NL-18-0382, Enclosure 2 - Hatch Unit 1 Cycle 29 Core Operating Limits Report Version 1.0: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 41: Line 41:
These limits apply to operation with vessel dome pressure within +/-10 psi of nominal. pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the MCPR operating limit defined in this section. 13 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 In the 3-4A and 3-48 figures, Option A scram time OLMCPRs correspond to T = 1.0, where T is determined from scram time measurements performed in accordance with Technical Specifications Surveillance Requirements 3.1.4.1 and 3.1.4.2. Option B values correspond to T = 0.0. For scram times between Option A and Option B, the rated-power OLMCPR corresponds to T. If T has not been determined, Option A limits must be used. The average scram time of the control rods, T, is defined as: = 0, OR Tave -TB , whichever is greater. where: TA = 1.08 sec (Technical Specification 3.1.4, Table 3.1.4-1, scram time limit to notch 36). I -2 = µ+ 1.65* cr* N, TB n LNi i=l where: µ = 0.822 sec (mean scram time used in the transient analysis).
These limits apply to operation with vessel dome pressure within +/-10 psi of nominal. pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the MCPR operating limit defined in this section. 13 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 In the 3-4A and 3-48 figures, Option A scram time OLMCPRs correspond to T = 1.0, where T is determined from scram time measurements performed in accordance with Technical Specifications Surveillance Requirements 3.1.4.1 and 3.1.4.2. Option B values correspond to T = 0.0. For scram times between Option A and Option B, the rated-power OLMCPR corresponds to T. If T has not been determined, Option A limits must be used. The average scram time of the control rods, T, is defined as: = 0, OR Tave -TB , whichever is greater. where: TA = 1.08 sec (Technical Specification 3.1.4, Table 3.1.4-1, scram time limit to notch 36). I -2 = µ+ 1.65* cr* N, TB n LNi i=l where: µ = 0.822 sec (mean scram time used in the transient analysis).
cr = 0.018 sec (standard deviation ofµ). NI = total number of active rods measured in Technical Specifications Surveillance Requirement 3.1.4.1. n = number of surveillance tests performed to date in the cycle. Ni = number of active control rods measured in the i 1 h surveillance test. n 2::NiTi = i=I !ave n LNi i=I where: Ti = average scram time to notch 36 of all rods in the i 1 h surveillance test. 14 Plant Hatch Unit 1 Cycle 29 . ' / ! ~** i ': Exposure Label ' . BOC MOC1 MOC2 EOR EOC Non-Proprietary Information TABLE 3-1 Exposure Definitions  
cr = 0.018 sec (standard deviation ofµ). NI = total number of active rods measured in Technical Specifications Surveillance Requirement 3.1.4.1. n = number of surveillance tests performed to date in the cycle. Ni = number of active control rods measured in the i 1 h surveillance test. n 2::NiTi = i=I !ave n LNi i=I where: Ti = average scram time to notch 36 of all rods in the i 1 h surveillance test. 14 Plant Hatch Unit 1 Cycle 29 . ' / ! ~** i ': Exposure Label ' . BOC MOC1 MOC2 EOR EOC Non-Proprietary Information TABLE 3-1 Exposure Definitions  
.,, ~. ,,, ' .. . Definition  
.,, ~. ,,, ' .. . Definition
{ Beginning of Cycle Exposure First Middle of Cycle Exposure Second Middle of Cycle Exposure, End of Rated Exposure End of Cycle Exposure 15 , ') Core Operating Limits Report Version 1.0 ',J c'>.**>* *.'.( *.* . Cycle Exposure 0 MWd/ST EOR -6500 MWd/ST EOR -4000 MWd/ST Projected exposure at end of rated power with all control rods
{ Beginning of Cycle Exposure First Middle of Cycle Exposure Second Middle of Cycle Exposure, End of Rated Exposure End of Cycle Exposure 15 , ') Core Operating Limits Report Version 1.0 ',J c'>.**>* *.'.( *.* . Cycle Exposure 0 MWd/ST EOR -6500 MWd/ST EOR -4000 MWd/ST Projected exposure at end of rated power with all control rods
* out, rated core flow, and rated feedwater temperature Exposure at cycle shutdown Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 TABLE 3-2 Power-Dependent MCPR Limit Operating Flexibility Options ,, MCPR~ from 2: 24% fo'~'45% of,Rated ~ore Power ,., ,.* ' Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Figure# System ByQ.ass System Pressure Regulator In Service 012.erable*
* out, rated core flow, and rated feedwater temperature Exposure at cycle shutdown Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 TABLE 3-2 Power-Dependent MCPR Limit Operating Flexibility Options ,, MCPR~ from 2: 24% fo'~'45% of,Rated ~ore Power ,., ,.* ' Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Figure# System ByQ.ass System Pressure Regulator In Service 012.erable*
Line 95: Line 95:
A+ B*F *Flow 30.0 s F s 50.0 50.0 < F s 60.0 60.0 < F s 90.0 90.0 < F s 100.0 F>100.0 60.0 < F s 61.2 F > 61.2 F = Percent of Rated Core Flow 60 V I TLO I / / /' I SLO I 70 80 90 100 Core Flow (% of Rated) TLOISLO A B. TLO/SLO 0.3800 0.00490 TLO/SLO -0.2100 0.01670 TLO 0.3900 0.00670 TLO 0.9300 0.00070 TLO 1.0000 0.00000 SLO 0.3900 0.00670 SLO 0.8000 0.00000 FIGURE 4-1C GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 43 110 Plant Hatch Unit 1 Cycle 29 1.1 -.:. 1.0 u ci: u... a: (!) :r: 0.9 d .. . !l! ii :;::: 0.8 :a: a: (!) :r: _J "E 0.7 CII "C C CII C. ,,,,-CII 0.6 C --/ """"" ,,,,-3: 0 I < 60% Flow I n. 0.5 I I 60% Flow I 0.4 Non-Proprietary Information  
A+ B*F *Flow 30.0 s F s 50.0 50.0 < F s 60.0 60.0 < F s 90.0 90.0 < F s 100.0 F>100.0 60.0 < F s 61.2 F > 61.2 F = Percent of Rated Core Flow 60 V I TLO I / / /' I SLO I 70 80 90 100 Core Flow (% of Rated) TLOISLO A B. TLO/SLO 0.3800 0.00490 TLO/SLO -0.2100 0.01670 TLO 0.3900 0.00670 TLO 0.9300 0.00070 TLO 1.0000 0.00000 SLO 0.3900 0.00670 SLO 0.8000 0.00000 FIGURE 4-1C GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 43 110 Plant Hatch Unit 1 Cycle 29 1.1 -.:. 1.0 u ci: u... a: (!) :r: 0.9 d .. . !l! ii :;::: 0.8 :a: a: (!) :r: _J "E 0.7 CII "C C CII C. ,,,,-CII 0.6 C --/ """"" ,,,,-3: 0 I < 60% Flow I n. 0.5 I I 60% Flow I 0.4 Non-Proprietary Information  
