ML15273A366: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[LR-N15-0202, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17]]
| number = ML15273A366
| issue date = 09/21/2015
| title = Salem and Hope Creek - Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program, Revision 17
| author name = Gaerity A
| author affiliation = PSEG Nuclear, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000272, 05000311, 05000354
| license number = DPR-070, DPR-075, NPF-057
| contact person =
| case reference number = LR-N15-0202
| document type = Letter
| page count = 3
}}
 
=Text=
{{#Wiki_filter:*SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.
LR-N15-0202 SEP 21 2015 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 PSEG Nuclear LLC 10 CFR 50.54(p) 10 CFR 73.21 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
 
==Subject:==
 
Salem Nuclear Generating
: Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-70 and DPR-75 NRG Docket Nos. 50-272 and 50-311 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRG Docket No. 50-354 Salem-Hope Creek Generating Stations s*ecurity Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security
: Program, Revision 17 Pursuant to the requirements of 10 CFR 50.54(p)(2),
PSEG Nuclear, LLC (PSEG), hereby submits Revision 17 to the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program.
Enclosure 1 contains Form 2 -10 CFR 50.54(p)
Evaluation Form for the Salem-Hope Creek Generating Stations Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security
: Program, Revision 17, that will be implemented on September 22, 2015, and reflects the destaffing of two posts, one at Salem and one at Ho"pe Creek. Enclosure 1 also contains the NEI security plan change template from NEI 11-08, Guidance on Submitting Security Plan Changes.
A copy of the revised Salem-Hope Creek Generating Stations Security Plan, Training and
* Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program document in its entirety is included in Enclosure
: 2. This revision contains the nomenclature from NEI 03-12 Revision 7, "Template for the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan and Independent Spent Fuel Storage Installation Security Program."
The documents included in Enclosures 1 and 2, have been determined to contain safeguards information.
PSEG requests that this information be withheld from public disclosure in accordance with 10 CFR 73.21, "Protection of Safeguards Information:
Performance Requirements,"
paragraph (a)(1 ). There are no regulatory commitments contained in this letter. SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.
SUU \
SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.
SEP 21 2015 Page 2 LR-N15-0202 10 CFR 50.54(p) 10 CFR 73.21 In accordance with the requirements of 10 CFR 50.54(p)(2),
the signed original is being sent to the Document Control Desk and one copy is being sent to Region I. If you have any questions or require additional information, please do not hesitate to contact me at (856) 339-2282.
-
.............
Anndria Gaerity Executive
: Director, Corporate Services Enclosures (1 _and 2) -contain Safeguards Information cc (with Enclosures)
_ D. Dorman, Administrator
-Region 1 NRC U.S. Nuclear Regulatory Commission 2100 Renaissance Boulevard, Suite 100 King of Prussia, PA 19406-2713 cc (all w/o Enclosure)
Thomas J. Wengert, Project Manager, US NRC NRC Senior Resident Inspector, Salem NRC Senior Resident Inspector, Hope Creek P. Mulligan, Chief, NJBNE T. Cachaza, Commitment Tracking Coordinator, Salem T. MacEwen, Commitment Tracking Coordinator, Hope Creek L. Marabella, Corporate Commitment Tracking Coordinator SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection
_ / from unauthorized disclosure.
-
SAFEGUARDS INFORMATION When separated from Safeguards Information in enclosure and attachment, this document is decontrolled provided the transmittal document does not otherwise warrant
* protection from unauthorized disclosure.
SEP 21 2015 Page 3 LR-N15-0202 bee: Executive
: Director, Corporate Services
* Director, Regulatory Affairs Manager, Licensing Records Management SAFEGUARDS INFORMATION 10 CFR 50.54(p) 10 CFR 73.21 When separated from Safeguards Information in enclosures, this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.}}

Latest revision as of 07:28, 7 April 2019