ML16200A377: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[JAFP-16-0118, NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021]]
| number = ML16200A377
| issue date = 07/18/2016
| title = NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021
| author name = Drews W C
| author affiliation = Entergy Nuclear Northeast, Entergy Nuclear Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000333
| license number = DPR-059
| contact person =
| case reference number = JAFP-16-0118, RIS-16-09
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 3
}}
 
=Text=
{{#Wiki_filter:*
JAFP-16-0118 July 18, 2016 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001
 
==Subject:==
NRC Form 536, Operator Licensing Examination Data James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc. James A. FitzPatrick NPP P.O. Box 110 Lycoming , NY 13093 Tel 315-342-3840 William C. Drews Regulatory Assurance Manager
 
==Reference:==
: 1) NRC Regulatory Issue Summary, Preparation and Scheduling of Operator Licensing Examinations, RIS 2016-09, dated June 16, 2016 2) ENOI letter, Certification of Permanent Cessation of Power Operations, JAFP-16-0045, dated March 16, 2016
 
==Dear Sir or Madam:==
Enclosed is NRC Form 536 for the calendar years (CY) 2018 thru 2021. The Form is provided per request of Regulatory Issue Summary 2016-09 [Reference 1]. The Enclosure is based on the plan to permanently shutdown James A. FitzPatrick Power Plant [Reference 2]; however, recent events may require a change to this plan and the number of Operator Licensing Examinations scheduled.
If this happens, an update to NRC Form 536 will be submitted.
There are no new regulatory commitments contained in this letter. Should you have any questions, please contact Mr. Mike Reno, Training Manager, at 315-349-6201.
Very truly yours, 4'*1J_ /k--o.dJ"'_) Po r William C. Drews Regulatory Assurance Manager WCD/mh
 
==Enclosure:==
 
NRC Form 536, Operator Licensing Examination Data (CY 2018 -2021) cc: NRC Project Manager NRC Region I Administrator NRC Resident Inspector 
 
JAFP-16-0118
 
Enclosure NRC Form 536, Operator Lic ensing Examination Data  (CY 2018 - 2021)
(1 Page)
OPERATOR LICENSING EXAMINATION DATANRC FORM 536(05-2016)U. S. NUCLEAR REGULATORY COMMISSION A. PROPOSED EXAMINATION PREPARATION SCHEDULENRC FORM 536  (05-2016)APPROVED BY OMB:  NO. 3150-0131EXPIRES:  10/31/2017 PROPOSED NUMBER CYCY CY CY PROPOSED NUMBERPROPOSED DATESPRIMARY DATEALTERNATE DATEPROPOSED NUMBERCY MARCHCY CY CY CY CY SEPTEMBERMARCHSEPTEMBEREstimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC  20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. ESTIMATED NUMBER OF CANDIDATESFACILITYNRC REGIONESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONSESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONSNUMBER OF REACTOR OPERATORSNUMBER OF SENIOR REACTOR OPERATORS - INSTANTNUMBER OF SENIOR REACTOR OPERATORS - UPGRADENUMBER OF SENIOR REACTOR OPERATORS - LIMITEDB. INITIAL OPERATOR LICENSE EXAMINATIONSC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 18 0 19 00 0 20 0 21 0 00 18 0 0 0 0 N/A N/A 19 0 0 0 0 N/A N/A 20 0 0 0 0 N/A N/A 21 0 0 0 0 N/A N/A 17 00 18 00James A. FitzPatrick Nuclear Power Plant 1}}

Latest revision as of 19:50, 6 April 2019