/ V / / I Core Operating Limits Report Version 1.0 / ,,,,,,-/ v_... << M n n M 100 Core Power(% of Rated) LHGRFACp =A+ B*P Flow Power F 60 24.0 :,; P :,; 28.0 F < 60 24.0:,; P :,; 28.0 All 28.0 < P :,; 45.0 All 45.0 < P :,; 60.0 All 60.0 < P :,; 85.0 All 85.0 < P:,; 100.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow A 0.4000 0.3400 0.4774 0.6320 0.3032 0.4800 FIGURE 4-2 *s 0.00250 0.00500 0.00524 0.00180 0.00728 0.00520 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 44 Plant Hatch Unit 1 Cycle 29 [[ Non-Proprietary Information FIGURE 4-3A Core Operating Limits Report Version 1.0 ]] GE14C LHGR Limit versus Peak Pellet Exposure 45 Plant Hatch Unit 1 Cycle 29 [[ Non-Proprietary Information FIGURE 4-38 Core Operating Limits Report Version 1.0 ]] GNF2 LHGR Limit versus Peak Pellet Exposure 46 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report . Version 1.0 5.0 OPERA TING PRESSURE LIMITS For both two loop operation (TLO) and single loop operation (SLO), reactor dome pressure must be maintained within the licensed pressure bands defined by Figure 5-1. For operation in each of these regions, the following restrictions apply: a. For Region I operation:
/ V / / I Core Operating Limits Report Version 1.0 / ,,,,,,-/ v_... << M n n M 100 Core Power(% of Rated) LHGRFACp =A+ B*P Flow Power F 60 24.0 :,; P :,; 28.0 F < 60 24.0:,; P :,; 28.0 All 28.0 < P :,; 45.0 All 45.0 < P :,; 60.0 All 60.0 < P :,; 85.0 All 85.0 < P:,; 100.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow A 0.4000 0.3400 0.4774 0.6320 0.3032 0.4800 FIGURE 4-2 *s 0.00250 0.00500 0.00524 0.00180 0.00728 0.00520 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 44 Plant Hatch Unit 1 Cycle 29 [[ Non-Proprietary Information FIGURE 4-3A Core Operating Limits Report Version 1.0 ]] GE14C LHGR Limit versus Peak Pellet Exposure 45 Plant Hatch Unit 1 Cycle 29 [[ Non-Proprietary Information FIGURE 4-38 Core Operating Limits Report Version 1.0 ]] GNF2 LHGR Limit versus Peak Pellet Exposure 46 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report . Version 1.0 5.0 OPERA TING PRESSURE LIMITS For both two loop operation (TLO) and single loop operation (SLO), reactor dome pressure must be maintained within the licensed pressure bands defined by Figure 5-1. For operation in each of these regions, the following restrictions apply: a. For Region I operation:
The core operating limits from Sections 2.0 through 4.0 are applicable.  
The core operating limits from Sections 2.0 through 4.0 are applicable.
: b. For Region II and Region Ill operation:  
: b. For Region II and Region Ill operation:
: 1) The OPRM System must be operable 2) The core operating limits from Section 2.0 are applicable  
: 1) The OPRM System must be operable 2) The core operating limits from Section 2.0 are applicable
: 3) The MFLCPR and MFLPD thermal limit ratios must remain below the maximum values determined by Table 5-1. The MFLCPR and MFLPD thermal limit ratios are defined in terms of the core operating limits defined in Section 3.0 and Section 4.0. The MFLCPR thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Critical Power Ratio (FLCPR) in the core. The FLCPR is defined for each fuel assembly in the core as: FLCPR = MCPRumit Fuel Assembly Minimum Critical Power Ratio where: MCPRumit = MCPR operating limit defined in Section 3.0 47 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 The MFLPD thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Power Density (FLPD) in the core. The FLPD is defined for each six inch axial segment of each fuel rod in the core as: where: FLPD = Peak kW/ft power generated in a fuel rod segment LHGRumit LHGRumit = LHGR operating limit defined in Section 4.0 The licensed equipment conditions for operation with dome pressures in Region 11 and Region Ill of Figure 5-1 are defined in Table 5-1. TABLE 5-1 Pressure Dependent Operating Flexibility Options . . .. ' >"tJ: :r'hermal i.JrhilRatios for. Reclt.Jced' Presstir~;c>'~eration:
: 3) The MFLCPR and MFLPD thermal limit ratios must remain below the maximum values determined by Table 5-1. The MFLCPR and MFLPD thermal limit ratios are defined in terms of the core operating limits defined in Section 3.0 and Section 4.0. The MFLCPR thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Critical Power Ratio (FLCPR) in the core. The FLCPR is defined for each fuel assembly in the core as: FLCPR = MCPRumit Fuel Assembly Minimum Critical Power Ratio where: MCPRumit = MCPR operating limit defined in Section 3.0 47 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 The MFLPD thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Power Density (FLPD) in the core. The FLPD is defined for each six inch axial segment of each fuel rod in the core as: where: FLPD = Peak kW/ft power generated in a fuel rod segment LHGRumit LHGRumit = LHGR operating limit defined in Section 4.0 The licensed equipment conditions for operation with dome pressures in Region 11 and Region Ill of Figure 5-1 are defined in Table 5-1. TABLE 5-1 Pressure Dependent Operating Flexibility Options . . .. ' >"tJ: :r'hermal i.JrhilRatios for. Reclt.Jced' Presstir~;c>'~eration:
* c, .. }* ....... :* .,' Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Table# System Byr2.ass System Pressure Regulator In Service Or2.erable*
* c, .. }* ....... :* .,' Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Table# System Byr2.ass System Pressure Regulator In Service Or2.erable*

