| number = ML14237A175
| number = ML14237A175
| issue date = 07/31/2014
| issue date = 07/31/2014
| title = Arkansas Nuclear One, Unit 2-2014-07 Final Licensing Operating Test
| title = 2014-07 Final Licensing Operating Test
| author name = Gaddy V
| author name = Gaddy V
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV

Revision as of 18:56, 3 April 2019

2014-07 Final Licensing Operating Test
ML14237A175
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/31/2014
From: Vincent Gaddy
NRC Region 4
To:
Entergy Operations
laura hurley
References
50-368/14-07 50-368/OL-14
Download: ML14237A175 (68)


Text

Revision 0ES-301Administrative Topics OutlineForm ES-301-1Facility: Arkansas Nuclear One Unit 2Date of Examination: July 2014Examination Level: RO SRO XOperating Test Number: 2014-2Administrative Topic (see Note)Type Code*Describe activity to be performedA1. Conduct of Operations2.1.25 SRO (4.2)D/RDetermine if COLR DNBR limit is being met during aloss of COLSS and what action is required.ANO-2-JPM-NRC-ADMIN-DNBRLA2. Conduct of Operations2.1.34 SRO (3.5)N/RApply Steam Generator Chemistry limitsANO-2-JPM-NRC-ADMIN-SGCHEMA3. Equipment Control2.2.37 SRO (4.6)D/RApply Tech Specs.ANO-2-JPM-NRC-ADMIN-EDGTSA4. Radiation Control2.3.14 SRO (3.8)

M/RAdministration of Potassium Iodide.ANO-2-JPM-NRC-ADMIN-KI2A5. EmergencyProcedures/Plan2.4.41 SRO (4.6)

M/RDetermine Emergency Action LevelANO-2-JPM-NRC-ADMIN- EAL13NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they areretaking only the administrative topics, when all 5 are required.* Type Codes & Criteria:(C)ontrol room, (S)imulator, or Class(R)oom(D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)(N)ew or (M)odified from bank ( 1)(P)revious 2 exams ( 1; randomly selected)

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 1 of 5ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2REV#: 002DATE:SYSTEM/DUTY AREA: Conduct of OperationsTASK: Determine if COLR DNBR limit is being met during a loss of COLSS.JTA#: ANO-2-SRO-EOPAOP-OFFNORM-233KA VALUE RO:3.9SRO:4.2KA

REFERENCE:

2.1.25APPROVED FOR ADMINISTRATION TO:

RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S): Unit 2 Tech Specs and Unit 2 COLREXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 2 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out ofservice for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT #1 CEAC is inoperable for Surveillance testing #2 CEAC is operableTASK STANDARD: Determine that Technical Specifications LCO 3.2.4 action b isapplicable.TASK PERFORMANCE AIDS: Unit 2 Tech Specs and Unit 2 COLR ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 3 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE:Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.

START TIME:PERFORMANCE CHECKLIST STANDARD(Circle One)1. Using Tech Spec 3.2.4determines that the COLRmust be referenced todetermine if TS are satisfied.Examinee correctly derivedfrom Tech Spec 3.2.4 thatsince COLSS is inoperable,the COLR graph must bereferenced to determine ifTech Spec 3.2.4 is met.N/A SAT UNSAT (C)2. Using COLR figuredetermines DNBR is not inthe acceptable region foroperation and that Tech SpecLCO 3.2.4.c should beentered.Examinee correctly derivedfrom graph based on givenvalues that DNBR is not in theacceptable region of operationand determined that LCO3.2.4.c is applicable for thecurrent condition.N/A SAT UNSAT (C)3. Using Tech 3.2.4 determinethat DNBR must meet therequirements of T.S 3.2.4 action bExaminee correctlydetermines the DNBR must berestored to meet therequirements of the COLRgraph within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to complywith Tech Spec 3.2.4 action b.N/A SAT UNSATEXAMINER's NOTE: Examinee may discuss the Tech Spec applicability at this point statingthat Tech Spec 3.2.4 LCO requires power to be lowered so that DNBR isrestored to the acceptable region within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

ENDSTOP TIME:

ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 4 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYJPM INITIAL TASK CONDITIONS

The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out ofservice for maintenance COLSS has been declared inoperable due to failed power supplies The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT #1 CEAC is inoperable for Surveillance testing #2 CEAC is operableINITIATING CUE:Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.Applicable Tech Spec LCOs (if any) _________________________Actions required to comply with Tech Specs (if any) ______________________________Tech Spec 3.2.4 LCO Action b requires power to be lowered so that DNBR is restored tothe acceptable region within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.T.S. LCO 3.2.4.cT.S. 3.2.4. Action b ANO-2-JPM-NRC-ADMIN-DNBRL A1 Page 5 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYJPM INITIAL TASK CONDITIONS
The plant is at 85% power, Steady State due to 2P-1A Feedwater pump being out ofservice for maintenance COLSS has been declared inoperable due to failed power supplies. The CPC average DNBR is 2.35 The CPC average ASI is -0.0001 The CPC average LPD is 12.9 KW/FT #1 CEAC is inoperable for Surveillance testing #2 CEAC is operableINITIATING CUE:Determine if any Tech Specs LCOs are applicable and/or actions that are required for this condition.Applicable Tech Spec LCOs (if any) _________________________Actions required to comply with Tech Specs (if any) ______________________________________________________________________________________________________

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 1 of 6ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2REV#: 001DATE:SYSTEM/DUTY AREA: Conduct of OperationsTASK: Apply Steam Generator Chemistry limits.JTA#: ANO-2-SRO-ADMIN-OFFNORM-2KA VALUE RO:2.7SRO:3.5KA

REFERENCE:

2.1.34APPROVED FOR ADMINISTRATION TO:

RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:30 MinutesREFERENCE(S): 1000.043 Steam Generator water Chemistry Monitoring Unit 2EXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 2 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation. The previous shift raised power from 20% to 80%. All normal chemistry sampling equipment is in service. Chemistry reports the following sample results:Steam Generator Blowdown:Cation conductivity: 0.5 µmho/cmSodium: 3 ppbChloride: 15 ppbSulfate: 12 ppbMain Feedwater:Dissolved O2: 12 ppbTotal Iron: 3 ppbTotal Copper: 0.1 ppbHydrazine: 130 ppbETA: 4.2 ppmCondensate:Dissolved O2: 15 ppbTASK STANDARD
Determined that Attachment 3 of 1000.043 is applicable for operation >50% power.Determined that Chloride and Sulfate within acceptable values due to 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowance ofexceeding 50% power.Determined that Feedwater Dissolved O 2 is above action level 2.Determined that plant power should be reduced to <50% within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of initiation of action level2 and return Feedwater Dissolved O 2 below action level 1 value within 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> or go to actionlevel 3.Determined that the following action should be initiated: Check residual hydrazine; if below normal, increase feed rate. Institute air inleakage location efforts. Test other available locations in Feedwater train for dissolved oxygen ingress.TASK PERFORMANCE AIDS: 1000.043 Steam Generator Water Chemistry monitoring Unit 2 ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 3 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE:Determine if Action Levels are applicable (list your basis) and any Action Level requirements and CorrectiveAction requirements based on current plant Steam Generator and Secondary Water Chemistry.

