine that Tech Spec 3.9.3 applies.
- 4. Complete 1BOL 9.3, LCOAR Nuclear Instrumentation LOCATE and OPEN Byron Tech Spec 3.9.3 From the Initial Cue
Find and Complete 1BOL 9.3, LCOAR Nuclear Instrumentation (See Answer Key)
___ ___ ___
___ ___ ___
___ ___ ___
RECORD STOP TIME ________
Performance Checklist Standard Sat Unsat N/A Page 5 of 5 COMMENTS:
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Page 1 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are an Extra NSO on shift.
- 2. Unit 1 is currently in at 100% reactor power.
- 3. Passport is currently unavail able to write Clearance Orders.
- 4. The Unit 1 Unit Supervisor requests that you write a Clearance Order for the 1A CV pump by hand.
INITIATING CUES:
The Unit Supervisor requests that you hand-write a Clearance Order for the Unit 1A CV pump
so that Maintenance can r eplace its outboard pump seal.
Page 2 of 5 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are an Extra NSO on shift.
- 2. Unit 1 is currently in at 100% reactor power.
- 3. Passport is currently unavail able to write Clearance Orders.
- 4. The Unit 1 Unit Supervisor requests that you write a Clearance Order for the 1A CV pump by hand.
INITIATING CUES:
The Unit Supervisor requests that you hand-write a Clearance Order for the Unit 1A CV pump
so that Maintenance can r eplace its outboard pump seal.
Page 3 of 5JOB PERFORMANCE MEASURE TASK TITLE: Review hand written Clearance Order for Unit-1A CV Pump. JPM No.: Admin-2(RO)
TPO No: K&A No.: 2.2.13 K&A IMP: 3.6 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR______
MATERIALS:
- 1. OP-AA-109-101 Attachment 14, Part 1
- 2. Electrical and Mechanical Prints
GENERAL
REFERENCES:
- 1. OP-AA-109-101, Clearance and Tagging
- 2. P&ID M-64 sheets 3a, 4b
- 3. CV Electrical Prints 6E-1-4030CV01, CV04, and CV16
TASK STANDARDS:
- 1. Determine the isolation points to hang a Clearance Order on the 1CV01PA pump. 2. Provide an adequate zone of protection to allow a pump seal replacement.
TASK CONDITIONS:
- 1. You are an Extra NSO on shift.
- 2. Unit 1 is currently in at 100% reactor power.
- 3. Passport is currently unavail able to write Clearance Orders.
- 4. The Unit 1 Unit Supervisor requests that y ou write a Clearance Order for the 1A CV pump by hand. INITIATING CUES:
The Unit Supervisor requests that you hand-write a Clearance Order for the Unit 1A CV pump
so that Maintenance can r eplace its outboard pump seal.
CRITICAL ELEMENTS: (*) 2, 3 & 4 APPROXIMATE COMPLETION TIME: 15 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________
- 1. Perform Hand Written C/O for 1A CV Pp seal replacement.
Perform C/O for 1A CV Pp
___ ___ ___
- 2. Determine 1CV01PA Breaker Danger Tagged Racked Out (R/O). *3. Determine Discharge, Recirculation, and Suction isolation valves are CLOSED to
isolate the pump.
- 4. Determine the correct hang order for the hand written C/O Note: The applicant will identify control switches, fuses, vent and drain valves, etc. on this Clearance Order. However, the Critical Tasks will be to identify the listed electrical
and mechanical isolation
points for personnel
protection and the correct
hang order.
RECORD STOP TIME ________
Determines Pump Breaker must be Danger tagged in the Racked
Out position.
Determines Discharge, Recirculation, and Suction
isolation valves are CLOSED to
isolate pump.
- 1. MCB Control Switch
- 2. Pump Breaker Fuses
- 3. Pump Breaker
- 4. Discharge Valve
- 5. Recirc Valve
- 6. Suction Valve
___ ___ ___
___ ___ ___
___ ___ ___
Performance Checklist Standard Sat Unsat N/A Page 5 of 5
JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit Supervisor.
- 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Assist NSO to perform a manual Steam Generator Primary to Secondary Leakage Estimation calculat ion per step F.2 of 1BOSR SG-1.
- 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1.
INITIATING CUES:
- 1. Review 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation for completene ss and accurracy of results.
JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit Supervisor.
- 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Assist NSO to perform a manual Steam Generator Primary to Secondary Leakage Estimation calculati on per step F.2 of 1BOSR SG-1.
- 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1.