Revision as of 18:05, 25 April 2019

Enclosure 2 - Hatch Unit 1 Cycle 29 Core Operating Limits Report Version 1.0
ML18088A195
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/26/2018
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-18-0382
Download: ML18088A195 (53)


Text

Edwin I. Hatch Nuclear Plant -Unit 1 Unit 1 Cycle 29 Core Operating Limits Report Version 1.0 Enclosure 2 Unit 1 Cycle 29 Core Operating Limits Report Version 1.0 NON-PROPRIETARY INFORMATION Non-Proprietary Information SOUTHERN NUCLEAR OPERATING COMPANY EDWIN I. HATCH NUCLEAR PLANT Unit 1 Cycle 29 CORE OPERA TING LIMITS REPORT Version 1.0 Southern Nuclear Operating Company Post Office Box 1295 Birmingham, Alabama 35242 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Edwin I. Hatch Nuclear Plant Core Operating Limits Report Version 1.0 Unit 1 Cycle 29 Core Operating Limits Report TABLE OF CONTENTS Section Title Page 1.0 Introduction 7 2.0 APLHGR Limits 9 3.0 MCPR Operating Limits 13 4.0 LHGR Limits 39 5.0 Operating Pressure Limits 47 6.0 PBDA Amplitude Setpoint 51 7.0 References 52 2 Plant Hatch Unit 1 Cycle 29 Table No. 1-1 1-2 3-1 3-2 3-3 3-4 4-1 4-2 5-1 5-2 5-3 6-1 Non-Proprietary Information Core Operating Limits Report Version 1.0 TABLES Title Page Main Turbine Bypass System Operability 7 Equipment Out of Service Limitations 8 ExposureDefin~ons 15 Power-Dependent MCPR Limit Operating Flexibility Options 16 Power-Dependent KP Multiplier Flexibility Options 16 Rated-:-Power MCPR Limit Operating Flexibility Options 17 LHGR Limits versus Peak Pellet Exposure 39 Flow-Dependent LHGR Limit Operating Flexibility Options 40 Pressure Dependent Operating Flexibility Options 48 Maximum Thermal Limit Ratios for Equipment In Service Operation 49 Maximum Thermal Limit Ratios for EOC-RPT Out of Service Operation 49 Licensed OPRM Amplitude Setpoint 51 3 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 FIGURES Figure No. Title Page 2-1A GE14C Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 10 2-18 GNF2 Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 11 2-2 APLHGR Limit Versus Average Planar Exposure 12 3-1 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 18 3-2A Power-Dependent MCPR Limit (MCPRp) versus Core Power 19 3-28 Power-Dependent MCPR Limit (MCPRp) versus Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 20 3-3A Power-Dependent MCPR Multiplier (KP) versus Core Power 21 3-38 Power-Dependent MCPR Multiplier (KP) versus Core Power (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 22 3-4A-1 TLO MCPR Limits versus Average SCRAM Time 23 3-4A-2 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 24 3-4A-3 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 2~ 3-4A-4 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable

& EOC-RPT Out of Service) 26 3-4A-5 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 27 4 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 Figure No. Title Page 3-4A-6 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 28 3-4A-7 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 29 3-4A-8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable

& EOC-RPT Out of Service) 30 3-48-1 SLO MCPR Limits versus Average SCRAM Time 31 3-48-2 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 32 3-48-3 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 33 3-48-4 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable

& EOC-RPT Out of Service) 34 3-48-5 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 35 3-48-6 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 36 3-48-7 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 37 3-48-8 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable

& EOC-RPT Out of Service) 38 5 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 Figure No. Title Page 4-1A GE14C Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 41 4-1B GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 42 4-1C GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 43 4-2 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 44 4-3A GE14C LHGR Limit versus Peak Pellet Exposure 45 4-3B GNF2 LHGR Limit versus Peak Pellet Exposure 46 5-1 Licensed Regions of Operating Dome Pressure versus Core Power 50 6 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0

1.0 INTRODUCTION

The Core Operating Limits Report (COLR) for Plant Hatch Unit 1 Cycle 29 is prepared in accordance with the requirements of Technical Specification 5.6.5. The core operating limits presented herein were developed using NRG-approved methods (References 1 through 8). Results from the reload analyses for the fuel in Unit 1 Cycle 29 are documented in References 2 through 4. GNF2 fuel limits in this report are applicable to ARMOR and Ironclad Lead Test Assemblies (References 7 and 8). The following core operating limits are included in this report: a. Average Planar Linear Heat Generation Rate (APLHGR) -Technical Specification 3.2.1 b. Minimum Critical Power Ratio (MCPR) -Technical Specification 3.2.2 c. Linear Heat Generation Rate (LHGR) -Technical Specification 3.2.3 This report includes reduced thermal limit ratios which may be used in conjunction with the standard core operating limits to all<;>w operation with dome pressure down to 40 psi below nominal. Also included in this report is the licensed scram setpoint for the Period Based Detection Algorithm (PBDA) in the Oscillation Power Range Monitor (OPRM). Based upon the reload analyses for this cycle, the following operability requirement is defined for Unit 1 operation.

TABLE 1-1 Main Turbine Bypass System Operability

',., ' Main Turbine Bypass System Operable (Technical Specification 3.7.7) " ', i ' . ,, >;:, ";' .. ,*

  • bp~raliJ!ity Requife~~nt.

,"'* At least two bypass valves mµst be operable 7 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 From a fuel thermal limits perspective, the following limitations are placed on Unit 1 operation.

TABLE 1-2 Equipment Out of Service Limitations Equipment/

Condition Limitation

  • Core Power must be s 2000 MWth Single-Loop Operation (SLO) Core Flow must be s 56% of Rated
  • OPRM System Inoperable OR Main Turbine Bypass System Inoperable Dome Pressure must be within +/-10 psi of OR nominal, as defined in Figure 5-1 Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c 8 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information

2.0. APLHGR

LIMITS (Technical Specification 3.2.1) Core Operating Limits Report Version 1.0 For both two loop operation (TLO) and single loop operation (SLO), the APLHGR limit for each six inch axial segment of each fuel assembly in the core is the applicable fuel-type-specific APLHGR limit in Figure 2-2 multiplied by the fuel-type-specific flow-dependent multiplier, MAPFACF, taken from either: a. Figure 2.-1A for GE14C fuel b. Figure 2-1 B for GNF2 fuel 9 Plant Hatch Unit 1 Cycle 29 1.00 i 0.90 0.86 .~ ii :.;::. 0.80 :i a:: (!) :i: 0.70 <( .... C: Cl> "C C: [ 0.60 Cl> Cl U:: o.50 0.40 30 I I 40 Flow TLC 30.0 s F s 61.0 F > 61.0 F;:::: 30.0 I I Non-Proprietary Information 50 SLO/TLO TLO TLO SLO I I I I I 60 161 70 Core Flow (% of Rated) .MAPFACF 0.86 1.00 0.80 I 80 F = Percent of Rated Core Flow FIGURE 2-1A I TLO SLO Core Operating Limits Report Version 1.0 I I 90 100 110 GE14C Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 10 Plant Hatch Unit 1 Cycle 29 1.0 g 0.9 ... . !!! ii 0.8 :ii: c::: C!) :i: i 0.7 c( 1: Q) "C C: [ 0.6 Q) C u::: 0.5 0.4 30 40 . *:Flow.* F;;: 30.0 F;;: 30.0 -:* .... Non-Proprietary Information I TLO I I SLO I 50 60 70 80 Core Flow(% of Rated) sLo:nn.:o ,MAPFACF TLO 1.00 SLO 0.80 F = Percent of Rated Core Flow FIGURE 2-18 Core Operating Limits Report Version 1.0 90 100 110 GNF2 Flow-Dependent APLHGR Multiplier (MAPFACF) versus Core Flow 11 Plant Hatch Unit 1 Cycle 29 ,Avera'ge

.;:GE149,, , ;* *, ,. ' , *APLHGR ; Planar, Eiposure . ' Limit; (GWd/ST) .(kW/ft) 0.00 12.82 14.51 12.82 19.13 12.82 57.61 8.00 63.50 5.00 ,Av~r~ge GNF2 *** ' '\ ';, ~, Planar APLHGR * ' . ,~ 'Exposure Limit (GWd/ST) ,'(kW/ft)*

0.00 13.78 17.15 13.78 60.78 6.87 63.50 5.50 g [ .. .E :::i 0:: C) J: ...J ll. <( 15.0 14.0 13.0 12.0 11.0 10.0 9.0 8.0 7.0 6.0 5.0 4.0 Non-Proprietary Information Core Operating Limits Report Version 1.0 ' '" N I GNF2 I -j GE14C : , .. ' \ ' 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 60.0 65.0 Average Planar Exposure (GWd/ST) FIGURE 2-2 APLHGR Limit Versus Average Planar Exposure 12 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 3.0 MCPR OPERATING LIMITS (Technical Specification 3.2.2) The MCPR operating limits (OLMCPRs) for each fuel type are a function of core power, core flow, average scram time, number of operating recirculation loops, EOC-RPT system status, operability of the main turbine bypass system, the status of the main turbine pressure regulator system, and cycle exposure.