START TIME:PERFORMANCE CHECKLIST STANDARD(Circle One)1. Review 1000.043, SteamGenerator Water ChemistryMonitoring Unit 2.Determined that 1000.043,Steam Generator WaterChemistry Monitoring Unit 2should be reviewed forapplicability.N/A SAT UNSAT 2.(C)Determine which attachmentshould be used based on currentplant conditions.Determined that 1000.043attachment 3 should be usedto compare value versus limit.N/A SAT UNSAT 3.(C)Review provided values toattachment 3 of 1000.043 forSteam Generator Blowdownsamples.Determined that Chloride andSulfate are NOT above theaction level 1 value due tonote 'J' of attachment 3.N/A SAT UNSAT 4.(C)Review provided values toattachment 3 of 1000.043 forMain Feedwater samples.Determined that Dissolved O 2is above the action level 2value.N/A SAT UNSAT 5.Review provided values toattachment 3 of 1000.043 forCondensate samples.Determined that CondensateDissolved O 2 is not used as acontrol parameter due to note "G"N/A SAT UNSAT ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 4 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREPERFORMANCE CHECKLIST STANDARD(Circle One) 6.(C)Review action level 2 forrequirements.Determined action level 2requirements as follows:Reduce power to <50% within24 hours of initiation of actionlevel 2.(Critical portion ofstep)Consider performing hot soak.(Not critical)Return Feedwater Dissolved O 2 below action level 1 valuewithin 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> or go toaction level 3.(Criticalportion of step)Perform technical reviewassessing the abnormal waterchemistry condition.(Not critical)N/A SAT UNSAT 7.(C)Review 1000.043, Attachment 6to determine action requiredbased on plant conditions.Determined the followingactions:Check residual hydrazine; ifbelow normal, increase feed rate.Institute air inleakage location efforts.Test other available locationsin Feedwater train fordissolved oxygen ingress.N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 5 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation. The previous shift raised power from 20% to 80%. All normal chemistry sampling equipment is in service. Chemistry reports the following sample results:Steam Generator Blowdown:Cation conductivity: 0.5 µmho/cmSodium: 3 ppbChloride: 15 ppbSulfate: 12 ppbMain Feedwater:Dissolved O2: 12 ppb Total Iron: 3 ppbTotal Copper: 0.1 ppbHydrazine: 130 ppbETA: 4.2 ppm Condensate:Dissolved O2: 15 ppbINITIATING CUE:Determine if Action Levels are applicable (list your basis) and any Action Levelrequirements and Corrective Action requirements based on current plant Steam Generatorand Secondary Water Chemistry.

ANO-2-JPM-NRC-ADMIN-SGCHEM A2 Page 6 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS

The plant is at 80% power Power is being maintained ~80% for NICAL during a power escalation. The previous shift raised power from 20% to 80%. All normal chemistry sampling equipment is in service. Chemistry reports the following sample results:Steam Generator Blowdown:Cation conductivity: 0.5 µmho/cmSodium: 3 ppbChloride: 15 ppbSulfate: 12 ppbMain Feedwater:Dissolved O2: 12 ppb Total Iron: 3 ppbTotal Copper: 0.1 ppbHydrazine: 130 ppbETA: 4.2 ppm Condensate:Dissolved O2: 15 ppbINITIATING CUE:Determine if Action Levels are applicable (list your basis) and any Action Levelrequirements and Corrective Action requirements based on current plant Steam Generatorand Secondary Water Chemistry.

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 1 of 5ADMINISTRATIVE JOB PERFORMANCE MEASURE 2REV#: 2DATE:SYSTEM/DUTY AREA: Equipment controlsTASK: Determine EDG and PZR TS applicability and any required actions.JTA#: ANO-SRO-ADMIN-NORM-103KA VALUE RO:3.6SRO:4.6KA

REFERENCE:

2.2.37APPROVED FOR ADMINISTRATION TO:

RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S): 2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12Corrective Action, Unit 2 Tech Specs.EXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 2 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIAL CONDITIONS: Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pump inoperable", there isno light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.TASK STANDARD

Determined the current applicable Tech Specs: T.S. 3.8.1.1.b T.S. 3.4.4Determined the most restrictive Required Action: 3.8.1.1 Action b.1Demonstrate the OPERABILITY of both the A.C. circuits by performing Surveillance Requirement4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafterTASK PERFORMANCE AIDS
2203.012-H, Annunciator 2K08 Corrective Actions, 2203.012-U, Annunciator 2E12 Corrective Action, Unit 2Tech Specs.SIMULATOR SETUPN/AEXAMINER NOTES:

None.

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 3 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE: Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pump inoperable", there isno light indication for 2P-16A Fuel Oil Transfer Pump, and breaker 2B53-K3 is tripped.Determine ALL current applicable Unit 2 Tech Specs associated with this condition ANDIdentify the most restrictive Required Action.

START TIME:PERFORMANCE CHECKLIST STANDARD(Circle One) 1.Review Annunciator corrective actionfor applicabilityReferenced 2K-08 and 2E-12Annunciator corrective actionsdetermined need to review TechSpecsN/A SAT UNSAT 2.(C)Review 3.8.1.1 Tech Spec forapplicabilityExaminee reviewed T.S. 3.8.1.1.band determined that the #1 EDG isinoperable and determines action bis applicable.N/A SAT UNSATReview for additional Tech Specs.Using Tech Specs or 2104.036 EDGprocedure, determined that Tech3.4.4 should also be reviewed.N/A SAT UNSAT 3.(C)Review 3.4.4 Tech Spec for applicabilityExaminee reviewed T.S. 3.4.4 anddetermined that the Pressurizer isinoperable and determines action bis applicable.N/A SAT UNSAT 4.(C)Review applicable actions anddetermine most limiting requirement.Examinee reviewed the applicableTech Specs and determined thatT.S. 3.8.1.1 action b.1 is the mostlimiting action requirement.N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 4 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS

Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pumpinoperable", there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker2B53-K3 is tripped.INITIATING CUE:Determine ALL current applicable Unit 2 Tech Specs associated with this condition ANDIdentify the most restrictive Required Action.Current applicable Tech Specs: T.S. 3.8.1.1.b T.S. 3.4.4Most restrictive Required Action: 3.8.1.1 Action b.1Demonstrate the OPERABILITY of both the A.C. circuits by performing SurveillanceRequirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter ANO-2-JPM-NRC-ADMIN-EDGTS A3 Page 5 of 5ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS
Unit 2 is at 100% power Annunciator 2K08-K1, Fuel System Trouble, is received in the Control Room The Inside Auxiliary Operator reports that the local alarm is 2K-128 "Fuel x-fer pumpinoperable", there is no light indication for 2P-16A Fuel Oil Transfer Pump, and breaker2B53-K3 is tripped.INITIATING CUE:Determine ALL current applicable Unit 2 Tech Specs associated with this condition ANDIdentify the most restrictive Required Action.Current applicable Tech Specs:________________________________________________________________________________________________________________________________________________Most restrictive Required Action:_____________________________________________________________________________________________________________________________________________________________________________________________________________________

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 1 of 6ADMINISTRATIVE JOB PERFORMANCE MEASURE UNIT: 2REV#: 0DATE:SYSTEM/DUTY AREA: Radiation ControlsTASK: Approve administration of Potassium Iodide.JTA#: ANO-SRO-EPLAN-EMERG-292KA VALUE RO:3.4SRO:3.8KA

REFERENCE:

2.3.14APPROVED FOR ADMINISTRATION TO:

RO:SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM: PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE:PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:20 MinutesREFERENCE(S): 1903.035, Administration of Potassium IodideEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 2 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIAL CONDITIONS

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05ci/cc in area of work in Upper SouthPiping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actionsand stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodideif required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will beused in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operationalTASK STANDARD
Correctly completed Potassium Iodide (KI) Administration Form 1903.035A ANDDid not approve the administration of KI to Joe Mechanic.TASK PERFORMANCE AIDS: 1903.0035, Potassium Iodide Administration, Form1903.035C (Completed), ANO Medical Questionnaire-Iodine Sensitivity and Form1903.035A, Potassium Iodide Administration.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 3 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE: Determine if KI, Potassium Iodide, should be issued and completenecessary paperwork, using OP 1903.035.