INITIATING CUES:
- 1. Review 1BOSR SG-1, Steam Gener ator Primary to Secondary Leakage Estimation for completene ss and accurracy of results.
JOB PERFORMANCE MEASURE TASK TITLE: Review Manual Calc ulation of SG primary to secondary Leak Rate. JPM No.: Admin-2(SRO)
TPO No: 8E.AM-102 K&A No.: 2.1.33 K&A IMP: 4.0 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________ EVALUATION METHOD: PERFORM______ SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR___
X__ MATERIALS:
- 1. Copy of 1BOSR SG-1, Steam Generator Primary to Secondary Leakage Estimation GENERAL
REFERENCES:
- 1. Byron Technical Specifications
- 2. Byron Tec hnical Specification Bases TASK STANDARDS:
- 1. Determine Primary to Secondary Leakage 2. Request Chemistry to initiate sampling per BCP 300-9
TASK CONDITIONS:
- 1. You are the Unit Supervisor.
- 2. Unit 1 has a suspected primary to secondary leak in progress. You have ordered the Unit 1 Admin NSO to preform a manual Steam Generator Pr imary to Secondary Leakage Estimation calculation pe r step F.2 of 1BOSR SG-1. 3. The Unit 1 Admin NSO has just completed step F.2 of 1BOSR SG-1.
INITIATING CUES:
- 1. Review 1BOSR SG-1, Steam Generator Primary to Sec ondary Leakage Estimation for completeness and accurracy of results. CRITICAL ELEMENTS: (*) 2, 3 & 4
APPROXIMATE COMPLETION TIME: 10 minutes Performance Checklist Standard Sat Unsat N/A RECORD START TIME ________
- 1. Review SJAE Rad Monitor 1PR27J reading on data D2.
- 2. Determine Total SJAE flow in step 2.b is
calculated incorrectly.
- 3. Determine Kr-87 & Xe-133 were not transferred
correctly from the Chem
Dept printout.
- 4. Determine the Estimated Leak Rate is incorrectly calculated.
Determine 1PR27J Rad Monitor reading was recorded correctly.
Detemine total SJAE flow reading of 44 scfm is incorrect.
Total SJAE flow should be 34
scfm. Kr-87 & Xe-133 activity were transferred from the Chem.
Dept. printout incorrectly. U-2 data was inadvertently
transferred.
Determine the Estimated Leak Rate is incorrectly calculated.
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
Cue: This JPM is completed.
RECORD STOP TIME ____
________ COMMENTS:
________________________
_____________________
______________________________
________________________
_____________________
______________________________
________________________
_____________________
______________________________
________________________
_____________________
______________________________
1 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are an Assist NSO.
- 2. Both Units are in Mode 1, Steady State Power.
- 3. Chemistry Department has informed the Control Room that the activity in the 0A gas decay tank (GDT) has been measured at 8.68 x 10 4 curies. INITIATING CUES:
The Unit Supervisor directs you to take acti on to reduce activity level in the 0A GDT per 0BOA RAD-3, DECAY TANK HIGH ACTIVITY , while the Shift Manager evaluates for Emergency Action Levels.
JOB PERFORMANCE MEASURE Rev 0, 5/6/2003 TASK TITLE: Respond to GDT High Activity JPM No.: Admin-3(RO)
TPO No: NA K&A No.: 2.3.10 K&A IMP. 2.9/3.3 TRAINEE:_______________________________
DATE: ___/___/___
The Trainee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR______
MATERIALS:
0BOA RAD-3, Decay Tank High Activity.
Calculator
GENERAL
REFERENCES:
0BOA RAD-3, Decay Tank High Activity.(Rev 51)
TASK STANDARDS:
Correctly calculate the pressure required in the 0A GDT to reduce activity level to within limits.
TASK CONDITIONS:
- 1. You are an Assist NSO.
- 2. Both Units are in Mode 1, Steady State Power.
- 3. Chemistry Department has informed the Control Room that the activity in the 0A gas decay tank (GDT) has been measured at 8.68 x 10 4 curies. INITIATING CUES:
The Unit Supervisor directs you to take acti on to reduce activity level in the 0A GDT per 0BOA RAD-3, DECAY TANK HIGH ACTIVITY , while the Shift Manager evaluates for Emergency Action Levels.
CRITICAL ELEMENTS: (*)
3 and 4 APPROXIMATE COMPLETION TIME:
10 Minutes PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 3 RECORD START TIME________
- 1. Refer to 0BOA RAD-3 for directionNote: Provide copy of BOA RAD-3 as necessary.