Cycle exposures are defined in Table 3-1. The OLMCPRs for both two loop operation (TLO) and single loop operation (SLO) are determined as follows: a. For 24% ::; core power::; 45%, the greater of either: 1) The flow-dependent MCPR limit, MCPRF, as determined by Figure 3-1, 2) The power-dependent MCPR limit, MCPRP, as determined by Table 3-2. b. For core power> 45%, the greater of either: 1) MCPRF, as determined by Figure 3-1 OR 2) The product of the power-dependent multiplier, KP, as determined by Table 3-3, and the rated-power OLMCPR, as determined by Table 3-4. These limits apply to all operating conditions with normal feedwater temperature, as well as with feedwater temperature reduction.

These limits apply to operation with vessel dome pressure within +/-10 psi of nominal. pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, operation with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the MCPR operating limit defined in this section. 13 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 In the 3-4A and 3-48 figures, Option A scram time OLMCPRs correspond to T = 1.0, where T is determined from scram time measurements performed in accordance with Technical Specifications Surveillance Requirements 3.1.4.1 and 3.1.4.2. Option B values correspond to T = 0.0. For scram times between Option A and Option B, the rated-power OLMCPR corresponds to T. If T has not been determined, Option A limits must be used. The average scram time of the control rods, T, is defined as: = 0, OR Tave -TB , whichever is greater. where: TA = 1.08 sec (Technical Specification 3.1.4, Table 3.1.4-1, scram time limit to notch 36). I -2 = µ+ 1.65* cr* N, TB n LNi i=l where: µ = 0.822 sec (mean scram time used in the transient analysis).

cr = 0.018 sec (standard deviation ofµ). NI = total number of active rods measured in Technical Specifications Surveillance Requirement 3.1.4.1. n = number of surveillance tests performed to date in the cycle. Ni = number of active control rods measured in the i 1 h surveillance test. n 2::NiTi = i=I !ave n LNi i=I where: Ti = average scram time to notch 36 of all rods in the i 1 h surveillance test. 14 Plant Hatch Unit 1 Cycle 29 . ' / ! ~** i ': Exposure Label ' . BOC MOC1 MOC2 EOR EOC Non-Proprietary Information TABLE 3-1 Exposure Definitions

.,, ~. ,,, ' .. . Definition

{ Beginning of Cycle Exposure First Middle of Cycle Exposure Second Middle of Cycle Exposure, End of Rated Exposure End of Cycle Exposure 15 , ') Core Operating Limits Report Version 1.0 ',J c'>.**>* *.'.( *.* . Cycle Exposure 0 MWd/ST EOR -6500 MWd/ST EOR -4000 MWd/ST Projected exposure at end of rated power with all control rods

  • out, rated core flow, and rated feedwater temperature Exposure at cycle shutdown Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 TABLE 3-2 Power-Dependent MCPR Limit Operating Flexibility Options ,, MCPR~ from 2: 24% fo'~'45% of,Rated ~ore Power ,., ,.* ' Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Figure# System ByQ.ass System Pressure Regulator In Service 012.erable*

System Status Yes/No Yes TLCO 3.3.13.a or b 3-2A Yes/No No TLCO 3.3.13.a or b 3-28 Yes/No Yes/No TLCO 3.3.13.c 3-28 TABLE 3-3 Power-Dependent KP iytultiplier Flexibility Options . . . .. *}t :J

.45o/o:ofRat~d ,C:OrtfF?ower

    • ,:.::, :'.:: 1?, J,,_,, Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Figure# System By12.ass System Pressure Regulator In Service OQ.erable*

System Status Yes/No Yes/No TLCO 3.3.13.a or b 3-3A Yes/No Yes/No TLCO 3.3.13.c 3-38

  • At least two bypass valves must be operable 16 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information TABLE 3-4 Core Operating Limits Report Version 1.0 Rated-Power MCPR Limit Operating Flexibility Options Rated-power OLMCPRs Figure# Equipment In/Out of Service TLO SLO Equipment In Service 3-4A-1 3-48-1 Main Turbine Bypass System Inoperable 3-4A-2 3-48-2 EOC-RPT Out of Service 3-4A-3 3-48-3 Main Turbine Bypass AND EOC-RPT Out of Service 3-4A-4 3-48-4 System Inoperable Main Turbine Pressure Regulator System Status 3-4A-5 3-48-5 in TLCO 3.3.13.c Main Turbine Bypass 3-4A-6 3-48-6 System Inoperable Main Turbine Pressure EOC-RPT Out of Service 3-4A-7 3-48-7 Regulator System Status AND in TLCO 3.3.13.c Main Turbine Bypass System Inoperable 3-4A-8 3-48-8 AND EOC-RPT Out of Service 17 Plant Hatch Unit 1 Cycle 29 'u: IX a. u .... . E :J IX a. u :il: .... C G> "C C G> C. G> C 0 U: 1.6 1.5 " 1.4 1.3 1.2 1.1 30 40 50 Non-Proprietary Information

' .... 60 70 80 Core Flow (% of Rated) MCPRF(TLO) = A+ B*F MCPRF(SLO) = MCPRF(TLO) + 0.04 Flow A 8 30.0:,; F:,; 80.2 1.7287 -0.00597 80.2 < F:,; 110.0 1.2500 0.00000 F = Percent of Rated Core Flow FIGURE 3-1 Core Operating Limits Report Version 1.0 90 100 110 Flow-Dependent MCPR Limit (MCPRF) versus Core Flow 18 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information 2.8 2.6 .. 0:: 2.4 .. . E :J 2.2 (.) :'iii .. C: a, 'C !il 2.0 C. a, C D. 1.8 1.6 I 60% Flow I -.............. I < 60% Flow I ........ I ~60% Flow I I < 60% Flow I 24 26 28 30 32 34 36 Core Power(% of Rated) MCPRp(TLO) = A + B*P MCPRp(SLO) = MCPRp(TLO) + 0.04 Flow Power F 60.0 24.0 s P s 28.0 F 60.0 28.0 < P s 45.0 F < 60.0 24.0 s P s 28.0 F < 60.0 28.0 < P s 45.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow A 3.3900 2.5224 2.1900 2.0153 FIGURE 3-2A 38 Core Operating Limits Report Version 1.0 -40 42 44 45 B -0.03000 -0.01294 0.00000 -0.00412 Power-Dependent MCPR Limit (MCPRP) versus Core Power 19 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 2.8 2.6 'J 2.4 .... . E :i 8: 2.2 (.) a .... C GI 'C § 2.0 C. GI C I o. 1.8 1.6 J :::60% Flow I --......... r--,....__ I < 60% Flow I -I :::60% Flow I I < 60% Flow I 24 26 28 30 32 34 36 Core Power(% of Rated) MCPRp(TLO) = A+ B*P MCPRp(SLO) = MCPRp{TLO) + 0.04 -: \' J:f1ow/" :. ;c,,i .* 1 ;\; . .:;*;,.t Rower';*:.:,;