START TIME:Examiner Note: Provide the examinee a KI Administration Form 1903.035A and a MedicalQuestionnaire-Iodine Sensitivity Form 1903.035C that has been completed by JoeMechanicPERFORMANCE CHECKLIST STANDARD(Circle One)1. Review 1903.035,Administration of PotassiumIodide to determine criteria foradministering KI.(Step 6.1.1 and Step 6.2.3.C.1)Examinee determined thecriteria for administration of KIis 10 REM exposure to thyroidcommitted dose equivalent orif concentration is unknown,the possibility exists forreceiving large amounts ofradioactive airborne iodine.N/A SAT UNSAT (C)2. Using graph on 1903.035Attachment 1 and informationprovided in initial conditions,determine that Joe Mechanicwill exceed 10 REM duringthe maintenance evolution.(Step 6.2.3.B)Determined that expectedexposure will exceed 10 REMthreshold.N/A SAT UNSAT3. Complete form 1903.035A.(Step 6.3)Completed all areas of form1903.035A, Potassium IodideAdministration, from initial conditions: Estimated Thyroid dosecommitment. Date. Respiratory Protection Factor.N/A SAT UNSAT ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 4 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminer Note: Provide the examinee a KI Administration Form 1903.035A and a MedicalQuestionnaire-Iodine Sensitivity Form 1903.035C that has been completed by JoeMechanicPERFORMANCE CHECKLIST STANDARD(Circle One)(C)4. Determine that Joe Mechanicis sensitive to and hasexperienced an allergicreaction to Iodide.Reviewed 1903.035C formand determined that JoeMechanic was sensitive toiodine and has experienced anallergic reaction to iodine in the past.N/A SAT UNSAT (C)5. Determine that KI shouldbe NOT approved fordistribution to JoeMechanic during theUpper South Pipingpenetration work.Examinee did NOT approvedistribution of KI to Joe Mechanic.N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 5 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05ci/cc in area of work in Upper SouthPiping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actionsand stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodideif required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will beused in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operationalINITIATING CUE:Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork,using OP 1903.035.

ANO-2-JPM-NRC-ADMIN-KI2 A4 Page 6 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS

The plant is tripped from 100% power 300 gpm LOCA in progress Loss of Offsite power is in progress LOCA EOP is being implemented RDACS indicates an off site release in progress Data indicates I-131 concentration of 8.0 E-05ci/cc in area of work in Upper SouthPiping Penetration room Whole body dose rates in area of work are 1 Rem/hr Site Area Emergency has been declared RP estimates that it will take approximately 15 minutes to complete emergency actionsand stop the release and all RP required controls/authorizations are complete Joe Mechanic has read the precaution leaflet and has chosen to take Potassium Iodideif required Air Purifying Respirator with Iodine Canister having a protection factor of 1.0 will beused in place of a SCBA due to piping interference EOF, OSC and TSC are being staffed but are NOT operationalINITIATING CUE:Determine if KI, Potassium Iodide, should be issued and complete necessary paperwork,using OP 1903.035.

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 1 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREUNIT: 2 REV#: 004DATE:SYSTEM/DUTY AREA: Emergency PlanTASK: Determine Emergency Action Level/Protective Action Recommendation (Time Critical JPM)JTA#: ANO-SRO-EPLAN-EMERG-278KA VALUERO:2.9SRO:4.6KA

REFERENCE:

2.4.41APPROVED FOR ADMINISTRATION TO: RO:

SRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:BOTH: XSUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:Classroom:PerformPOSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:LAB:TESTING METHOD: SIMULATE:

PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 Minutes - EAL Classification,5 Minutes - BoundarydeterminationREFERENCE(S): 1903.010 Emergency Action Level ClassificationEXAMINEE'S NAME:BADGE:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED INTHIS JPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 2 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIAL CONDITIONS

(Time Critical JPM)A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355°FPZR pressure is 1170 psiaTASK STANDARD: Determined the following (Time Critical - 15 minutes to classify event):Determined SAE (FS-1) is the appropriate EAL. (Time Critical)Determined two or the three fission product barriers are failed or potentially failed. (NotTime Critical) RCB1: RCS leakage > 44 GPM or RCB2: SGTR results in ECCS actuation CNB3: Primary to secondary leak in steam generator > 10 gpm with stuck openmain steam safety valveDetermined that Fuel boundary is not failed. (Time Critical)TASK PERFORMANCE AIDS: 1903.010, Emergency Action Level Classification ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 3 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREINITIATING CUE:Determine the status of thefission product boundaries and the highest EAL classification from the given initialconditions (list EAL classification and event number).START:PERFORMANCECHECKLISTSTANDARD(Circle One)(C)1.Determined "SAE" EALclassification.Using OP 1903.010, determined"SAE" EAL classification FS1, Lossor potential loss of ANY twobarriers.Stop Time:__________

N/A SAT UNSAT (C)2.EAL determination made in15 minutes.EAL determined within 15 minutes.

N/A SAT UNSAT (C)3.Determined RCS barrierstatus.Determined RCS barrier Lost orPotentially Lost using given 200 gpmPri-Sec leak per OP 1903.010,Attachment 2, RCB1. RCS leak > 44gpm with letdown isolated and/orRCB2 SGTR results in ECCSactuation.

N/A SAT UNSAT (C)4.Determined Containmentfission product barrierstatus.Determined Containment barrier lostusing given stuck open main steamsafety valve on Steam Generatorwith pri-sec leak per 1903.010,Attachment 2 CNB3.

N/A SAT UNSAT (C)5.Determined Fuel Cladbarrier status.Determined Fuel Clad barrierNOTLost IAW per 1903.010, Attachment 2.N/A SAT UNSAT ENDSTOP:

ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 4 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminer's CopyThis JPM (Cue #1) is time criticalINITIAL CONDITIONS

A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355°FPZR pressure is 1170 psiaINITIATING CUE #1:Determine the status of the EAL classification and Event number/code from the given initialconditions.EAL ClassEvent number/code SAE FS-1INITIATING CUE #2:Determine the status of the fission product boundaries:Fission product boundary status:(Failed or Intact)Barrier EAL number, code, etc. ifapplicable.ContainmentFailed CNB3 RCSFailedRCB1 and/or RCB2FuelIntactN/A ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 5 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminee's CopyThis JPM is time criticalINITIAL CONDITIONS
A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355°FPZR pressure is 1170 psiaINITIATING CUE #1:Determine the status of the EAL classification from the given initial conditionsEAL ClassificationEvent number/code ANO-2-JPM-NRC-ADMIN-EAL13 A5 Page 6 of 6ADMINISTRATIVE JOB PERFORMANCE MEASUREExaminee's CopyINITIAL CONDITIONS
A plant trip has occurred due to a loss of offsite power with a concurrent SteamGenerator tube rupture on the "B" Steam Generator estimated to be 200 gpm.One Main Steam Safety Valve on the "B" header has stuck open.1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> following the trip, HP reports a reading of 800 mRem/hr at sample line 2TCD-19per chemistry sampling procedureRCS T-cold is 355°FPZR pressure is 1170 psiaINITIATING CUE #2:Determine the status of the fission product boundaries:Fission product boundary status:(Failed or Intact)Barrier EAL number, code, etc. ifapplicable.Containment RCSFuel Revision 1ES-301Control Room/In-Plant Systems OutlineForm ES-301-2Facility: Arkansas Nuclear One Unit 2 Date of Examination: July 2014Exam Level: RO SRO-I SRO-U XOperating Test No.: 2014-2Control Room Systems