Locate a copy of 0BOA RAD-3, Decay Tank High Activity. 2. Suspend radioactive additions to the OA GDT. Cue: 0A GDT is still IN SERVICE Cue: 0D GDT is being placed in service per BOP GW-6.
Cue: (if asked) 0D GDT is now in service. Suspend radioactive additions to the OA GDT by
contacting RWP operator:
Determine status of 0A GDT
Direct RWP operator to place another GDT in service per BOP GW-6.
- 3. Calculate pressure at which OA GDT activity levels will be
acceptable.
CUE: 0A tank pressure is currently 88 psig Cue: 0D GDT is now in service.
Determines required pressure, per Attachment
A of 0BOA RAD-3, to be
- 44.33 psig (44 to 45 psig). Value calculated:
________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 4 *4. Transfers 0A GDT contents to reduce pressure to within calculated limit.
CUE: RWP operator notified. 0A GDT has been reduced by transferring contents to the 0C
GDT. 0A tank pressure now
indicates (40 psig).
Directs RWP operator to transfer 0A GDT to another GDT IAW BOP
GW-7 until pressure is
less (calculated value)
psig. 5. Verify GDT activity acceptable.
Cue: 0A and 0C GDTs have been sampled and activity in each is
< 5 X 10 4 CURIES. Requests samples to verify <
5 X 10 4 CURIES in: OA GDT OC GDT. 6. Affected GDTs placed in storage.
CUE: RWP panel operator informed and acknowledges direction.
Directs RWP operator to place OA (and OC) GDTs in storage per BOP GW-
- 6. 7. Refer to Tech Specs Cue: The Unit Supervisor will perform Tech Spec evaluation. Refers to Tech Specs Note: Once candidate determines
'returning to procedure and step in effect' is applicable: Cue: This JPM is complete.
RECORD STOP TIME________
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 5 COMMENTS:
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 6 CALCULATION
103 psi 2. Plim = 103 x (5 x 10 4 curies) Plim =
59.33 psi 8.68 x 10 4 curies 3. Indicated Pressure equivalent to Plim = 59.33 - 15 =
44.33 Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit Supervisor.
- 2. Unit 1 is currently at 100% reactor power.
- 3. Passport is currently unavail able to write Clearance Orders.
- 4. The Unit 1 assist NSO has just comple ted writing a Clearance Order for the Unit 1A CV pump by hand.
INITIATING CUES:
- 1. Review and approve the hand written Clear ance Order for the Unit 1A CV pump.
Page 2 of 4 JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Unit Supervisor.
- 2. Unit 1 is currently at 100% reactor power.
- 3. Passport is currently unavail able to write Clearance Orders.
- 4. The Unit 1 assist NSO has just comple ted writing a Clearance Order for the Unit 1A CV pump by hand.
INITIATING CUES:
- 1. Review and approve the hand written Clear ance Order for the Unit 1A CV pump.
Page 3 of 4 JOB PERFORMANCE MEASURE TASK TITLE: Review hand written Clearance Order for Unit-1A CV Pump. JPM No.: Admin-1(SROc)
TPO No: K&A No.: 2.2.13 K&A IMP: 3.8 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________
EVALUATION METHOD:
PERFORM______
SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR______
MATERIALS:
- 1. Copy of Hand Written Clearance Order
- 2. Marked up Electrical and Mechanical Prints
GENERAL
REFERENCES:
- 1. OP-AA-109-101, Clearance and Tagging
- 2. P&ID M-64 sheets 3a; 4b
- 3. CV Electrical Prints 1-4030CV01; CV04; CV16 TASK STANDARDS:
- 1. Determine that Clearance Order c ontains several flaws and needs to be re-worked. 2. Do not approve / sign Clearance Order
TASK CONDITIONS:
- 1. You are the Unit Superviosr.
- 2. Unit 1 is currently in at 100% reactor power.
- 3. Passport is currently unavail able to write Clearance Orders.
- 4. The Unit 1 assist NSO has just complet ed writing a Clearance Order for the Unit 1A CV pump by hand.
INITIATING CUES:
Review and approve the hand written Clearanc e Order for the Unit 1A CV pump.
CRITICAL ELEMENTS: (*) 2, 3 & 4 APPROXIMATE COMPLETION TIME: 15 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 4 RECORD START TIME ________
- 1. Refer to Hand Written C/O for 1A CV Pp.