£;
'.~ " /q, "'"" #"-"< < ,, ', F 60.0 24.0 s P s 28.0 F 60.0 28.0 < P s 45.0 F < 60.0 24.0 s P s 28.0 F < 60.0 28.0 < P s 45.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow li/:;;*:,A,,'y}.

3.3900. 2.5224 3.1000 2.0153 FIGURE 3-28 38 40 42 i;::; : .** a '?'t: -0.03000 -0.01294 -0.03250 -0.00412 Power-Dependent MCPR Limit (MCPRP) versus Core Power (Main Turbine Bypass System Inoperable and/or Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 20 44 45 Plant Hatch Unit 1 Cycle 29 'ic 1.30 1.25 -~ 1.20 :i :l: a: ' "' '"' Non-Proprietary Information Core Operating Limits Report Version 1.0 1.15 :l: ... ' C: a, 'C C: a, C.1.10 a, C ! D. 1.05 1.00 '--,.., ' i"i,,,.,, ........... ' "--45 50 55 60 65 70 75 80 85 90 95 100 Core Power (% of Rated) Kp =A+ B*P . Rower *A . B "&'"' *. ,., 45.0 < P :5 60.0 1.6700 -0.00867 60.0 < P :5 85.0 1.3708 -0.00368 85.0 < P :5 100.0 1.3867 -0.00387 P = Percent of Rated Core Power Power-Dependent MCPR Multiplier (KP) versus Core Power 21 Plant Hatch Core Operating Limits Report Version 1.0 . Unit 1 Cycle 29 1.30 1.25 -~ 1.20 I :i :iil 0:: f5 1.15 :iil ... C: Cl) "'C C: Cl) C.1.10 Cl) C "' " Non-Proprietary Information ' I II.. 1.05 " 1.00 45 50 55 60 65 70 75 80 85 90 Core Power (% of Rated) Kp =A+ B*P 45.0 < P s 60.0 1.5320 -0.00560 60.0 < P s 85.0 1.3808 -0.00308 85.0 < P s 100.0 1.7933 -0.00793 P = Percent of Rated Core Power FIGURE 3-38 Power-Dependent MCPR Multiplier (KP) versus Core Power (Main Turbine Pressure Regulator System Status in TLCO 3,3.13.c) 22 "-"' 95 100 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 '§ 1.50 :J 1.48 a:: 1.46 2 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ------------------a.a 0.3 Exposure Range BOC-MOC1 MOC1 -MOC2 MOC2-EOC -----,--------0.5 't ----------------OLMCPR(TLO) . t= 0.0 t= 1:0 1.31 1.39 1.36 1.47 1.38 1.49 FIGURE 3-4A-1 Core Operating Limits Report Version 1.0 I MOC2-EOC l_ ------------------------I MOC1 -MOC2 I -I BOC-MOC1 r 0.8 1.0 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 '§ 1.48 :J a:: 1.46 1.44 2 1.42 1.40 1.38 1.36 1.34 1.32 1.30 TLO MCPR Limits versus Average SCRAM Time 23 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 111.so :J 1.48 a:: 1.46 ::ilE 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ...---i----0.0 ---------------0.3 BOC-MOC1 MOC1 -MOC2 MOC2-EOC Non-Proprietary Information Core Operating Limits Report Version 1.0 I MOC2-EOC I -------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 11 1.48 :J -----i----------a:: 1.46 ---------------------0.5 t * .. -.* * .,: ; , .Ol,.MCPR{i-LO); . ** .?ts :*. :,; = o:o *-. . . :.c =-~.o ;,~ 1.35 1.41 1.37 1.48 1.39 1.50 FIGURE 3-4A-2 --1 MOC1 -MOC2 I I BOC-MOC1 0.8 f--f-1.0 1.44 ::ilE 1.42 1.40 1.38 1.36 1.34 1.32 1.30 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 24 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 -----i---Non-Proprietary Information Core Operating Limits Report Version 1.0 -----------I MOC2-EOC 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 ] 1.48 :J -------------------] 1.50 :J 1.48 0:: 1.46 --------------0:: 1.46 :!ii: 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ------I MOC1 -MOC2 I ---------------------_i.----------i---------I BOC -MOC1 I ------------------0.0 -------0.3 0.5 0.8 Exposure Range OLMCPR(TLO) t = 0.0 t = 1.0 BOC-MOC1 1.31 1.44 MOC1 -MOC2 1.36 1.49 MOC2-EOC 1.46 1.59 FIGURE 3-4A-3 TLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 25 1.0 1.44 a 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 -1.50 :J 1.48 a: ------1.46 Z 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ------------------0.0 0.3 . ;* Exposure Ran_ge BOC -MOC1 MOC1 -MOC2 MOC2-EOC Non-Proprietary Information


___.. ---Core Operating Limits Report Version 1.0 I MOC2-EOC L --------i...-----I MOC1 -MOC2 I -------------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :J a: 1.46 1.44 Z --------------1.42 1.40 1.38 1.36 1.34 ------------0.5 .. OLMCPR(TLO)

    • .. -r = 0.0 -r'=1.0 1.35 1.46 1.38 1.52 1.48 1.62 FIGURE 3-4A-4 I 0.8 . BOC-MOC1 I 1.0 1.32 1.30 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable

& EOC-RPT Out of Service) 26 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 :J 1.48 0:: f; 1.46 1.44 -Non-Proprietary Information


Core Operating Limits Report Version 1.0 ----------I BOC-EOC I 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :J 0:: 1.46 f; 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ------1.44 2: 1.42 1.40 1.38 0.0 0.3 i Exposure Range BOC-EOC 0.5 . 't .. OLIVIC:::PR(TLO)