@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)System / JPM TitleType Code*Safety Function S1.ANO-2-JPM-NRC-AOP2022 A4.04 RO-3.1/SRO-3.2Reset CIAS and restore cooling water to containmentD/EN/S 5Containment S2.ANO-2-JPM-NRC-AOP5027 AA1.01 RO-4.0/SRO-3.9Respond to a failed close PZR spray valveA/N/S 3Pressure Control S3.ANO-2-JPM-NRC-RCP02003 A4.08 RO-3.2/SRO-2.9Restore component cooling water to reactor coolant pumpsA/D/S 4RCS Heat RemovalS4.S5.S6.S7.S8.In-Plant Systems

@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)P1. ANO-2-JPM-AACFO064 K1.03 RO-3.6/SRO-4.0Control AAC diesel fuel oil day tank level manually.A/D/E/L 6ElectricalP2.ANO-2-JPM-NRC-FPEM1033 A2.03 RO-3.1/SRO-3.5Perform emergency SW make up to SFPE/L/P/R 8Plant servicesystemsP3.@All RO and SRO-I control room (and in-plant) systems must be different and serve different safetyfunctions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions mayoverlap those tested in the control room.* Type CodesCriteria for RO / SRO-I / SRO-U(A)lternate path(C)ontrol room(D)irect from bank(E)mergency or abnormal in-plant(EN)gineered safety feature(L)ow-Power / Shutdown(N)ew or (M)odified from bank including 1(A)(P)revious 2 exams(R)CA(S)imulator4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1 - / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 ANO-2-JPM-NRC-AOP02 S1PAGE 1 OF 7JOB PERFORMANCE MEASUREUNIT: 2 REV#: 002DATE:SYSTEM/DUTY AREA:Containment Cooling Water SystemTASK:Reset CIAS and establish cooling water to containmentJTA#: ANO2-RO-EOPAOP-OFFNORM-219Alternate Path Yes:No: XTime Critical:

Yes:No: XKA VALUERO:3.1SRO:3.2KA

REFERENCE:

022-A4.04APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:

XOUTSIDE CR:BOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformLAB:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANT SITE:LAB:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S):2203.039, Inadvertent CIASEXAMINEE'S NAME:BADGE #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:Start TimeStop TimeTotal Time ANO-2-JPM-NRC-AOP02 S1PAGE 2 OF 7JOB PERFORMANCE MEASUREINITIAL CONDITIONS: An inadvertent CIAS has occurred. Steps 1-10 of 2203.039 Inadvertent CIAS AOP have been completed.TASK STANDARD:CIAS has been reset by performing the following: Unlocking the trip path Depressing the CIAS reset pushbutton on 2C-23B Depressing the CIAS reset pushbutton on 2C-40And Containment Chilled water has been realigned to containment by opening the following valves: 2CV-3851-1 2CV-3852-1 2CV-3850-2TASK PERFORMANCE AIDS:OP-2203.039, Inadvertent CIASSIMULATOR SETUP: Inadvertent CIAS present. Containment parameters are below setpoints, Verify CBO to VCT valve, 2CV-4847-2 handswitch is in CLOSE.EXAMINER NOTES:

None.

ANO-2-JPM-NRC-AOP02 S1PAGE 3 OF 7JOB PERFORMANCE MEASUREINITIATING CUE:The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)EXAMINER's NOTE:Only one channel of PPS is modeled on simulator completely. Correctly resetting of this channel will resetCIAS trip paths.(C)1.(Step 11.A)Reset actuation trip path byusing key 15 to placeLK/UNLK switch in UNLK.Examinee obtained key 15 fromShift Manager.On panel 2C23B examinee placedkey in trip path key switch to UNLK. N/A SAT UNSAT (C)2.(Step 11.B)Depress CIAS pushbutton on 2C23.Examinee depressed CIASpushbutton for trip path. N/A SAT UNSAT 3.(Step 11.C)Place LK/UNLK switch in LKand remove key.Examinee placed trip pathkeyswitch to LK and removed key. N/A SAT UNSAT 4.(Step 11.D)Repeat steps as needed toreset remaining trip paths.Examiners Cue:All four PPS trip pathchannels have been reset.Examinee simulated resetting thethree remaining trip paths. N/A SAT UNSATEXAMINER's NOTE:Only 2C40 is modeled on simulator completely. 2C39 is not modeled on the simulator. Correctly resetting2C40 will reset CIAS actuation paths.(C)5.(Step 12.A)Depress CIAS Lockout Resetpushbutton on 2C40 andverify Reset light ON.Examinee depressed CIAS LockoutReset pushbutton on 2C40 andverified Reset light ON. N/A SAT UNSAT ANO-2-JPM-NRC-AOP02 S1PAGE 4 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 6.(Step 12.B)Depress CIAS Lockout Resetpushbutton on 2C39 andverify Reset light ON.Examiners Cue:2C39 ESF CIAS actuationhas been reset.Examinee simulated depressingCIAS Lockout Reset pushbutton on2C39 and verified Reset light ON. N/A SAT UNSAT 7.(Step 12.C)Go to step 14.Examinee transitioned to step 14. N/A SAT UNSATProcedure Note:Other ESFAS actuations may require resetting before components can be restored.

8.(Step 14)Open RCP Bleedoff to VCTvalve, 2CV-4846-1.On panel 2C17, examinee placedhandswitch for RCP bleedoff toVCT valve 2CV-4846-1 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A SAT UNSAT 9.(Step 14)Open RCP Bleedoff to VCTvalve, 2CV-4847-2.On panel 2C16, examinee placedhandswitch for RCP bleedoff toVCT valve 2CV-4847-2 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A SAT UNSAT (C)10.(Step 15.ABullet 1)Open Chilled water toCNTMT valve 2CV-3851-1.On panel 17, examinee placedhandswitch for Chilled Water toCNTMT Isolation valve2CV-3851-1 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A SAT UNSAT (C)11.(Step 15.ABullet 2)Open Chilled water toCNTMT valve 2CV-3852-1.On panel 17, examinee placedhandswitch for Chilled Water toCNTMT Isolation valve2CV-3852-1 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A SAT UNSAT ANO-2-JPM-NRC-AOP02 S1PAGE 5 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)12.(Step 15.ABullet 3)Open Chilled water toCNTMT valve 2CV-3850-2.On panel 16, examinee placedhandswitch for Chilled Water toCNTMT Isolation valve2CV-3850-2 to OPEN.Examinee observed RED light ONand GREEN light OFF above handswitch. N/A SAT UNSAT 13.(Step 15.B)Verify ONE Main Chiller(2VCH-1A/1B) running.Examiner's note:The red light above handswitch for 2VCH-1Aindicates the chiller isrunning.Examiner's note:The red light for 2HS-3810for 2VCH-1A indicates the2A1 breaker is closed.On panel 2C22, examinee verifiedhandswitch for 2VCH-1A is innormal after start (RED flagged).Examinee observed RED light ONand GREEN light OFF above handswitch for 2VCH-1A.Examinee observed RED light ONand GREEN light OFF above labelfor 2HS-3810.Examinee observed all chilledwater alarms are clear onannunciator 2K13 (Lights slowflashing or clear). N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-AOP02 S1PAGE 6 OF 7JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS: An Inadvertent CIAS has occurred. Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.INITIATING CUE:The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

ANO-2-JPM-NRC-AOP02 S1PAGE 7 OF 7JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL TASK CONDITIONS: An Inadvertent CIAS has occurred. Steps 1-10 of 2203.039, Inadvertent CIAS AOP have been completed.INITIATING CUE:The SM/CRS directs you to perform steps 11 through 15 of 2203.039, Inadvertent CIAS AOP.

