ML18057A845: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 04/02/1991 | | issue date = 04/02/1991 | ||
| title = Forwards 1990 Annual Rept of Facility Changes,Tests & Experiments | | title = Forwards 1990 Annual Rept of Facility Changes,Tests & Experiments | ||
| author name = | | author name = Slade G | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| addressee name = | | addressee name = | ||
Revision as of 19:41, 17 June 2019
| ML18057A845 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/02/1991 |
| From: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9104150176 | |
| Download: ML18057A845 (1) | |
Text
.. POWERING MICHIGAN'S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 April 2, 1991 Nuclear Regulatory Commission Document Control Desk .Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -* 1990 ANNUAL REPORT OF FACILITY CHANGES, TESTS AND EXPERIMENTS GB Slade General Manager This letter provides the Palisades Plant Annual Report of Changes, Tests and Experiments for calendar year 1990. This report is submitted in accordance with 10CFR50.59(b)(2).
- Attached is the listing of changes to the facility (Facility Changes, Specification Changes, Temporary Modifications and other documents) processed in 1990. The listed Safety Evaluations were prepared in support of ongoing design and approval processes; all the listed items, however, have not necessarily been installed and declared operable.
When these changes are completed, they will be included if appropriate as part of a regular FSAR revision.
-Changes to procedures are not itemized in this report because of the very . large number and because most were of little significance.
Safety Evaluations which support procedure changes are available on site for NRC review. No activities which, in the context of 10CFR50.59, are classified as tests or experiments were completed. "Ger'a d B Slade Plant General Manager CC Administrator, Region III, NRC NRC Resident Inspector
-Palisades*
Attachment 9104150176 PDR ADOCK 6§066255 R . PDR *-' 1*: ** *.I '.,,:*,::J A C11S ENERGY COMPANV 1. I