ML100680330: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 24: Line 24:


==Subject:==
==Subject:==
(NOTE:  This will be used as the  Documents Title in ADAMS)
(NOTE:  This will be used as the  Documents Title in ADAMS)
Information for EA 09:15  I spoke with Mr. DiMeglio about the age of the reactor and the building it is in. He stated that he would review documents and speak with people in Headquarters to determine when the two structures were built. He would contact the WSU RSO if the information was not readily available. 09:45  Mr. DiMeglio called and stated he believed that a request to the licensee about the age of the structures would require an additional RAI. He would touch base with his contacts to confirm whether a phone call is appropriate. The reactor was originally licensed in March of 1961 but does no documentation as to whether Dodgen research Facility predates the reactor is on docket. 10:00  Mr. DiMeglio called to confirm that a phone call conference with the WSU RSO would be appropriate. He asked me for times that I would be available and stated he would set up the time.
Information for EA 09:15  I spoke with Mr. DiMeglio about the age of the reactor and the building it is in. He stated that he would review documents and speak with people in Headquarters to determine when the two structures were built. He would contact the WSU RSO if the information was not readily available. 09:45  Mr. DiMeglio called and stated he believed that a request to the licensee about the age of the structures would require an additional RAI. He would touch base with his contacts to confirm whether a phone call is appropriate. The reactor was originally licensed in March of 1961 but does no documentation as to whether Dodgen research Facility predates the reactor is on docket. 10:00  Mr. DiMeglio called to confirm that a phone call conference with the WSU RSO would be appropriate. He asked me for times that I would be available and stated he would set up the time.
Action Required:  Place in ADAMS Document Availability:
Action Required:  Place in ADAMS Document Availability:

Revision as of 05:40, 1 May 2019

Washington State University, Telephone Record Dtd 3/9/2010, Subj: Information for EA
ML100680330
Person / Time
Site: Washington State University
Issue date: 03/09/2010
From: Courtemanche S R
NRC/RGN-I/DNMS/CRDB
To: DiMeglio A F
Washington State Univ
References
Download: ML100680330 (1)


Text

U.S. NUCLEAR REGULATORY COMMISSION TELEPHONE CONVERSATION RECORD Date: March 9, 2010 Time: Various Mail Control or Report No(s).

N/A License No(s).

R-76 Docket No(s).

050-00027 Name of Licensee:

Washington State University Name of Participant(s):

Francis DiMeglio, Project Manager (NRC) Steven R. Courtemanche, Health Physicist NRC RI Telephone No.

301-415-0894, 610-337-5075,

Subject:

(NOTE: This will be used as the Documents Title in ADAMS)

Information for EA 09:15 I spoke with Mr. DiMeglio about the age of the reactor and the building it is in. He stated that he would review documents and speak with people in Headquarters to determine when the two structures were built. He would contact the WSU RSO if the information was not readily available. 09:45 Mr. DiMeglio called and stated he believed that a request to the licensee about the age of the structures would require an additional RAI. He would touch base with his contacts to confirm whether a phone call is appropriate. The reactor was originally licensed in March of 1961 but does no documentation as to whether Dodgen research Facility predates the reactor is on docket. 10:00 Mr. DiMeglio called to confirm that a phone call conference with the WSU RSO would be appropriate. He asked me for times that I would be available and stated he would set up the time.

Action Required: Place in ADAMS Document Availability:

X Publicly Available Non-Publicly Available X Non-Sensitive Non-Sensitive Copyright Sensitive- Proprietary Sensitive - Privacy Act (includes PII)

Sensitive - Internal Sensitive - Security-Related Immediate Release Normal Release Date: 3/17/2010 Delayed Release Date:

SUNSI Review Completed By: Steven R. Courtemanche

/ RA / Document Accession #: ML1006800330