ANO-2-JPM-NRC-AOP05 S2PAGE 1 OF 7JOB PERFORMANCE MEASUREUNIT: 2 REV#: 000DATE:SYSTEM/DUTY AREA:PZR spray operationTASK:Respond to a failed closed PZR spray valve.JTA#:Alternate Path Yes:

XNo:Time Critical Yes:No: XKA VALUERO:4.0SRO:3.9KA

REFERENCE:

027 AA1.01APPROVED FOR ADMINISTRATION TO: RO:

XSRO: XTASK LOCATION:INSIDE CR:

XOUTSIDE CR:BOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM:POSITION EVALUATED: RO:SRO:ACTUAL TESTING ENVIRONMENT: SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD: SIMULATE:

PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:10 MinutesREFERENCE(S): 2203.028 PZR Systems MalfunctionEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-AOP05 S2PAGE 2 OF 7JOB PERFORMANCE MEASUREINITIAL CONDITIONS: Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressure and RCSpressure to rise 2CV-4652 'B' RCP spray valve did not open automaticallyTASK STANDARD:Regen HX to RCP B/C valves closed 2CV-4827-2 2CV-4831-2And Aux spray valve 2CV-4824-2 throttled open to restore RCS pressure 2025 to 2275 psia.TASK PERFORMANCE AIDS:2203.028 PZR System MalfunctionsSIMULATOR SETUP:CV4651, value = 0CV4652, value =0Steam dump emergency off actuated.

ANO-2-JPM-NRC-AOP05 S2PAGE 3 OF 7JOB PERFORMANCE MEASUREINITIATING CUE:The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)EXAMINER NOTE: Maintain the simulator in Freeze until the applicant is ready to start.

1.(Step 1)Check the following criteria:

A. IF any PZR spray valvefailed open, THENGO TOStep 2.B. IF any PZR spray valvefailed closed, THEN GO TOStep 4.Determined that the PZR sprayvalve is failed closed andtransitioned to step 4. N/A SAT UNSAT 2.(Step 4.A)IF ANY PZR Spray valve failedclosed, THEN perform thefollowing as needed:Place affected PZR Sprayvalves in MANUAL:2CV-46512CV-4652On panel 2C04, rotatedhandswitch (2HS-4652B) for2CV-4652 to manual. N/A SAT UNSAT (Step 4.B)Throttle PZR Spray valves asnecessary to maintain RCSpressure 2025 psia to 2275psia.On panel 2C04, placedhandswitch for 2CV-4652 to open.Recognized that 2CV-4652 didnot open and pressure iscontinuing to rise. N/A SAT UNSAT 3.(Step 4.B.contingency)IF PZR Spray valves will NOTopen, THEN maintain RCSpressure 2025 psia to 2275psia with Aux Spray using2202.010, Attachment 48, RCSPressure Control.Transitioned to 2202.010,Attachment 48, RCS pressurecontrol. N/A SAT UNSATProcedure Note:Once method of pressure control is established, this attachment is not required in hand orcontinuous use.A change to the method of pressure control will require in hand or continuous use until the new pressurecontrol method is established.

ANO-2-JPM-NRC-AOP05 S2PAGE 4 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 4.(Step 1.A)*Maintain RCS pressure withheaters and spray using one ormore of the following:IF desired to use PZRPressure controller (2PIC-4626A/B), THEN perform thefollowing:Determined that the PZRpressure controller will notcontrol pressure. N/A SAT UNSAT 5.(Step 1.B)IF desired to use PZR Heaters,THEN perform the following:Determined that the PZRheaters will not lower pressure.Examiner note: applicant mayelect to secure heaters but thiswill not maintain pressure in therequired band. N/A SAT UNSAT 6.(Step1.C)IF desired to use NORMALSpray, THEN perform thefollowing:Determined that normal spraywill not control pressure. N/A SAT UNSAT 7.(Step1.D.1)IF desired to use AUXILIARYSpray, THEN perform thefollowing:*Verify RCS MTS greater than 30 degrees.Check SPDS or chart recorderand determined that MTS isgreater than 30 degrees. N/A SAT UNSAT 8.(Step1.D.2)Verify at least ONE Chargingpump running.Checked at least one chargingpump running by red light on2P-36A, B, or CAlso verified flow on 2FI-4863 orcomputer (not critical) N/A SAT UNSAT(C) 9.(Step1.D.3)Close Regen HX to RCP B/Cvalves: 2CV-4827-2 2CV-4831-2On panel 2C09, placedhandswitch for 2CV-4827-2 toclose.On panel 2C09, placedhandswitch for 2CV-4831-2 toclose. N/A SAT UNSATProcedure Note:PZR Spray Block valves 2CV-4653 and 2CV-4655 are de-energized due to degraded power supply cables 10.(Step1.D.4)Verify PZR Spray(2CV-4651/2CV-4652) or PZRSpray Isolation valves(2HS-4655/2HS-4653) closed.On panel 2C04, verified 2CV-4651 and 2CV-4652 closed bygreen light on and red light off. N/A SAT UNSAT ANO-2-JPM-NRC-AOP05 S2PAGE 5 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C) 11.(Step1.D.5)Throttle Aux Spray valve(2CV-4824-2) as necessary.Examiner Cue:If asked CRS will direct aband of 2175 to 2225 psia.On panel 2C09, Throttled 2CV-4824-2 open to restore andcontrol RCS pressure 2025 to2275 psia. N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-AOP05 S2PAGE 6 OF 7JOB PERFORMANCE MEASUREEXAMINER's COPYINITIAL CONDITIONS: Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressureand RCS pressure to rise 2CV-4652 'B' RCP spray valve did not open automaticallyINITIATING CUE:The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

ANO-2-JPM-NRC-AOP05 S2PAGE 7 OF 7JOB PERFORMANCE MEASUREEXAMINEE's COPYINITIAL CONDITIONS: Mode 3 2P-32A and D Reactor Coolant pumps are secured in preps for cooldown The Steam Dump Bypass Control System has failed causing Steam Generator pressureand RCS pressure to rise 2CV-4652 'B' RCP spray valve did not open automaticallyINITIATING CUE:The CRS directs you to control RCS pressure using 2203.028 PZR System Malfunction AOP.

ANO-2-JPM-NRC-RCP02 S3PAGE 1 OF 7JOB PERFORMANCE MEASUREUNIT: 2REV #: 007DATE:SYSTEM/DUTY AREA:Reactor Coolant PumpsTASK:Restore component cooling water to reactor coolant pumpsJTA#:ANO2-RO-EOPAOP-EMERG-32Alternate Path Yes:X No:Time Critical:

Yes:No: XKA VALUERO:3.2SRO:2.9KA

REFERENCE:

003 A4.08APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:

XOUTSIDE CR:BOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SIMULATOR:PerformCLASSROOM:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANTSITE:CLASSROOM:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:15 MinutesREFERENCE(S):2202.010 Attachment 21EXAMINEE'S NAME:BADGE# :EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED INTHIS JPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-RCP02 S3PAGE 2 OF 7JOB PERFORMANCE MEASUREINITIAL CONDITIONS

2A1 is re-energized from SU#2 following a degraded power situation2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pump has been restored Service water has been aligned to CCWTASK STANDARD:Controlled bleed off isolated to VCT and CBO relief valve isolated by closing the following valves: 2CV-4846-1 or 2CV-4847-2 and 2CV-4856TASK PERFORMANCE AIDS:2202.010 Attachment 21SIMULATOR SETUP:Set up CCW valves per EOP 2202.010 Attachment 29 "STARTUP XFM# 2 USAGE" perform actions throughstep 1.M.6. Close RCP CCW RETURN valve, 2CV-5255-1, 2CV-5254-2 and2CV-5236-1. NO SIAS actuation and RCP seal temperatures >180.Set T4 = 2CV 5255 red light. When 2CV 5255-1 is taken to open position, it will trip the breakerT4=DO_HS_5255_R off (override)T4=DO_HS_5255_G off (override)T4=CV52551 = 0.0% (component malfunction)

