ML17285A788: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/30/1989
| issue date = 09/30/1989
| title = Monthly Operating Rept for Sept 1989 for Washington Nuclear Plant Unit 2.W/891009 Ltr
| title = Monthly Operating Rept for Sept 1989 for Washington Nuclear Plant Unit 2.W/891009 Ltr
| author name = HUTCHINSON L B, POWERS C M
| author name = Hutchinson L, Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 00:27, 19 June 2019

Monthly Operating Rept for Sept 1989 for Washington Nuclear Plant Unit 2.W/891009 Ltr
ML17285A788
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1989
From: Hutchinson L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910190082
Download: ML17285A788 (8)


Text

gC CELZ RATED Dl SBUT]ON DEMO?i STRIDOR SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8910190082 DOC.DATE: OTARIZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unzt 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHINSON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o e'ng rept for Sept 1989 for WPPS 2 Nuclear Plant.891009 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR.ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specks NOTES RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10/~DQJ PB 10 REG FILE 01 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3 3'1 10 10 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 NOIR'IO ALL'RIBS" KMIPZERIS PIZASE HELP US TO REDUCE%ASTElCGKIRCZ'IHE DOCUMENI'ONSOL DESK RjON Pl-37 (EXT.20079)KO EIJMZNATB%SR NAME ERCH DIPI%GMTZGN LISTS MR DCKXlMEHIS VXJ KH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTRŽ2D9 ENCL 29 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99362 Docket No.50-397 October.9;1989 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear.Sir,

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, September 1989 as required by our Technical Specifications 6.9.1.6.Very Truly Yours;gag.~C.M.Powers (M/D 927M)WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr.Mr.Ms.Mr.Mr..J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI;Farmington CT INPO NRC, Washington D.C.8510iVOOe2 SV0WSO PDR ADOCK 05000397 R PDC 0~~E

~~DOCKET NO.0'lIT NAl lE DATE 50-10/1/89 WIT St lUTDOl'(NS

/REDUCTIONS COlfPLETED l3Y LB HUTCHISON DEPOT PERIOD SEPT 19 898 mcnth, year TELEPI lONE-2 6 FI5.~n Xiii colin~~880H T>~TilLo 89-12 9/21/89 F 29 A 2 iZClK t t I fl'ntt HC HT EXCH-D PLANT WAS MANUALLY SHUTDOWN BECAUSE OF RAPIDLY INCREASING CONDUCTIVITY DUE TO CONDENSER TUBE.IN-LEAKAGE.

TWO DAMAGED TUBES WERE PLUGGED AND PLANT REMAINED DOWN FOR REPAIR OF STEAM EXTRACTION LINES.89-13 9/22/89 S 167.16 A HJ PIP EXX-E PLANT REMAINED DOWN FOR REPAIR/REPL'ACEMENT OF TWO FAILED STEAM EXTRACTION LINE EXPANSION:-

BELLOWS AND CONDENSER BAFFLE REPAIR.AFTER COMPLETION OF..-"REPAIR TO ALL DAMAGED COMPONENTS, THE PLANT WAS RETURNED TO SERVICE.SOf'MY WNP-2 INCURRED 1 FORCED OUTAGE WHICH WAS EXTENDED FOR REPAIR OF RELATED COMPONENTS.

TYPE F-Forced S-ched F-A dmin.G-Oper Error H-Other A-Equip Failure 0-hlaint or Test~C-Refuel.ing D-Regulatory Res triction E-Operator Training&License Examination t lETl lOO l-manual 2-manual Scratch 3-Auto Scram 4-Continued 9 Ilnducod Load 9-Other SYSTEM&COhlPOhEHT Exhibit F&H Instructions for Preparation ol'ata Entry Sheet Licensee Event Report (LiER)File (NUAEG-0161) tl~I DOCKET NO.50-397 UNIT WNP-2 DATE 10/1/89 flONTH DAY AVERAGE DAILY POWER LEVEL (MwE-Net)745 17.COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 DAY AVERAGE DAILY POWER LEVEL~(MwE-Net)1062 2.3.4.5.6.7.8.9.10.12.13.14.15.16.757 759 755 716 747 750 746~747 950 1014 1058 1061 1067 1045 1002 18.19.20.21.22.23.24.25.26.27.28.29.30.31.1062 1050 944 673 550 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a gr aph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases,.the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~>~OPERATING DATA REPORT WNP-2 Ol-Oct-89 1~DOCKET: 50-397 2 REPORTING PERIOD: 3.UTILITY CONTACT: Sep-89 OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 720 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 3323 1200.9 1100 1140 109'5 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORTs GIVE REASONS 10~POWER TO WHICH RESTRICTEDs IF ANY (NET MWe): 11.REASONS FOR RESTRICTIONSs IF ANY: 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16'NIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18-GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 720 537 5 0.0 523.8 0.0 1451765 481010 460308 72.8/72.8/58.4/58.1/5.2/29 0 YEAR CUMULATIVE 6551 42055.2 4648.7 30866.3 0.0 340.4 4474.4 29638.9 0.0 381.7 12259391 81370596 4033680 27067180 3857783 26026091 68.3/70.5/68.3/71'/53.8/56.5/53.5/56.3/6 4/9 2/304.6 2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEsDATEsDURATION)

NNE 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~~'