| title = Dresden Nuclear Power Station, Units 1, 2 & 3, Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
| title = Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
| author name =  
| author name =  
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter: DRESDEN - UFSAR   17.0  QUALITY ASSURANCE  TABLE OF CONTENTS Page  17-i  17.0 QUALITY ASSURANCE  17.1-1  17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION  17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE  17.2-1  17.2.1 References  17.2-2 DRESDEN - UFSAR    17.1-1  17.0  QUALITY ASSURANCE  17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION The Quality Assurance Program in place during the design, construction, equipment supply and installation, preoperational testing, and startup of Dresden Station is described in Appendix E of the FSAR.
{{#Wiki_filter:DRESDEN - UFSAR 17.0  QUALITY ASSURANCE  TABLE OF CONTENTS Page  17-i  17.0 QUALITY ASSURANCE  17.1-1  17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION  17.1-1  
DRESDEN - UFSAR Rev. 6  June 2005    17.2-1  17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE    The Quality Assurance (QA) Program for the operations phase of Dresden Station is conducted in accordance with Quality Assurance Topical Report, NO-AA-10[1]. This topical report was initially submitted to the NRC in June 1975 for review. The NRC found the CECo QA Program described in the topical report acceptable for the design, procurement, construction, and operational activities within CECo's scope-of-work for the nuclear stations, and provided instructions that CECo only need to reference Topical Report CE A in Section 17 of license applications. Topical Report NO-AA-10 is periodically updated to address changes in the Exelon Nuclear organization and current standards, including those necessary to satisfy regulatory requirements. Therefore, Topical Report NO-AA-10 and all subsequent revisions are the basis for the QA Program at Dresden Station. Since Topical Report NO-AA-10 is a generic document applicable to all Exelon Nuclear stations regardless of vintage, Chapter 2 and Appendix C of this topical report identifies specific QA-related Regulatory Guides, ANSI standards, and revisions that apply to the respective nuclear stations. When conflicts exist, the Dresden UFSAR and Technical Specifications take precedence over NO-AA-10.
DRESDEN - UFSAR Rev. 6  June 2005    17.2-2  17.2.1 References  1. Exelon Nuclear Quality Assurance Topical Report NO-AA-10, "Quality Assurance Program for Nuclear Generating Stations" (current revision). 


}}
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE  17.2-1  17.2.1 References  17.2-2 DRESDEN - UFSAR 17.1-1  17.0  QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION
 
The Quality Assurance Program in place during the design, construction, equipment supply and installation, preoperational testing, and startup of Dresden Station is described in Appendix E of the FSAR.
DRESDEN - UFSAR Rev. 6  June 2005    17.2-1  17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Quality Assurance (QA) Program for the operations phase of Dresden Station is conducted in accordance with Quality Assurance Topical Report, NO-AA-10
[1]. This topical report was initially submitted to the NRC in June 1975 for review. The NRC found the CECo QA Program described in the topical report acceptable for the design, procurement, construction, and operational activities within CECo's scope-of-work for the nuclear stations, and provided instructions that CECo only need to reference Topical Report CE-1-A in Section 17 of license applications.
Topical Report NO-AA-10 is periodically updated to address changes in the Exelon Nuclear organization and current standards, including those necessary to satisfy regulatory requirements. Therefore, Topical Report NO-AA-10 and all subsequent revisions are the basis for the QA Program at Dresden Station. Since Topical Report NO-AA-10 is a generic document applicable to all Exelon Nuclear stations regardless of vintage, Chapter 2 and Appendix C of this topical report identifies specific QA-related Regulatory Guides, ANSI standa rds, and revisions that apply to the respective nuclear stations. When conflicts exist, the Dresden UFSAR and Technical Specifications take precedence over NO-AA-10.
 
DRESDEN - UFSAR Rev. 6  June 2005    17.2-2  17.2.1 References
: 1. Exelon Nuclear Quality Assurance Topical Report NO-AA-10, "Quality Assurance Program for Nuclear Generating Stations" (current revision).}}

Latest revision as of 05:31, 16 March 2019

Revision 12 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML17179A641
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/21/2017
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards
Shared Package
ML17179A528 List:
References
RS-17-082
Download: ML17179A641 (4)


Text

DRESDEN - UFSAR 17.0 QUALITY ASSURANCE TABLE OF CONTENTS Page 17-i 17.0 QUALITY ASSURANCE 17.1-1 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1-1

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE 17.2-1 17.2.1 References 17.2-2 DRESDEN - UFSAR 17.1-1 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION

The Quality Assurance Program in place during the design, construction, equipment supply and installation, preoperational testing, and startup of Dresden Station is described in Appendix E of the FSAR.

DRESDEN - UFSAR Rev. 6 June 2005 17.2-1 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The Quality Assurance (QA) Program for the operations phase of Dresden Station is conducted in accordance with Quality Assurance Topical Report, NO-AA-10

[1]. This topical report was initially submitted to the NRC in June 1975 for review. The NRC found the CECo QA Program described in the topical report acceptable for the design, procurement, construction, and operational activities within CECo's scope-of-work for the nuclear stations, and provided instructions that CECo only need to reference Topical Report CE-1-A in Section 17 of license applications.

Topical Report NO-AA-10 is periodically updated to address changes in the Exelon Nuclear organization and current standards, including those necessary to satisfy regulatory requirements. Therefore, Topical Report NO-AA-10 and all subsequent revisions are the basis for the QA Program at Dresden Station. Since Topical Report NO-AA-10 is a generic document applicable to all Exelon Nuclear stations regardless of vintage, Chapter 2 and Appendix C of this topical report identifies specific QA-related Regulatory Guides, ANSI standa rds, and revisions that apply to the respective nuclear stations. When conflicts exist, the Dresden UFSAR and Technical Specifications take precedence over NO-AA-10.

DRESDEN - UFSAR Rev. 6 June 2005 17.2-2 17.2.1 References

1. Exelon Nuclear Quality Assurance Topical Report NO-AA-10, "Quality Assurance Program for Nuclear Generating Stations" (current revision).