ENS 54125: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 22: | Line 22: | ||
Berthold was called and arrangements have been made for them to come on site on 6/27/2019 to either repair or replace the shutter. | Berthold was called and arrangements have been made for them to come on site on 6/27/2019 to either repair or replace the shutter. | ||
The gauge is a Berthold model LB7442 with a 50 mCi Co-60 source (serial number 526-03-09). | The gauge is a Berthold model LB7442 with a 50 mCi Co-60 source (serial number 526-03-09). | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2019/20190701en.html#en54125 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Latest revision as of 07:01, 1 July 2019
Where | |
---|---|
Rayonier Advanced Materials, Llc Jesup, Georgia (NRC Region 1) | |
License number: | GA 381-1 |
Organization: | Georgia Radioactive Material Pgm |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+84.3 h3.513 days <br />0.502 weeks <br />0.115 months <br />) | |
Opened: | Shatavia Walker 16:18 Jun 20, 2019 |
NRC Officer: | Andrew Waugh |
Last Updated: | Jun 20, 2019 |
54125 - NRC Website | |