ANO-2-JPM-NRC-RCP02 S3PAGE 3 OF 7JOB PERFORMANCE MEASUREINITIATING CUE:The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21 starting with step 2.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One) 1.(Step 2 A)Align Controlled Bleedoff asfollows:IF SIAS OR CIAS NOTactuated,THEN verify RCP Bleedoff toVCT valves open:2CV-4846-12CV-4847-2On panel 2C16 verified2CV-4847-2 red light on; controlswitch in OPEN.On panel 2C17, verified2CV-4846-1 red light on. N/A SAT UNSAT 2.(Step 2 B)Verify RCP Bleed-off ReliefIsolation to Quench Tank open.On panel 2C09, verified2CV-4856 red light on; key-switch in LOCKED OPEN. N/A SAT UNSAT 3.(Step 3)IF RCP seal temperatures lessthan 180°F,THEN restore CCW to RCPsby performing the following:On panel 2C14 or on PMScomputer determined RCP sealtemperatures greater than 180 0 F N/A SAT UNSAT 4.(Step 4 A)IF RCP seal temperatures180°F or greater,THEN restore CCW to RCPsas follows:Verify RCP CCW Return valve(2CV-5255-1) CLOSED.On panel 2C17, verified2CV-5255-1 closed.Observed green light ON; redlight OFF above handswitch. N/A SAT UNSAT (C)5.(Step 4 B)Verify RCP CCW Supply valve(2CV-5236-1) open.On panel 2C17, placedhandswitch for 2CV-5236-1 in "OPEN".Observed green light OFF; redlight ON. N/A SAT UNSAT ANO-2-JPM-NRC-RCP02 S3PAGE 4 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)6.(Step 4 C)Verify RCP CCW Return valve(2CV-5254-2) open.On panel 2C16, Verifiedhandswitch for 2CV-5254-2"OPEN".Observed green light OFF; redlight ON. N/A SAT UNSATEXAMINER'S NOTE:When 2CV-5255-1 is taken to OPEN, the breaker will trip and cannot be reset. The valve will be boundclosed.(C)7.(Step 4 D)Throttle open RCP CCWReturn valve (2CV-5255-1)with a single 1 secondmodulation.Examiner Cue:If WCO sent to the valvereport that 2CV-5255-1indicates closed.If asked 2CV-5255-1 cannotbe opened.If AO sent to the breaker,2B53-G4 report that it isopen. If asked the breakerfor 2CV-5255-1 cannot be reset.On panel 2C17, took handswitchfor 2CV-5255-1 to "OPEN" forone (1) second then released.Observed red and green lights OFF.EXAMINEE may ask to dispatcha NLO to the valve and orbreaker. N/A SAT UNSATEXAMINER'S NOTE:The examinee may elect to monitor RCP seal cooldown before making the decision that CCW cannot berestored. This monitoring of RCP seal cooldown may take 10 minutes to validate that 2CV-5255-1 did not open.The examinee should go to step 5 of Attachment 21.

8.(Step 5)IF EITHER of the followingoccur, CCW to RCPs can NOTbe restored CCW Surge Tank levelslower to 13% followingrestoration THEN verify ALL RCPsstopped.On panel 2C04, observed2P32A, B, C, and D RCPhandswitches in STOP or PTL.Observed handswitch is greenflagged; green light ON and redlight OFF. N/A SAT UNSAT ANO-2-JPM-NRC-RCP02 S3PAGE 5 OF 7JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 9.(Step 5 A)Isolate CCW to RCPs byclosing the following valves: Close 2CV-5254-2. Close 2CV-5236-1.On panel 2C16, placedhandswitch for 2CV-5254-2 to"CLOSE"Observed green light ON; redlight OFF.On panel 2C17, placedhandswitch for 2CV-5236-1 to"CLOSE"Observed green light ON; redlight OFF. N/A SAT UNSAT (C)10.(Step 5 B.1)Isolate Controlled Bleedoff asfollows:Verify RCP Bleedoff to VCTvalves closed: 2CV-4846-1 2CV-4847-2Examiner Note: It is criticalto close only one valve.On panel 2C17, placedhandswitch for 2CV-4846-1 to"CLOSE."On panel 2C16, placedhandswitch for 2CV-4847-2 to"CLOSE."For each valve, observed greenlight ON; red light OFF. N/A SAT UNSAT (C)11.(Step 5 B.2)Close RCP bleedoff reliefisolation to quench tank valve(2CV-4856).On panel 2C09, placedhandswitch for 2CV-4856 to"CLOSE"Observed green light ON; redlight OFF. N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-RCP02 S3PAGE 6 OF 7JOB PERFORMANCE MEASUREEXAMINER'S COPYINITIAL CONDITIONS: 2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCWINITIATING CUE:The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21starting with step 2.

ANO-2-JPM-NRC-RCP02 S3PAGE 7 OF 7JOB PERFORMANCE MEASUREEXAMINEE'S COPYINITIAL CONDITIONS: 2A1 is re-energized from SU#2 following a degraded power situation 2202.010 ATT. 29 steps up to 1.M.7 have been completed CCW pumps have been restored Service water has been aligned to CCWINITIATING CUE:The SM/CRS directs you to restore CCW to the RCP's using EOP 2202.010 Attachment 21starting with step 2.

ANO-2-JPM-NRC-AACFO P1PAGE 1 OF 8JOB PERFORMANCE MEASUREUNIT: 2 REV#: 002DATE:SYSTEM/DUTY AREA:Emergency Diesel Generator SystemTASK:Control AAC diesel engine fuel oil day tank level manuallyJTA#: ANO2-AO-AACDG-OFFNORM-24Alternate Path Yes:

XNo:Time Critical:

Yes:No: XKA VALUERO:3.1SRO:3.5KA

REFERENCE:

064 K1.03APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:

XBOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SimulateSIMULATOR:CLASSROOM:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:20 MinutesREFERENCE(S):2203.012Z Annunciator 2C435 Corrective ActionEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-AACFO P1PAGE 2 OF 8JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS: The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarmTASK STANDARD:Performed either of the following to restore day tank level:Opened/throttled 2AAC-17 to restore day tank level 40 to 84%, and then closed 2AAC-17.Or, started 2P-235 to restore day tank level to 40% to 84%, and the secured 2P-235.TASK PERFORMANCE AIDS:2203.012Z Annunciator 2C435 Corrective Action SIMULATOR SETUP:N/A ANO-2-JPM-NRC-AACFO P1PAGE 3 OF 8JOB PERFORMANCE MEASUREINITIATING CUE:The SM/CRS directs you to locally identify the cause of the AAC SYSTEM TROUBLE alarm and take correctiveactions.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)1. Locally identify the cause ofthe AAC System Troublealarm.Examiner Cue:Demonstrate to the applicantthat 2K432-E2 is in alarm.At Panel 2C435, locally checkedannunciator panel to determinecause of alarm to be 2K432-E2,Fuel Oil Day Tank Level Low.

N/A SAT UNSAT 2.(Step 2.1)Check PLC touchpad and/orFuel Day Tank levelindications: Fuel Oil Day Tanklevel (2LI-7201A) Fuel Oil Day Tanklevel (2LI-7201B) Day Tank Level (L7201)Examiner Cue:The local tank level indicator(2LI-7201B) shows 15%.

OROn panel 2C442, 2LI-7201Ashows 15%.