Review C/O for 1A CV Pp
___ ___ ___
Evaluator's Note: The examinee may also identify a Danger Card to be hung on 1CV8111 handwheel, which is not required, but is not an error.
- 2. Determine Aux Oil Pp Breaker not Danger Tagged.
- 3. Determine discharge check valve being used for isolation.
This is prohibited per C/O
procedure.
- 4. Determine that no vent valve is opened to facilitate draining.
RECORD STOP TIME ________
Omitted from C/O - Determines Breaker must be Danger
tagged. Determines Discharge Check Vlv should be replaced with
Discharge Isolation Vlv
1CV8584. Determines that no vent path established to facilitate
draining.
___ ___ ___
___ ___ ___
___ ___ ___
Comments:
Task Conditions:
- 1. You are the Unit 1 Assist NSO
- 2. Unit 1 is currently operating at 100% power with all systems in automatic control.
Initiating Cue:
Task Conditions:
- 1. You are the Unit 1 Assist NSO
- 2. Unit 1 is currently operating at 100% power with all systems in automatic control.
Initiating Cue:
Job Performance Measure Task Title: Respond to Turbine Bldg. fire alarm. JPM No. Admin-4(RO)
TPO No.: K/A No.: 2.4.25 K/A Imp: 3.3
Examinee:_____________________________ Da te: ________________
PASSED ________ Time Started: __________
FAILED _________ Time Finished: _________
Location: In Plant _________ Simulator: ____________
Materials:
- 1. BAP 1100-10, Response Procedure for Fire
- 2. BAR 1PM09J-E17, U1 Turbi ne Bldg Mezz. Floor 426' (1D-37)
- 3. BOP FR-1, Fire Response Guidelines
General
References:
- 1. BAP 1100-10, Response Procedure for Fire
- 2. BAR 1PM09J-E17, U1 Turbi ne Bldg Mezz. Floor 426' (1D-37)
- 3. BOP FR-1, Fire Response Guidelines Task Standards:
- 1. Refer to BAR 1PM09J-E17 for Fire Alarm 1D-37
- 2. Refer to BAP 1100-10, Response Procedure for Fire
- 3. Complete Section C of BAP 1100-10
Task Conditions:
- 1. You are the Unit 1 Assist NSO
- 2. Unit 1 is at 100% power wit h all controls in Automatic
Initiating Cue:
- 1. Respond to changing plant conditions
Critical Elements:
(*) 4, 5, 6, 7
Approximate Completion Time: 10 minutes PERFORMANCE CHECKLIST
STANDARD
SAT UNSAT N/A Record Start Time_________
Note: Applicant will receive a
Turb. Bldg Fire Alarm
Note: Examiner to provide BAR 1PM09J-E7
- 1. Refer to BAR 1PM09J-E17, U1 TB 426' Mezz.
Note: The dispatched EO reports a fire near the Hydrogen Seal Oil Skid.
- 2. The U1 Assist dispatches an EO to investigate at
the location of the alarm.
- 3. U1 Assist NSO verbally notifies the Unit
Supervisor of the fire.
Cue: The Unit Supervisor acknowledges the NSO notification of fire in
turbine bldg.
Refer to BAR 1PM09J-E17
The U1 Assist dispatches an EO
to investigate at the location of
the alarm.
Notify Unit Supervisor of fire in
turbine bldg.
___ ___ ___
___ ___ ___
___ ___ ___
PERFORMANCE CHECKLIST
STANDARD
SAT UNSAT N/A
- 4. U1 Assist NSO announces the fire over
the public address
system.
- 5. U1Assist NSO announces the fire location over the radio and requests fire brigade
members to respond.
- 6. U1 Assist NSO actuates the plant fire alarm for
approximately 2 minutes Note: CO 2 or Halon systems will not actuate as a result of this fire.
- 7. U1 Assist NSO should call Rad Protection and
Security and have them
report to Fire Brigade Chief at the scene of the fire. CUE: Fire Brigade Chief notifies the control
room of fire status and
the need for offsite Fire
Department assistance and Emergency Medical
Service assistance.
- 8. U1 Assist NSO will receive radio communication from Fire
Chief on fire status and
the need for offsite
assistance. NSO will
document condition on
Byron Station Operating
Emergency Report Sheet Fire/Accident/Illness
form. NSO announces the fire over
public address system
NSO announces the fire location
over the radio and requests fire
brigade members to respond
NSO actuates the plant fire
alarm for approximately 2
minutes
NSO notifies Rad Prot. and
Security to report to fire chief at the scene
NSO documents fire conditions
and need for offsite assistance
on Byron Station Operating
Emergency Report Sheet
Fire/Accident/Illness form.
