ML082490758: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[LIC-08-0098, Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Change of Commitment for Close-out Letter Submittal]]
| number = ML082490758
| issue date = 09/05/2008
| title = Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Change of Commitment for Close-out Letter Submittal
| author name = Clemens R P
| author affiliation = Omaha Public Power District
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000285
| license number = DPR-040
| contact person =
| case reference number = GL-04-002, LIC-08-0098, TAC MC4686
| document type = Letter
| page count = 2
| project = TAC:MC4686
| stage = Other
}}
 
=Text=
{{#Wiki_filter:ii**--Omaha Public Power District 444 South 16th Street Mall Omaha NE 68102-2247 September 5,
U. S. Nuclear Regulatory AnN: Document Control Washington, DC
: 1. Docket No. 50-285 Letter from NRC (B. A. Borger), Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated September 13, 2004 (NRC-04-0115) Letter from NRC (C. Haney) to OPPD (R. 1. Ridenoure), "Fort Calhoun Station Unit No. 1 -Generic Letter 2004-02, 'Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized Water Reactors,'
Extension Request Approval (TAC. No. MD2323)," dated August 11, 2006 (NRC-06-0103)
: 4. Letter OPPD (R. P. Clemens) to NRC (Document Control Desk), Supplemental Response to Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," dated February 29, 2008 08-0021) (ML080650369) Email from NRC (M. T. Markley) to OPPD (B. R. Hansher), Request for Additional Information, Fort Calhoun Station, Unit 1 -Supplemental Response to Generic Letter (GL) 2004-02 (TAC No. MC4686), dated July 28,2008 SUB..Fort Calhoun Station, Unit No. 1 -Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors," Change of Commitment for Close-out Letter Submittal Generic Letter (GL) 2004-02 requested that all licensees complete actions related to the GL by December 31, 2007. The Omaha Public Power District (OPPD) subsequently provided various GL extension request submittals, which were approved by the Nuclear Regulatory Commission (NRC) via Reference 3, until the completion of the Fort Calhoun Station (FCS) spring 2008 refueling outage (RFO). By letter dated February 29, 2008, OPPD provided its supplemental response to GL 2004-02 and committed to provide the GL 2004-02 close-out letter within 90 days of completion of the 2008 RFO. Employment with Equal Opportunity 4171 U. S. Nuclear Regulatory Commission L1C-08-0098 Page 2 However, OPPD recently received a request for additional information (RAI) via email from the NRC Project Manager related to the GL 2004-02 supplemental response submitted in Reference
: 4. The NRC has requested that OPPD provide the responses to the 36 RAI questions provided in Reference 5 in the same submittal as the final GL 2004-02 close-out letter committed to in Reference
: 4. In order to provide an integrated package containing the final close-out letter and responses to the 36 RAI questions, OPPD is extending the original commitment to provide the GL 2004-02 close-out letter from within 90 days of the 2008 RFO to October 17, 2008. This was discussed via telephone with the NRC Project Manager and other NRC staff on September 3,2008. This extension allows time to obtain and coordinate the vendor responses to select RAI questions as well as time to facilitate internal OPPD reviews to ensure there are no inconsistencies between the RAI responses and the GL 2004-02 close-out letter. Therefore, the regulatory commitment
[AR 35967] is revised to proVide the GL 2004-02 close-out letter and the 36 RAI responses in a single submittal on October 17, 2008. If you should have any questions regarding this submittal or require additional information, please contact Mr. Bill Hansher at 402-533-6894.
R. R. Clemens Division Manager Nuclear Engineering RPC/DLLldll}}

Latest revision as of 09:02, 17 April 2019