OROn the PLC for L7201,observed the fuel oil daytank level shows 15%.On 2LI-7201A at panel 2C442,examinee observed the fuel oilday tank level shows < 20%.

OROn 2LI-7201B in the engineroom, examinee observed thefuel oil day tank level shows< 20%.OROn the Local Computer forL7201, examinee observed thefuel oil day tank level shows< 20%. N/A SAT UNSAT 3.(Step 2.2.1)Verify T-25 outlet (FO-37)

OPEN.Examiner Cue:FO-37, T-25 outlet, is OPEN.Located deck plate for FO-37. N/A SAT UNSATEXAMINER'S NOTE:The first path chosen to restore day take level will fail the applicant should then chose the other pathto restore day tank level. If it the first path chosen provide the negative cue, and if it is the secondpath chosen provide the positive cue.

ANO-2-JPM-NRC-AACFO P1PAGE 4 OF 8JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)4.(Step 2.2.2)If using Fuel Transfer pump(2P-235), then start from eitherof the following: 2HS-7106A on 2C440 2HS-7106B on 2B161-D5Examiner Cue:If asked 2B161-D5 is closedwith green light on, andthere are no problems notedlocally with 2P-235.Negative Examiner Cue:When 2HS-7106A on 2C-440is taken to MANUAL, THENindicate that tank level doesnot increase and 2P-235 fueltransfer pump is notrotating.orWhen 2HS-7106B on 2B116is taken to MANUAL, THENindicate that tank level doesnot increase and 2P-235 fueltransfer pump is notrotating.Positive Examiner Cue:When 2HS-7106A on 2C-440is taken to MANUAL, THENindicate that tank level isrising and indicates 70%

orWhen 2HS-7106B on 2B116is taken to MANUAL, THENindicate that tank level isrising and indicates 70%.On 2C-440 rotated 2HS-7106Ato MANUAL.

OROn 2B116 rotated 2HS-7106B toMANUAL.This step is critical if it is thesecond path attempted toraise level. N/A SAT UNSATTRANSITION NOTE:Go to the AAC diesel generator engine room.

ANO-2-JPM-NRC-AACFO P1PAGE 5 OF 8JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One)(C)5.(Step 2.2.3)If using Fuel Oil Header 2T-11Bypass, then open Fuel OilHeader 2T-11 Bypass(2AAC-17).Positive Examiner Cue:When 2AAC-17 is simulatedopening, Then indicate2AAC-17 turns in the CCWdirection and tank level isrising and indicates 70%.Negative Examiner Cue:When 2AAC-17 is simulatedopening, Then indicate that2AAC-17 handwheel isspinning freely and tanklevel does not increase.Turned 2AAC-17 operatinghandle CCW to the full openposition.ORThrottled 2AAC-17 to increaseday tank level.Checked Fuel Oil Day Tank(2T-11) level rising.This step is critical if it is thesecond path attempted toraise level. N/A SAT UNSAT (C)6.(Step 2.2.4)When Fuel Day Tank level(2LT-7201) 40 to 84%, THENperform EITHER of thefollowing: Stop Fuel Transferpump (2P-235) fromeither of the following:

o 2HS-7106A on 2C440 o 2HS-7106B on2B161-D5 Close Fuel Oil Header2T-11 Bypass(2AAC-17).Examiner Cue:Give either of the followingcues based on method usedto raise tank level.If 2AAC-17 is taken to close,then 2AAC-17 shut seat isfelt and the valve operatinghandle will NOT turn furtherand tank level is stable.

OrIf 2P-235 HS is taken to stop,then 2P-235 stops runningwhen the HS is taken tostop.WHEN 2T-11 level is > 40%,examinee rotated 2AAC-17 CWto close. N/A SAT UNSAT ANO-2-JPM-NRC-AACFO P1PAGE 6 OF 8JOB PERFORMANCE MEASUREPERFORMANCE CHECKLISTSTANDARDS(Circle One) 7.(Step 3.2)Depress Reset PLC touchpad.Examiner Cue:PLC touchpad depressed.Alarm for Low Day TankLevel is clear.At the local computer touchedscreen, depressed the PLCtouchpad or usedacknowledge/reset switch toreset PLC. N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-AACFO P1PAGE 7 OF 8JOB PERFORMANCE MEASUREExaminer's CopyINITIAL CONDITIONS: The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarmINITIATING CUE:The SM/CRS directs you to locally identify the cause of the AAC SYSTEMTROUBLE alarm and take corrective actions.

ANO-2-JPM-NRC-AACFO P1PAGE 8 OF 8JOB PERFORMANCE MEASUREExaminee's CopyINITIAL CONDITIONS: The plant has tripped Offsite power is not available Neither EDG is running The AAC Diesel is running and aligned to 2A3 and has been in service for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Annunciator 2K12-K2, AAC SYSTEM TROUBLE, is in alarmINITIATING CUE:The SM/CRS directs you to locally identify the cause of the AAC SYSTEMTROUBLE alarm and take corrective actions.

ANO-2-JPM-NRC-FPEM1 P2PAGE 1 OF 8JOB PERFORMANCE MEASUREUNIT: 2 REV#: 013DATE:SYSTEM/DUTY AREA:Spent Fuel Pool Cooling SystemTASK:Perform service water emergency makeup to the SFP (with Loop 1 service water)JTA#: ANO2-WCO-SFP-EMER1Alternate Path Yes:No: XTime Critical:

Yes:No: XKA VALUERO:3.1SRO:3.5KA

REFERENCE:

033 A2.03APPROVED FOR ADMINISTRATION TO:RO: XSRO: XTASK LOCATION:INSIDE CR:OUTSIDE CR:

XBOTH:SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):PLANT SITE:SimulateSIMULATOR:CLASSROOM:POSITION EVALUATED:RO:SRO:ACTUAL TESTING ENVIRONMENT:SIMULATOR:PLANT SITE:CLASSROOM:TESTING METHOD:SIMULATE: PERFORM:APPROXIMATE COMPLETION TIME IN MINUTES:20 MinutesREFERENCE(S):2104.006 Fuel Pool SystemsEXAMINEE'S NAME:Badge #:EVALUATOR'S NAME:THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THISJPM AND IS DETERMINED TO BE:SATISFACTORY:UNSATISFACTORY:PERFORMANCE CHECKLIST COMMENTS:StartTime StopTimeTotal Time ANO-2-JPM-NRC-FPEM1 P2PAGE 2 OF 8JOB PERFORMANCE MEASUREJPM INITIAL TASK CONDITIONS:(2K11-K5) "FUEL POOL TEMP HI" is in alarmNeither fuel pool cooling pump is availableAn operator is stationed at the spent fuel pool to monitor spent fuel pool levelFuel pool level is low2P66 is aligned to the RWT and runningYou are the on watch WCO operatorExaminer Note: Approved protected train paperwork will be provided to the examiner to allow entrypast protected equipment postings for completion of this JPM.TASK STANDARD:Aligned Emergency SFP makeup from Loop 1 service water has been commenced by verifying RWTrecirc valves are closed, Fuel Pool makeup valves open (2FP-31, 2FP-46, 2SW-57), Service water drainvalve closed 2SW-8401, and 2SW-138 throttled open to raise SFP level.TASK PERFORMANCE AIDS:2104.006 Fuel Pool Systems Section 14.3.Do not use a cloth lanyard in a Radiologically controlled area.

SIMULATOR SETUP:N/A ANO-2-JPM-NRC-FPEM1 P2PAGE 3 OF 8JOB PERFORMANCE MEASUREThe CRS directs you to Align Loop 1 service water to provide emergency makeup to the spent fuel pool startingon step 14.3 of 2104.006 Fuel Pool Systems.START TIME:PERFORMANCE CHECKLISTSTANDARDS(Circle One)Examiner Note:Ladders in the aux building are controlled by both Operations and RP. Operations dept. has keys to theladders but if access is needed greater than 8' RP must be contacted.

