{{Adams
#REDIRECT [[IR 05000382/2010301]]
| number = ML100420035
| issue date = 02/11/2010
| title = Notification of NRC Initial Operator Licensing Examination 05000382-10-301
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Kowalewski J
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| license number = NPF-038
| contact person =
| case reference number = 50-382/10-301
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 5
}}
See also: [[see also::IR 05000382/2010301]]
 
=Text=
{{#Wiki_filter:February 11, 2010
Joseph Kowalewski, Vice President, Operations
Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3
17265 River Road
Killona, LA  70057-3093
 
SUBJECT: WATERFORD UNIT 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000382/2010301 
Dear Mr. Kowalewski:
 
In a telephone conversation
on December 14, 2009, between Messrs.
John Signorelli, Operations Training, and Brian Larson, Chief Examiner, arrangements were made for the
validation and administration of a retake licensing examination (operating test only) at
Waterford Unit 3, during the week of March 15, 2010.
 
As agreed during the telephone conversation, your staff will prepare the exami
nation based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power
Reactors," Revision 9, S
upplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1.  The U.S. Nuclear Regulatory
 
Commission (NRC) regional office will discuss with your staff any changes
that might be necessary before the examination is administered.
 
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 29, 2010.  The operating test and supporting reference materials identified in
Attachment 3 to ES-201 will be due by February 26, 2010.  Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outli
nes and test before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examination to be rescheduled.
 
In order to conduct the
requested operating test, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation
facility available on
the dates noted above. UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Entergy Operations, Inc. - 2 -
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating test is being administered.
 
To permit timely NRC review and evaluation, your staff should submit the preliminary operator
license application (Office of Management and Budget (OMB) approval number 3150-0090),
medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB
approval number 3150-0090) at least 30 days before the examination date.  If the application is
not received at least 30 days before the examination date, a postponement may be necessary. 
The signed application certifying that all training has been completed should be submitted at
least 14 days before the examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018.  The public reporting burden for this collection of information is
estimated to average 50 hours per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information.  Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public
inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the
electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. 
Thank you for your cooper
ation in this matter.  Mr. Signorelli has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Larson at 817-860-8172 or myself at
817-860-8159.
 
      Sincerely, 
 
      /RA/
      MARK S. HAIRE, Chief Operations Branch      Division of Reactor Safety
 
Docket:  50-382
License:  NPF-38 
Entergy Operations, Inc. - 3 -
DISTRIBUTION:
John T. Herron 
Entergy Services, Inc.
President and CEO 
Nuclear Operations/CNO
P.O. Box 31995
Jackson, MS  39286-1995
 
Jeff Forbes
Senior Vice President and 
  Chief Operating Officer
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS  39286-1995
 
Thomas Palmisano
Vice President, Oversight
Entergy Operations, Inc.
P. O. Box 31995
Jackson, MS  39286-1995
 
Senior Manager, Nuclear Safety
and Licensing
Entergy Services, Inc.
P. O. Box 31995
Jackson, MS  39286-1995
 
Bob Murillo
Manager, Licensing and Regulatory Affairs
Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3
17265 River Road
Killona, LA 70057-0751
 
Kenny J. Christian, Director
Nuclear Safety Assurance
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
 
Terence A. Burke
Associate General Council 
Nuclear Entergy Services, Inc.
1340 Echelon Parkway
Jackson, MS  39213 
Entergy Operations, Inc. - 4 -Charles F. Amone General Manager, Plant Operations
Waterford 3 SES
Entergy Operations, Inc.
17265 River Road
Killona, LA  70057-0751
 
Manager, Licensing
Entergy Operations, Inc.
17265 River Road
Killona, LA  70057-0751
 
Chairman
Louisiana Public Service Commission
P. O. Box 91154
Baton Rouge, LA  70821-9154
 
Parish President Council
St. Charles Parish
P. O. Box 302
Hahnville, LA  70057
 
St. Charles Parish
Dept. of Emergency Preparedness
Emergency Operations Center
P.O. Box 302
Hahnville, LA  70057
 
Director, Nuclear Safety & Licensing
Entergy, Operations, Inc.
440 Hamilton Avenue
White Plains, NY 10601
 
Ms. Ji Wiley
Environmental Scientist Supervisor
Radiological Emergency Planning
  and Response 
Louisiana Department of 
Environmental Quality 
P. O. Box 4312
Baton Rouge, LA 70821-4312
 
Chief, Technological Hazards 
  Branch
FEMA Region VI
800 North Loop 288
Federal Regional Center
Denton, TX  76209 
Entergy Operations, Inc. - 5 -Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (      @nrc.gov)
Resident Inspector (Dean.Overland@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Kaly.Kalyanam@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
 
ML SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials BTL Publicly Avail  Yes  No Sensitive  Yes  No Sens. Type Initials BTL SOE:OB C:OB    BTLarson MSHaire    /RA/ /RA/    02/4/10 02/11/10    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
}}