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
PERFORMANCE CHECKLIST
STANDARD
SAT UNSAT N/A
- 9. U1 Assist NSO Notifies Offsite Fire Dept. and
Emergency Medical Service by calling 911.
THAT COMPLETES THIS JPM
COMPLETION TIME: ________
Comments:
Notify Offsite Fire Dept and Emergency Medical Service
___ ___ ___
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the Field Supervisor.
- 2. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed.
- 3. You have the Liquid Release Package and it is completed up to step 8.5.
INITIATING CUES:
- 1. You are to review BCP 400-TWX01 and ensure sections 1, 2, 3, 4, 5, and 6 have been completed properly to authorize the liquid release.
Page 2 of 5 TASK CONDITIONS:
- 1. You are the Field Supervisor.
- 2. A Liquid Radwaste Release Form BCP 400-TWX01 is currently being processed.
- 3. You have the Liquid Release Package and it is completed up to step 8.5.
INITIATING CUES:
- 1. You are to review BCP 400-TWX01 and ensure sections 1, 2, 3, 4, 5, and 6 have been completed properly to authorize the liquid release.
Page 3 of 5JOB PERFORMANCE MEASURE TASK TITLE: Review Liquid Release Package and determine where four flaws are located. JPM No.: Admin-4(SRO)
TPO No: K&A No.: 2.3.6 K&A IMP: 3.1 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________ EVALUATION METHOD: PERFORM______ SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR______ MATERIALS:
- 1. BC P 400-TWX01, Rev. 53
- 2. 0BOL 11.a, Radioactive Liquid Effluent Monitoring Instrumentation
- 3. 0BRSR 11.c.1-1, Radioactive Liquid Effluents - Sh ift Manager Request - Prior to Each Liquid Release??? 4. Chemistry Sample results from 0WX01T.
- 5. Radiation Protection analysis for a Liquid Release Package. GENERAL
REFERENCES:
- 1. Byron Technical Specification
- 2. BCP 400-TWX01 TASK STANDARDS:
- 1. Determine that section 5.4 Rad Monito r Setpoints were incorrectly chosen.
- 2. Determine that the signature is missing for the Radiation Protection Supervisor in section 5.9 . 3. Determine that section 6.16.1 is incorrectly indicating the wrong release path ( 0WX001 is recorded instead of 0WX630). 4. Determine that step 6.16.10 is misssing a verification initial. CRITICAL ELEMENTS: (*) 2, 3, 4, & 5 APPROXIMATE COMPLETION TIME: 20 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 5 RECORD START TIME ________
- 1. Refer to BCP 400-TWX01, Liquid Radwaste Release Form.
- 2. Determine that the Rad Protection Supervisor did not sign step 5.9.
- 3. Determine that the Rad Monitor Setpoints are incorrect.
- 4. Determine that the NSO recorded the wrong release flow path in step 6.16.1.
- 5. Determine the verification blank for step 6.16.10 is not initialed.
RECORD STOP TIME ________
Determine procedure is completed up to step 8.5 where the Field Supervisor is to review
Release Package to ensure it is
completed properly.
STEP 5.9 The Rad Protection Supervisor signature is missing.
STEP 6.8.5 Setpoints should have been left at 1.23E-4 and
6.13E-5 NOT 7.92E-7.
STEP 6.16.1 NSO records the incorrect flow path. Should be
0WX630 NOT 0WX001.
STEP 6.16.10 The Verification Blank is not initialed for the Rad
Monitor setpoints.
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
Performance Checklist Standard Sat Unsat N/A Page 5 of 5 Comment: ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Examinee's Cue Sheet JOB PERFORMANCE MEASURE TASK CONDITIONS:
- 1. You are the WEC Supervisor.
- 2. You have just received a call that the door 0DSD351 (Turbine Bldg into the Div.
11 ESF Switchgear Room) is broken and stuck half way open.
- 3. All plant fire protection and fi re detection systems are available.
- 4. An Extra SRO will address Fire Protection LOCAR's and Fire Watch Paper Work.
INITIATING CUES:
- 1. As the WEC Supervisor initiate the PBI paper work.
Examinee's Cue Sheet TASK CONDITIONS:
- 1. You are the WEC Supervisor.
- 2. You have just received a call that the door 0DSD351 (Turbine Bldg into the Div.
11 ESF Switchgear Room) is broken and stuck half way open.
- 3. All plant fire protection and fi re detection systems are available.