1.(Step 14.3.1)IF SFP or RWT aligned forPurification, THEN secure FuelPool Purification pump 2P-66(2HS-5411) to prevent rapiddepletion of Fuel Pool DI (2T-5)or addition of Service Water tothe RWT.Examiner Cue:After the pump is simulated tobe stopped Report Green lightON, red light OFF.Locally rotated 2P66 handswitch(2HS-5411) to STOP andreleased.Observed green light ON, red light OFF. N/A SAT UNSATTRANSITION NOTE:Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery.

2.(Step 14.3.2)Verify the following valvesclosed:Borated MU or RWT to 2P-66(2FP-32)Examiner Cue:2FP-32 stem is fully insertedand resistance is felt.Closed 2FP-32 by turninghandwheel clockwise andobserving valve stem insertionuntil resistance felt.

N/A SAT UNSATTRANSITION NOTE:Go to elevation 335' RAB just off elevator 3.(Step 14.3.2)Verify the following valvesclosed:RWT Recirculation Isolation(2CV-5637-1).Examiner Cue:Control room reports 2CV-5637-1 indicates closed.Or locally at the valve, thestem fully down/inserted.Contacted Control Room to close2CV-5637-1. N/A SAT UNSAT ANO-2-JPM-NRC-FPEM1 P2PAGE 4 OF 8JOB PERFORMANCE MEASURE 4.(Step 14.3.2)Verify the following valvesclosed:RWT Recirculation Isolation(2CV-5638-2) closed.Examiner Cue:Control room reports 2CV-5638-2 indicates closed.Or locally at the valve, thestem fully down/inserted.Contacted Control Room to close2CV-5638-2. N/A SAT UNSATTRANSITION NOTE:Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery. (C)5.(Step 14.3.3)Open Borated MU, RWT, SW toFuel Pool (2FP-31).Examiner Cue:2FP-31 stem is fully extended.Opened 2FP-31 by turninghandwheel CCW.Observed valve stem fullywithdrawn out of the valve. N/A SAT UNSAT (C)6.(Step 14.3.4)Open RWT to Fuel Pool Isolation(2FP-46).Examiner Cue:2FP-46 stem is fully extended.Opened 2FP-46 by turninghandwheel CCW.Observed valve stem fullywithdrawn out of the valve. N/A SAT UNSATTRANSITION NOTE:Go to elevation 335' RAB just off elevator.(C)7.(Step 14.3.5)Close SW Header 1 TelltaleDrain (2SW-8401).Examiner Cue:2SW-8401 has stem insertedinto handwheel and resistanceis felt.Closed 2SW-8401 by turninghandwheel CW.Observed valve stem fullyinserted into the valve. N/A SAT UNSAT 8.(Step 14.3.6.A)Record unlocking of SW Hdr 1Emerg Feed Isol (2SW-57)in Cat E log.Examiner Cue:2SW-57 has been recorded inthe Cat E log.Contacted the Control Room torecord 2SW-57 in the Cat E log. N/A SAT UNSAT ANO-2-JPM-NRC-FPEM1 P2PAGE 5 OF 8JOB PERFORMANCE MEASURE (C)9.(Step 14.3.6.B)Unlock andopen SW Header 1Emergency Feed Isolation (2SW-57).Examiner Cue:2SW-57 is unlocked and valvestem is fully extended.Unlocked locking device on2SW-57 using category "E" valve key.Opened 2SW-57 by turninghandwheel CCW.Observed valve stem fullywithdrawn out of the valve. N/A SAT UNSAT ANO-2-JPM-NRC-FPEM1 P2PAGE 6 OF 8JOB PERFORMANCE MEASUREProcedure Caution: If SFP overfilled, water can spill through SFP Cooling/SFP Purification pipe chase (SFP, ~ 402', SW corner)and contaminate SFP valve gallery (AB 354') and hall near 2F-3A/B (AB 335') If flow introduced with level > 401' 7", some overflow can occur due to wave motion of water.Procedure Note:If CLP (2LI-5400) used as SFP level indication during SFP drain and fill evolutions, SFP and CLP levels willdiffer slightly until water levels equalize through seal area.

10.(Step 14.3.7.A)IF two Operators available,THEN establish and maintain thefollowing:Operator stationed at SFP tocontinuously monitor level:SFP (2LI-5401)CLP (2LI-5400) if gate removedor deflatedExaminer Cue:Operator is stationed at SFP tomonitor level responds toradio communications.Verified that an Operator wasstationed to monitor SFP level N/A SAT UNSAT 11.(Step 14.3.7.B)Operator stationed at SFP SWHdr 1 Emerg Feed Isol toSF Pool (2SW-138) for valveadjustment.Examinee positions self at 2SW-138. N/A SAT UNSAT 12.(Step 14.3.7.C)Communications betweenstationed Operators.Examiner Cue:Operator that stationed at SFPto monitor level responds toradio communications.Examinee establishescommunication with Operatorstationed at the Spent Fuel Pool N/A SAT UNSAT 13.(Step 14.3.7.D)*IF level being maintainedwithout frequent valveadjustment,THEN the following may beperformed:Secure Operator at 2SW-138.Reassign remaining Operator tocontinuously monitor SFP levelEXCEPT when 2SW-138adjustment needed.Examiner Cue:Operator at SFP will monitor iflevel can be maintainedwithout frequent adjustmentsExaminee assesses level beingmaintained. N/A SAT UNSATEXAMINERS NOTE:

-Final valve position is at discretion of examinee to ensure level is raised/maintained.

ANO-2-JPM-NRC-FPEM1 P2PAGE 7 OF 8JOB PERFORMANCE MEASURE 14.(Step 14.3.8)IF two Operators NOT available,THEN perform the following:Obtain SM/CRS concurrence.Station one Operator to align forfill and continuously monitor levelEXCEPT when adjusting valve.Determined that two operators areavailable from initial conditions. N/A SAT UNSAT (C)15.(Step 14.3.9)Throttle open SW Header 1Emergency Feed Isolation to SFPool (2SW-138) between 401'4"and 401'7".Examiner Cue:Operator stationed at SFPreports level rising slowly.Throttled open 2SW-138 byturning handwheel CCW.Observed valve stem withdrawnout of the valve commensuratewith valves throttling. N/A SAT UNSAT ENDSTOP TIME:

ANO-2-JPM-NRC-FPEM1 P2PAGE 8 OF 8JOB PERFORMANCE MEASUREExaminer's CopyExaminer Note: Approved protected train paperwork will beprovided to the examiner to allow entry past protected equipmentpostings for completion of this JPM.INITIAL CONDITIONS: (2K11-K5) "FUEL POOL TEMP HI" is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool levelFuel pool level is low2P66 is aligned to the RWT and running You are the on watch WCO operatorINITIATING CUE:The CRS directs you to align Loop 1 service water to provide emergency makeup to the spentfuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.

ANO-2-JPM-NRC-FPEM1 P2PAGE 9 OF 8JOB PERFORMANCE MEASUREExaminee's CopyINITIAL CONDITIONS: (2K11-K5) "FUEL POOL TEMP HI" is in alarm Neither fuel pool cooling pump is available An operator is stationed at the spent fuel pool to monitor spent fuel pool levelFuel pool level is low2P66 is aligned to the RWT and running You are the on watch WCO operatorINITIATING CUE:The CRS directs you to align Loop 1 service water to provide emergency makeup to the spentfuel pool starting on step 14.3 of 2104.006 Fuel Pool Systems.