#REDIRECT [[CNL-14-203, Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis]]
| number = ML15205A123
| issue date = 12/15/2014
| title = Watts Bar Nuclear Plant Units 1 and 2 - Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis
| author name = Shea J W
| author affiliation = Tennessee Valley Authority
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000390, 05000391
| license number = CPPR-0092, NPF-090
| contact person =
| case reference number = CNL-14-203
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402CNL-14-203 December 15, 2014 10 CFR 50.47  10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission ATTN:  Document Control Desk Washington, D.C. 20555-0001  Watts Bar Nuclear Plant, Unit 1  Facility Operating License NPF-90 NRC Docket No. 50-390 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
 
==Subject:==
Watts Bar Nuclear Plant Units 1 and 2 - Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis  
 
==References:==
: 1. Tennessee Valley Authority Letter to NRC, "Watts Bar Nuclear  Plant Units 1 and 2 - Submittal of Revision to the Radiological Emergency Plan and On-Shift Staffing analysis," dated  September 12, 2014  2. Electronic Mail from NRC to TVA, "Watts Bar, Unit 2 - Request for Additional Information (RAIs) on EP Chapter 13.3 and Staffing  Analysis," dated October 17, 2014 In Reference 1, the Tennessee Valley Authority submitted Revision 104X to the Radiological Emergency Plan for the Watts Bar Nuclear Plant and a copy of the Emergency Response Organization On-Shift Staffing Analysis Report. In Reference 2, the Nuclear Regulatory Commission (NRC) requested additional information related to the Reference 1 submittal. Enclosure 1 provides responses to address the NRC's requests. Enclosure 2 provides an updated copy of the Emergency Response Organization On-Shift Staffing Analysis Report. There are no new regulatory commitments associated with this letter. If you have any questions or comments, please contact Gordon Arent at (423) 365-2004.
U.S. Nuclear Regulatory Commission CNL-14-203
 
Page 2 December 15, 2014 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of December 2014.
Respectfully, J. W. Shea Vice President, Nuclear Licensing
 
==Enclosures:==
: 1. Responses to Request for Additional Information, Watts Bar Nuclear Plant,  Units 1 and 2, Radiological Emergency Plan and On-Shift Staffing Analysis 
: 2. Emergency Response Organization On-Shift Staffing Analysis Report, Revision 3 cc (Enclosure): U. S. Nuclear Regulatory Commission, Region II NRC Resident Inspector - Watts Bar Nuclear Plant Unit 1 NRC Resident Inspector - Watts Bar Nuclear Plant Unit 2 NRR Project Manager - Watts Bar Nuclear Plant J. W. Shea Digitally signed by J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley
 
Authority, ou=Nuclear Licensing, email=jwshea@tva.gov, c=US
 
Date: 2014.12.15 21:30:01 -05'00'}}