't'= 0.0 I 't = 1.0 1.38 I 1.49 FIGURE 3-4A-5 0.8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 27 1.0 1.36 1.34 1.32 1.30 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 :::i 1.48 0:: & 1.46 :iii: 1.44 Non-Proprietary Information Core Operating Limits Report Version 1.0 I MOC2-EOC I 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :::i -----0:: 1.46 & ~--....... I BOC-MOC2 I 1.44 :!!: 1.42 1.40 1.38 1.36 1.34 1.32 1.30 1.42 1.40 1.38 a.a 0.3 BOC-MOC2 MOC2-EOC 0.5 t 1.38 1.49 1.39 1.50 FIGURE 3-4A-6 0.8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 28 1.0 1.36 1.34 1.32 1.30 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 :i 1.48 0:: 1.46 ::;!E 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 0.0 -----------------1 MOC2-EOC I ----------------------------------------------I BOC-MOC2 I -------------0.3 Exposure Range B0C-MOC2 MOC2-EOC -------0.5 't OLMCPRcrLo) 't = 0.0 't = 1.0 1.38 1.49 1.46 1.59 FIGURE 3-4A-7 0.8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 29 1.0 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :i 0:: 1.46 1.44 :!!: 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 -------Non-Proprietary Information


....---__........---

Core Operating Limits Report Version 1.0 I MOC2-EOC f------------I MOC1 -MOC2 r __........---1.50 :J 1.48 0:: __........---


1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :J 1.46 ::l!: 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 __........---


__........---


I BOC-MOC1 -----0.0 0.3 0.5 0.8 Exposure Range OLMCPR1ri.01

't = 0.0 't = 1.0 BOC-MOC1 1.38 1.49 MOC1 -MOC2 1.38 1.52 MOC2-EOC 1.48 1.62 FIGURE 3-4A-8 TLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass System Inoperable & EOC-RPT Out of Service) 30 [_ 1.0 0:: 1.46 1.44 ::§: 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 l 1,50 :J 1.48 0:: 1.46 2 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 0.0 Non-Proprietary Information 0.3 0.5 .* .. *. OLMCPRisLOi t = 0.0 . . . t = 1.0 .. BOC -MOC1 1.45 1.45 MOC1 -MOC2 1.45 1.51 MOC2-EOC 1.45 1.53 FIGURE 3-48-1 Core Operating Limits Report Version 1.0 I MOC2-EOC I 1 MOC1 -MOC2 I BOC-MOC1 0.8 f---I-r 1.0 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.sa I 1.48 :J 0:: 1.46 1.44 2 1.42 1.40 1.38 1.36 1.34 1.32 1.30 SLO MCPR Limits versus Average SCRAM Time 31 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 :J 1.48 0:: f_; 1.46 :ii= 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 0.0 0.3 BOC-MOC1 MOC1 -MOC2 MOC2-EOC Non-Proprietary Information 1.45 1.45 0.5 't 1.45 .1.52 1.54 FIGURE 3-48-2 Core Operating Limits Report Version 1.0 I . MOC2-EOC I-I I MOC1 -MOC2 I I BOC-MOC1 r 0.8 1.0 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :J 0:: 1.46 f_; 1.44 :.'3i: 1.42 1.40 1.38 1.36 1.34 1.32 1.30 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable) 32 Plant Hatch Unit 1 Cycle 29 -------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 :::i 1.48 0::: ------1.46 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 a.a .. 0.3 . . .. Exposur~ Rang'E! . . BOC-MOC1 MOC1 -MOC2 MOC2-EOC Non-Proprietary Information Core Operating Limits Report Version 1.0 ----------------I MOC2-EOC L 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :::i ---------0.5 OLMCPffisLoJ . .. ... t = 0.0 t= 1:0:

  • 1.45 1.48 1.45 1.53 1.50 1.63 FIGURE 3-48-3 I MOC1 -MOC2 I BOC-MOC1 0.8 -r i-1.0 0::: 1.46 f; 1.44 :i: 1.42 1.40 1.38 1.36 1.34 1.32 1.30 SLO MCPR Limits versus Average SCRAM Time (EOC-RPT Out of Service) 33 Plant Hatch Unit 1 Cycle 29 -----..... Non-Proprietary Information

___. --------Core Operating Limits Report Version 1.0 -----------I MOC2-EOC r --------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 ------.--I MOC1 -MOC2 I-1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 '§ 1.48 :::i '§ 1.50 :::i 1.48 0:: !3 1.46 2 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 0.0 -------------------I BOC-MOC1 0.3 0.5 0.8 Expci~ure Range ,,,-QLIVJCPR1sL01 " .* 't = 0.0 't = 1.0 BOC-MOC1 1.45 1.50 MOC1 -MOC2 1.45 1.56 MOC2-EOC 1.52 1.66 FIGURE 3-48-4 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Bypass System Inoperable

& EOC-RPT Out of Service) 34 I 0:: 1.46 !3 1.44 2 1.42 1.40 1.38 1.36 1.34 1.32 1.30 1.0

  • Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 ] 1.50 :J 1.48 0:: fj 1.46 a 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 -0.0 Non-Proprietary Information 0.3 0.5 Core Operating Limits Report Version 1.0 I BOC-EOC 0.8 -r 1.0 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 ] 1.48 :J 0:: 1.46 fj 1.44 a 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Exposure Range OLMCPR(SLO) t = 0.0 I t = 1.0 .. BOC-EOC 1.45 I 1.53 FIGURE 3-48-5 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c) 35 Plant Hatch Unit 1 Cycle 29 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 :i 1.48 a:: 1.46 5 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ........ a.a 0.3 Non-Proprietary Information 0.5 t Core Operating Limits Report Version 1.0 I MOC2-EOC -I BOC-MOC2 0.8 I -I 1.0 1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :J a:: 1.46 1.44 a 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ::1t:f ~F#f ~f tt~if ie~?r i-._~? :'}:.:~~;:f;t~i>~~~:~t~t~~:~J!~~;

BOC -MOC2 1 .45 1.53 MOC2-EOC 1.45 1.54 FIGURE 3-48-6 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status ,n TLCO 3.3.13.c & Main Turbine Bypass System Inoperable) 36 Plant Hatch Unit 1 Cycle 29 -------Non-Proprietary Information Core Operating Limits Report Version 1.0 ------------------I MOC2-EOC I --------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 :J 1.48 a:: -------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 1.48 :J f_; 1.46 2 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 ,--0.0 0.3 . . .. .. Exp.osureRang'e. BOC-MOC2 MOC2-EOC 0.5 "C OLMCPR(stof

  • .,: = 0.0 1::=-fo 1.45 1.53 1.50 1.63 FIGURE 3-48-7 I B0C-MOC2 0.8 r SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & EOC-RPT Out of Service) 37 I 1.0 a:: 1.46 f_; 1.44 2 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 1 Cycle 29 -------Non-Proprietary Information

__..........


Core Operating Limits Report Version 1.0 ------_,,,,,,--I MOC2-EOC r I MOC1 -MOC2 r ------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 -------------1.66 1.64 1.62 1.60 1.58 1.56 1.54 1.52 1.50 i 1.48 :J i 1.50 :J 1.48 tr: fj 1.46 a 1.44 1.42 1.40 1.38 1.36 1.34 1.32 1.30 -a.a i------' ------== I BOC-MOC1 0.3 0,5 a.a MOC1 -MOC2 1.45 1.56 MOC2-EOC 1.52 1.66 FIGURE 3-48-8 SLO MCPR Limits versus Average SCRAM Time (Main Turbine Pressure Regulator System Status in TLCO 3.3.13.c & Main Turbine Bypass -System Inoperable