- 4. An Extra SRO will address Fire Protection LOCAR's and Fire Watch Paper Work.
INITIATING CUES:
- 1. As the WEC Supervisor initiate the PBI paper work.
Page 3 of 6JOB PERFORMANCE MEASURE TASK TITLE: Complete a PBI Permit for door SD351. JPM No.: Admin-5(SRO)
TPO No: K&A No.: 2.4.25 K&A IMP: 3.4 EXAMINEE:_______________________________
DATE: ___/___/___
The Examinee:
PASSED_________ this JPM TIME STARTED: ________
FAILED __________
TIME FINISHED: ________ EVALUATION METHOD: PERFORM______ SIMULATE_______
LOCATION:
IN PLANT______
SIMULATOR______ MATERIALS:
- 1. CC-AA-201, Pl ant Barrier Control Program
- 2. BAP 1100-3, Plant Barrier Impairment (PBI) Program
- 3. BAP 1100-3A3, Pre-Evaluated Plant Barrier Matrix 4. 0BOL 10.g, LCOAR Fire Assemblies TRM LCO # 3.10.g GENERAL
REFERENCES:
- 1. Byron Technical Requirements Manual
- 2. Byr on Station Fire Plan 3. Byron Station UFSAR TASK STANDARDS:
- 1. Complete section I. of Attatchment 1, Plant Barrier Impairment Permit. 2. Determine the broken door is a Fire Barrier , Security Barrier, and a HELB barrier and complete section II. of Attatchment 1, Plant Barrier Impairment Permit. 3. Determine that a hourly fire watch must be initiated and document on Attatchment 1, Plant Barrier Impairment Permi
- t. Also identify the correct Detection Zones and Fire Zones to be watched. 4. Complete sections III. and IV. of Attatchment 1, Plant Barrier Impairment Permit to authorize the PBI. CRITICAL ELEMENTS: (*) 2, 3 APPROXIMATE COMPLETION TIME: 20 minutes Performance Checklist Standard Sat Unsat N/A Page 4 of 6 RECORD START TIME ________
- 1. Refer to CC-AA-201, Plant Barrier Control Program. Note: Applicant may refer to BAP 1100-3, PBI Program for guidance.
Note: Applicant should refer to BAP 1100-3A3, Pre-Evaluated Plant Barrier Matrix.
CUE: The next sequential PBI log number is08-100.
- 2. Complete Section I. of PBI Permit
Determine that Attachment 1, Plant Barrier Impairment Permit
needs to be filled out.
Complete Section I. of PBI Permit Component- Door from Turbine Bldg to Div. 11
ESF Switchgear Room EPN / ID - 0DSD351 Unit 1, 8 / L / 426' o Applicable Dwgs Not Critical Description of Barrier Impairment Reason for Barrier Impairment o Support of Maint Activity
- Not Critical Initiator signature and date
___ ___ ___
___ ___ ___
Performance Checklist Standard Sat Unsat N/A Page 5 of 6
- 3. Complete Section II. of PBI Permit CUE: The Extra SRO completing the Fire Protection LCOAR has determined that detection zone 1D-
78 is the affected detection zone for Fire Zone 5.2-1 and an hourly fire watch is required.
When applicant notifies security provide the following cue CUE: A Security Guard will be posted to protect the Div. 11 ESF Switchgear Room.
NOTE: Accept either YES or NO for
Vent Barrier Complete Section II. of PBI Permit Fire Barrier Applicable - Yes Compensatory Action Required - Yes Fire Watch Required - Yes Hourly Fire Detection OP Check Required - Yes Detection Zones - 1D-78 Fire Zones - 5.2-1 Security Barrier - Yes Compensatory Action Required - Yes As determined by SECURITY.
Ventilation Barrier - Yes or No per BAP 1100-3A3 Flood Barrier - No HELB Barrier - Yes Compensatory Action -
Yes Temporary HELB
barrier required per BAP
1100-3A3 Mode restrictions - No 90 day time clock
applicable? - Yes 50.59 review required? -
NO (only required if
passed 90 days)
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
Performance Checklist Standard Sat Unsat N/A Page 6 of 6
- 4. Complete Section III. of PBI Permit Sign and Date Missile Barrier - No Occupational Rad Protection - No Post LOCA Radiation EQ
- No Sign Section IV.
Permission to Impair Barrier
___ ___ ___
___ ___ ___
___ ___ ___
___ ___ ___
This Completes this JPM
Completion Time ______________
Comment: