{{Adams
#REDIRECT [[NL-12-032, Entergy Pre-Filed Hearing Exhibit ENT000381, NL-12-032, Letter from F. Dacimo, Entergy, to NRC, Correction to Previous Response Regarding Unit 1 Buried Piping (Jan. 30 2012)]]
| number = ML12090A668
| issue date = 01/30/2012
| title = Entergy Pre-Filed Hearing Exhibit ENT000381, NL-12-032, Letter from F. Dacimo, Entergy, to NRC, Correction to Previous Response Regarding Unit 1 Buried Piping (Jan. 30 2012)
| author name =
| author affiliation = Entergy Nuclear Northeast
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000247, 05000286
| license number = DPR-026, DPR-064
| contact person = SECY RAS
| case reference number = RAS 22150, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, NL-12-032
| package number = ML12090A648
| document type = Legal-Pre-Filed Exhibits
| page count = 2
}}
 
=Text=
{{#Wiki_filter:ENT000381 Submitted:
March 30 , 2012 ---Entergy: Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P,O, Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 NL-12-032 January 30, 2012 Fred Dacimo Vice President Operations License Renewal U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
 
==SUBJECT:==
 
==REFERENCE:==
 
==Dear Sir or Madam:==
Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 Docket Nos. 50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64 1. NRC Letter dated December 30, 2008, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application
-Miscellaneous Items" 2. Entergy letter (NL-09-018)," Reply to Request for Additional Information
-Miscellaneous Items," dated January 27,2009 3. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application
-Offsite Power, Refueling Cavity, and Unit 2 auxiliary Feedwater Pump Room Fire Event" 4. Entergy letter (NL-09-079)," Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event," dated June 12, 2009 Entergy Nuclear Operations, Inc is providing a correction, as shown in Attachment 1 and Attachment 2, the response provided references 2 and 4 for license renewal application 1 Entergy an to Reference 2 added components to the scope of license renewal for the auxiliary feedwater pump room fire event Reference 4 provided additional information on aging management review results for added components. In these RAI's, the portion of the Unit 1 river water system from the pump discharge to the intertie to Indian Point Unit 2 service water system was added to the scope of license renewal. The components in this portion of the river water system were added the new LRA Table 1 table identified only outdoo r as the a ENT000381 Submitted:
March 30 , 2012 ---Entergy: Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P,O, Box 249 Buchanan, NY 10511-0249 Tel (914) 254-2055 NL-12-032 January 30, 2012 Fred Dacimo Vice President Operations License Renewal U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
 
==SUBJECT:==
 
==REFERENCE:==
 
==Dear Sir or Madam:==
Correction to Previous Response Regarding Unit 1 Buried Piping Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 Docket Nos. 50-003, 50-247 and 50-286 License Nos. DPR-5, DPR-26 and DPR-64 1. NRC Letter dated December 30, 2008, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application
-Miscellaneous Items" 2. Entergy letter (NL-09-018)," Reply to Request for Additional Information
-Miscellaneous Items," dated January 27,2009 3. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Numbers 2 and 3, License Renewal Application
-Offsite Power, Refueling Cavity, and Unit 2 auxiliary Feedwater Pump Room Fire Event" 4. Entergy letter (NL-09-079)," Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event," dated June 12, 2009 Entergy Nuclear Operations, Inc is providing a correction, as shown in Attachment 1 and Attachment 2, the response provided references 2 and 4 for license renewal application 1 Entergy an to Reference 2 added components to the scope of license renewal for the auxiliary feedwater pump room fire event Reference 4 provided additional information on aging management review results for added components. In these RAI's, the portion of the Unit 1 river water system from the pump discharge to the intertie to Indian Point Unit 2 service water system was added to the scope of license renewal. The components in this portion of the river water system were added the new LRA Table 1 table identified only outdoo r as the a is buried and line items of piping and bolting with 3.4.2-5-11-IP2.
Appendix B.1.6 of the license rer water system in the list of systems containing con Tanks Inspection Program. The buried piping in 1 management review had been included and reme established in response to the industry initiative 0 If you have any questions, or require additional in at 914-254-6710.
I declare under penalty of perjury that the foregoil 3Q) 2d 1 :z-}}