& EOC-RPT Out of Service) 38 I 1.0 tr: 1.46 fj 1.44 a 1.42 1.40 1.38 1.36 1.34 1.32 1.30 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 4.0 LHGR LIMITS (Technical Specification 3.2.3) For both two loop operation (TLO) and single loop operation (SLO), the LHGR operating limit for each six inch axial segment of each fuel rod in the core is the applicable rated-power, rated-flow LHGR limit taken from Table 4-1 multiplied by the smaller of either: a. The flow-dependent multiplier,.LHGRFACF, as determined by Table 4-2, OR b. The power-dependent multiplier, LHGRFACp, as determined by Figure 4-2. Table 4-1 shows the exposure-dependent LHGR limits for all fuel types in the core, as a function of initial gadolinium concentration in a six inch segment of a fuel rod. For exposures between the values shown in Table 4-1, the LHGR limit is based on linear interpolation. For illustration purposes, Figures 4-3A and 4-38 show the LHGR limits for fuel segments with the lowest (U02) and highest (U02+Gd203) initial Gd concentrations. These limits apply to operation with vessel dome pressure within +/-1 O psi of nominal pressure, as defined by the Region I pressure band shown in Figure 5-1. With all equipment in service or with the EOC-RPT system out of service, op_eration with vessel dome pressure down to 40 psi below nominal is licensed provided the additional restrictions identified in Section 5.0 are applied with the LHGR operating limit defined in this section. TABLE 4-1 LHGR Limits versus Peak Pellet Exposure GE14C GNF2 ]] (EOL = End of Life (maximum licensed pellet exposure) 39 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information TABLE 4-2 Core Operating Limits Report Version 1.0 Flow-Dependent LHGR Limit Operating Flexibility Options ~** .. . LHGRFACF C .. * . ,,:; . '". ,;-'.; , " *' ' .. Equipment In or Out of Service Fuel Type EOC-RPT Main Turbine Main Turbine Figure# S'f.stem B'f,Q.ass S'f_stem Pressure Regulator In Service OQ.erable* S'i,stem Status GE14C Yes/No Yes/No TLCO 3.3.13.a, b, ore 4-1A Yes/No Yes TLCO 3.3.13.a, b, or c 4-18 GNF2 Yes/No No TLCO 3.3.13.a, b, or c 4-1C

  • At least two bypass valves must be operable 40 Plant Hatch Unit 1 Cycle 29 1.0 'ii: 0.9 Non-Proprietary Information I TLO I V / u. a: (!) :I: ...J i 0.8 HlLolS~ / ,,,, 3 :ii: a: 0.7 (!) :I: ...J i: Q) 0.6 Q) C. Q) Cl 3: 0.5 0.4 ./ /' 30 40 50 LHGRFACF=

A+ B*F \:.' .:* ,; '.j Flow:;/. c 30.0 s; F s; 80.3 F > 80.3 30.0 s; F s; 50.7 F > 50.7 F = Percent of Rated Core Flow I SLO 60 70 80 Core Flow(% of Rated) . -,, , ::1:rLO/SLO '. *A,-,'-****' TLO 0.4574 TLO 1.0000 SLO 0.4574 SLO 0.8000 FIGURE 4-1A Core Operating Limits Report Version 1.0 I 90 100 110 *a .. 0.006758 0.000000 0.006758 0.000000 GE14C Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 41 Plant Hatch Unit 1 Cycle 29 1.0 i 0.9 Non-Proprietary Information I TLO I V / u.. 0:: C) ::c ...J i 0.8 i5.. / / :;:: "3 ::l: 0:: 0.7 C) ::c ...J .. C: Cl) "g 0.6 Cl) C. Cl) C £ 0.5 I TLrnso/ / V V 0.4 30 40 50 LHGRFACF =A+ B*F "Flow 30.0 s F s 50.0 50.0 < F s 80.0 80.0 < F s 90.0 F > 90.0 50.0 < F s 50.7 F > 50.7 F = Percent of Rated Core Flow I SLO 60 70 80 Core Flow (% of Rated) TLO/SLO "":: A* TLO/SLO 0.2000 TLO 0.4567 TLO 0.9820 TLO 1.0000 SLO 0.4567 SLO 0.8000 FIGURE 4-18 Core Operating Limits Report Version 1.0 I 90 100 110 .B 0.01190 0.00677 0.00020 0.00000 0.00677 0.00000 GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow 42 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 1.0 i 0.9 u. 0:: (!) ::c: ..J i 0.8 i :i :ii: I 0:: 0.7 (!) ::c: ..J ... C: Cl) V I TLO/SLO I __,,,,,-0.6 Cl) C. Cl) C § ii: 0.5 V ,,,,. 0.4 30 40 50 LHGRFACF= A+ B*F *Flow 30.0 s F s 50.0 50.0 < F s 60.0 60.0 < F s 90.0 90.0 < F s 100.0 F>100.0 60.0 < F s 61.2 F > 61.2 F = Percent of Rated Core Flow 60 V I TLO I / / /' I SLO I 70 80 90 100 Core Flow (% of Rated) TLOISLO A B. TLO/SLO 0.3800 0.00490 TLO/SLO -0.2100 0.01670 TLO 0.3900 0.00670 TLO 0.9300 0.00070 TLO 1.0000 0.00000 SLO 0.3900 0.00670 SLO 0.8000 0.00000 FIGURE 4-1C GNF2 Flow-Dependent LHGR Multiplier (LHGRFACF) versus Core Flow (Main Turbine Bypass System Inoperable) 43 110 Plant Hatch Unit 1 Cycle 29 1.1 -.:. 1.0 u ci: u... a: (!) :r: 0.9 d .. . !l! ii :;::: 0.8 :a: a: (!) :r: _J "E 0.7 CII "C C CII C. ,,,,-CII 0.6 C --/ """"" ,,,,-3: 0 I < 60% Flow I n. 0.5 I I 60% Flow I 0.4 Non-Proprietary Information / V / / I Core Operating Limits Report Version 1.0 / ,,,,,,-/ v_... << M n n M 100 Core Power(% of Rated) LHGRFACp =A+ B*P Flow Power F 60 24.0 :,; P :,; 28.0 F < 60 24.0:,; P :,; 28.0 All 28.0 < P :,; 45.0 All 45.0 < P :,; 60.0 All 60.0 < P :,; 85.0 All 85.0 < P:,; 100.0 P = Percent of Rated Core Power F = Percent of Rated Core Flow A 0.4000 0.3400 0.4774 0.6320 0.3032 0.4800 FIGURE 4-2 *s 0.00250 0.00500 0.00524 0.00180 0.00728 0.00520 Power-Dependent LHGR Multiplier (LHGRFACp) versus Core Power 44 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information FIGURE 4-3A Core Operating Limits Report Version 1.0 GE14C LHGR Limit versus Peak Pellet Exposure 45 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information FIGURE 4-38 Core Operating Limits Report Version 1.0 GNF2 LHGR Limit versus Peak Pellet Exposure 46 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report . Version 1.0 5.0 OPERA TING PRESSURE LIMITS For both two loop operation (TLO) and single loop operation (SLO), reactor dome pressure must be maintained within the licensed pressure bands defined by Figure 5-1. For operation in each of these regions, the following restrictions apply: a. For Region I operation: The core operating limits from Sections 2.0 through 4.0 are applicable.

