ML100740655: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 24: | Line 24: | ||
==Subject:== | ==Subject:== | ||
(NOTE: This will be used as the Documents Title in ADAMS) | |||
Information for EA 15:00 I was part of a conference call with the above, save Dr. Brooks. Mr. Wall stated that the reactor and some office/laboratory space was built between 1957 and 1960. The remainder of the Dodgen Research Facility consisting of more office and laboratory space was built in 1971. Mr. Wall would perform some more research as to the exact end dates of the construction. I thanked Mr. Wall for the information. 15:15 Dr. Brooks was not at her desk and I left a voice-mail message for her to get back in touch with me. 17:55 Dr. Brooks returned my call and left a voice-mail message. She would be in the office about 2 p.m. EST after a doctor's appointment. If we were unable to connect on 3/11, the office would be closed 3/12. 3/11 14:30/15:15/17:00 Attempted to contact Dr. Brooks. 3/15 11:30 I spoke with Dr. Brooks. She indicated that, in order for her agency to do a "106" review, she would need to receive a request from the NRC in writing. The letter should be addressed to Greg Griffith. I thanked her for her time. | Information for EA 15:00 I was part of a conference call with the above, save Dr. Brooks. Mr. Wall stated that the reactor and some office/laboratory space was built between 1957 and 1960. The remainder of the Dodgen Research Facility consisting of more office and laboratory space was built in 1971. Mr. Wall would perform some more research as to the exact end dates of the construction. I thanked Mr. Wall for the information. 15:15 Dr. Brooks was not at her desk and I left a voice-mail message for her to get back in touch with me. 17:55 Dr. Brooks returned my call and left a voice-mail message. She would be in the office about 2 p.m. EST after a doctor's appointment. If we were unable to connect on 3/11, the office would be closed 3/12. 3/11 14:30/15:15/17:00 Attempted to contact Dr. Brooks. 3/15 11:30 I spoke with Dr. Brooks. She indicated that, in order for her agency to do a "106" review, she would need to receive a request from the NRC in writing. The letter should be addressed to Greg Griffith. I thanked her for her time. | ||
Action Required: Place in ADAMS Document Availability: | Action Required: Place in ADAMS Document Availability: |
Revision as of 04:28, 1 May 2019
ML100740655 | |
Person / Time | |
---|---|
Site: | Washington State University |
Issue date: | 03/15/2010 |
From: | Courtemanche S R NRC/RGN-I/DNMS/CRDB |
To: | Brooks A, DiMeglio A F, Wall D State of WA, Dept of Archaeology & Historic Preservation, Washington State Univ |
References | |
Download: ML100740655 (1) | |
Text
U.S. NUCLEAR REGULATORY COMMISSION TELEPHONE CONVERSATION RECORD Date: \ March 10, 11 and 15, 2010 Time: Various Mail Control or Report No(s).
N/A License No(s).
R-76 Docket No(s).
050-00027 Name of Licensee:
Washington State University Name of Participant(s):
Francis DiMeglio, Project Manager NRC Steven R. Courtemanche, Health Physicist NRC RI Donald Wall, Radiation Safety Officer Washington State University Allison Brooks, Ph.D., State Historical Preservation Officer Washington Telephone No.
301-415-0894, 610-337-5075, 509-335-8916, 360-586-3065
Subject:
(NOTE: This will be used as the Documents Title in ADAMS)
Information for EA 15:00 I was part of a conference call with the above, save Dr. Brooks. Mr. Wall stated that the reactor and some office/laboratory space was built between 1957 and 1960. The remainder of the Dodgen Research Facility consisting of more office and laboratory space was built in 1971. Mr. Wall would perform some more research as to the exact end dates of the construction. I thanked Mr. Wall for the information. 15:15 Dr. Brooks was not at her desk and I left a voice-mail message for her to get back in touch with me. 17:55 Dr. Brooks returned my call and left a voice-mail message. She would be in the office about 2 p.m. EST after a doctor's appointment. If we were unable to connect on 3/11, the office would be closed 3/12. 3/11 14:30/15:15/17:00 Attempted to contact Dr. Brooks. 3/15 11:30 I spoke with Dr. Brooks. She indicated that, in order for her agency to do a "106" review, she would need to receive a request from the NRC in writing. The letter should be addressed to Greg Griffith. I thanked her for her time.
Action Required: Place in ADAMS Document Availability:
X Publicly Available Non-Publicly Available X Non-Sensitive Non-Sensitive Copyright Sensitive- Proprietary Sensitive - Privacy Act (includes PII)
Sensitive - Internal Sensitive - Security-Related Immediate Release Normal Release Date: 3/23/2010 Delayed Release Date:
SUNSI Review Completed By: Steven R. Courtemanche
/ RA / Document Accession #: ML100740655