b. For Region II and Region Ill operation:
1) The OPRM System must be operable 2) The core operating limits from Section 2.0 are applicable
3) The MFLCPR and MFLPD thermal limit ratios must remain below the maximum values determined by Table 5-1. The MFLCPR and MFLPD thermal limit ratios are defined in terms of the core operating limits defined in Section 3.0 and Section 4.0. The MFLCPR thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Critical Power Ratio (FLCPR) in the core. The FLCPR is defined for each fuel assembly in the core as: FLCPR = MCPRumit Fuel Assembly Minimum Critical Power Ratio where: MCPRumit = MCPR operating limit defined in Section 3.0 47 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information Core Operating Limits Report Version 1.0 The MFLPD thermal limit ratio is the most limiting (maximum) value of the Fraction of Limiting Power Density (FLPD) in the core. The FLPD is defined for each six inch axial segment of each fuel rod in the core as: where: FLPD = Peak kW/ft power generated in a fuel rod segment LHGRumit LHGRumit = LHGR operating limit defined in Section 4.0 The licensed equipment conditions for operation with dome pressures in Region 11 and Region Ill of Figure 5-1 are defined in Table 5-1. TABLE 5-1 Pressure Dependent Operating Flexibility Options . . .. ' >"tJ: :r'hermal i.JrhilRatios for. Reclt.Jced' Presstir~;c>'~eration:
  • c, .. }* ....... :* .,' Equipment In or Out of Service EOC-RPT Main Turbine Main Turbine Table# System Byr2.ass System Pressure Regulator In Service Or2.erable*

System Status Yes Yes TLCO 3.3.13.a or b 5-2 No Yes TLCO 3.3.13.a or b 5-3 Yes/No No TLCO 3.3.13.a orb Flexibility Option Not Licensed Yes/No Yes/No TLCO 3.3.13.c Flexibility Option Not Licensed

  • At least two bypass valves must be operable 48 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information TABLE 5-2 Core Operating Limits Report Version 1.0 Maximum Thermal Limit Ratios for Equipment In Service Operation . :,, ' l' 'Dorrie Pressure Band fro1t1 Figure. 5~1 ,, *,: ,, ,,,> Limit Ratio Region I Region II Region Ill MFLCPR 1.00 0.97 0.95 MFLPD 1.00 0.94 0.83 TABLE 5-3 Maximum Thermal Limit Ratios for EOC-RPT Out of Service Operation

.. Dome ~*ressure Band .from Figure 5~1 ,, Limit Ratio Region I Region II Region Ill MFLCPR 1.00 0.97 0.92 MFLPD 1.00 0.94 0.83 49 Pla n t Hatch Unit 1 Cycle 29 Non-Propr ieta ry Information Core Operating Limits Report Version 1.0 .1QQQ..Q_t::=::::+/-::!:::===:::l:::=====:t==l~===+/-==:::+/-:==::::+/-::===!:::==::+/-:::==::+/-:::==::+/-::===+/-===+/-===:t:::===!:::===t:::=====I 1058.0 1040.0 c, 1020.0 .iii ; 1000.0 Ill Ill 0.. 980.0 0 CJ 940.0 920.0 20 :25 30 35 40 45 50 55 60 65 70 75 24 Core Power (% of Rated) P = A+ B*(CP) + C*(CP)2 Dome Pressure Curves Core Power Nominal Dome Pressure (Pn om) 24 :5 CP :5 100 Region I Upper Boundary (Pnom+10) 24 :5 CP :5 100 Region I Lower Boundary (Pn om-10) 24 s; CP s; 100 Region II Lower Boundary (Pnom-2 0) 24 s; CP s; 100 Region Ill Lower Boundary (Pnom-4o) 24 :5 CP :5 100 GP = Percent of Rated Core Power P = Reactor Dome Pressure (psig) FIGURE 5-1 A B 958.30 0.300 968.30 0.300 948.30 0.300 938.30 0.300 918.30 0.300 Licensed Regions of Operating Dome Pressure versus Core Power 50 1058.0 C 0.0057 0.0057 0.0057 0.0057 0.0057 Plant Hatch Unit 1 Cycle 29 Non-Proprietary Information 6.0 PBDA AMPLITUDE SETPOINT Core Operating Limits Report Version 1.0 The amplitude trip setpoint in the Period Based Detection Algorithm in the OPRM system must be set equal to the licensed value reported in Table 6-1. This applies to instruments 1 C51 K615 A, B, C, and D. TABLE 6-1 Licensed OPRM Amplitude Setpoint . OPRMS.~tpoint

  • 1.15 51 Plant Hatch Unit 1 Cycle 29 7 .0 REFERENCES Non-Proprietary Information Core Operating Limits Report Version 1.0 1. Global Nuclear Fuel Document NEDE-24011-P-A-25, "General Electric Standard Application for Reactor Fuel," August 2017, and the US Supplement, NEDE-24011-P-A-25-US, August 2017. 2. Southern Nuclear Operating Company Document NFD-H-17-280 "Hatch-1 Cycle 29 Reload Licensing Analysis Report," Version 1.0, January 2018. 3. Global Nuclear Fuel Document 004N0711, "Supplemental Reload Licensing Report for Hatch 1, Reload 28, Cycle 29," Revision 0, November 2017. 4. Global Nuclear Fuel Document 004N0712, "Fuel Bundle Information Report for Hatch 1, Reload 28, Cycle 29," Revision 1, December 2017. 5. Global Nuclear Fuel Document NEDC-32868P, "GE14 Compliance with Amendment 22 of NEDE-24011-P-A (GESTAR II)," Revision 6, March 2016. 6. Global Nuclear Fuel Document NEDC-33270P, "GNF2 Advantage Generic Compliance with NEDE-24011-P-A (GESTAR //}," Revision 8, April 2017. 7. Global Nuclear Fuel Document 004N4841, "Technical Evaluation to Support Introduction of Partially ARMOR Coated Lead Test Rods (L TRs) in Four (4) GNF2 Reload Assemblies at Hatch Nuclear Plant, Unit 1," Revision 0, November 2017. 8. Global Nuclear Fuel Document 004N5426, "Technical Evaluation to Support Introduction of GNF FeCrAI (ATF) Unfueled Lead Test Rods (LTRs) in Four (4) GNF2 Reload Assemblies at Hatch Nuclear Plant, Unit 1," Revision 0, November 2017. 52}}