Line 37: |
Line 37: |
| ==1.0 DESCRIPTION== | | ==1.0 DESCRIPTION== |
|
| |
|
| ===2.0 PROPOSED===
| | ==2.0 PROPOSED CHANGE== |
| CHANGE 3.0 BACKGROUND
| | |
| | ==3.0 BACKGROUND== |
|
| |
|
| ===4.0 TECHNICAL=== | | ===4.0 TECHNICAL=== |
Line 58: |
Line 59: |
| ==1.0 DESCRIPTION== | | ==1.0 DESCRIPTION== |
|
| |
|
| The proposed amendment would delete those portions of the Technical Specifications (TS) superseded by 10 CFR Part 26, Subpart I. This change is consistent with NRC approved Revision 0 to Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-51 1, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." A single enhancement to the proposed NRC staff's model safety evaluation is described in Section 2.0. The availability of this TS improvement was announced in the Federal Register on December 30, 2008, (73 FR 79923) as part of the Consolidated Line Item Improvement Process (CLIIP).2.0 PROPOSED CHANGE Consistent with the NRC approved Revision 0 of TSTF-51 1, the proposed TS changes delete those portions of TS superseded by 10 CFR Part 26, Subpart I.This application is being made in accordance with the CLIIP. Arizona Public Service Company (APS) is proposing a single enhancement to the proposed NRC staffs model Safety Evaluation (SE) published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability. | | The proposed amendment would delete those portions of the Technical Specifications (TS) superseded by 10 CFR Part 26, Subpart I. This change is consistent with NRC approved Revision 0 to Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-51 1, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." A single enhancement to the proposed NRC staff's model safety evaluation is described in Section 2.0. The availability of this TS improvement was announced in the Federal Register on December 30, 2008, (73 FR 79923) as part of the Consolidated Line Item Improvement Process (CLIIP). |
| | |
| | ==2.0 PROPOSED CHANGE== |
| | Consistent with the NRC approved Revision 0 of TSTF-51 1, the proposed TS changes delete those portions of TS superseded by 10 CFR Part 26, Subpart I.This application is being made in accordance with the CLIIP. Arizona Public Service Company (APS) is proposing a single enhancement to the proposed NRC staffs model Safety Evaluation (SE) published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability. |
| The deviation from the model SE published in the FR notice is that the proposed commitment to implement the approved TS changes has been enhanced to state that implementation would be concurrent with or after implementation of the new 10 CFR 26, Subpart I, requirements, since this amendment may not be approved until after the October 1, 2009, final rule required implementation date. In the event NRC approval for the requested amendment is not obtained before October 1, 2009, the amendment shall be implemented within 30 days of NRC approval and APS shall comply with the new 10 CFR 26, Subpart I, requirements and current Technical Specifications until the approved TS changes are implemented. | | The deviation from the model SE published in the FR notice is that the proposed commitment to implement the approved TS changes has been enhanced to state that implementation would be concurrent with or after implementation of the new 10 CFR 26, Subpart I, requirements, since this amendment may not be approved until after the October 1, 2009, final rule required implementation date. In the event NRC approval for the requested amendment is not obtained before October 1, 2009, the amendment shall be implemented within 30 days of NRC approval and APS shall comply with the new 10 CFR 26, Subpart I, requirements and current Technical Specifications until the approved TS changes are implemented. |
|
| |
|
| ==3.0 BACKGROUND== | | ==3.0 BACKGROUND== |
| | |
| The NRC issued a Federal Register notice (73 FR 16966, March 31, 2008) of the issuance of a final rule that amended 10 CFR Part 26. The revised regulations in 10 CFR Part 26, Subpart I, supersede working hour restrictions contained in paragraph d of TS 5.2.2. The background for this application is adequately addressed by the NRC Notice of Availability published on December 30, 2008 (73 FR 79923).4.0 TECHNICAL ANALYSIS APS has reviewed the model SE published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability. | | The NRC issued a Federal Register notice (73 FR 16966, March 31, 2008) of the issuance of a final rule that amended 10 CFR Part 26. The revised regulations in 10 CFR Part 26, Subpart I, supersede working hour restrictions contained in paragraph d of TS 5.2.2. The background for this application is adequately addressed by the NRC Notice of Availability published on December 30, 2008 (73 FR 79923).4.0 TECHNICAL ANALYSIS APS has reviewed the model SE published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability. |
| APS has concluded that the technical justifications presented in the model SE prepared by the NRC staff are applicable to PVNGS Units 1,2, and 3.2 Attachment 1 License Amendment Request for Adoption of TSTF-51 1, Revision 0 10 CFR Part 26, Subpart I, supersedes existing worker fatigue guidance. | | APS has concluded that the technical justifications presented in the model SE prepared by the NRC staff are applicable to PVNGS Units 1,2, and 3.2 Attachment 1 License Amendment Request for Adoption of TSTF-51 1, Revision 0 10 CFR Part 26, Subpart I, supersedes existing worker fatigue guidance. |
Letter Sequence Request |
---|
TAC:ME1552, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
|
MONTHYEARML0915602292009-05-28028 May 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26 Project stage: Request ML0922503612009-08-0303 August 2009 Correction to Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26 Project stage: Request ML0927106092009-09-30030 September 2009 Issuance of Amendment Nos. 175, 175, and 175, Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 (TAC Nos. ME1552 to ME1554) Project stage: Approval 2009-08-03
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML23102A3242023-04-12012 April 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-107-A, Separate Control Rods That Are Untrippable Versus Inoperable ML23102A3292023-04-12012 April 2023 Application for Authorized Use of Mururoa Single-Use, Supplied Air Suits, Models V4F1 and MTH2 ML22341A6132022-12-0707 December 2022 Application to Revise Technical Specifications to Adopt TSTF-107- a, Separate Control Rods That Are Untrippable Versus Inoperable ML22116A2202022-04-26026 April 2022 Application for Technical Specification Improvement to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR ML22053A2332022-02-22022 February 2022 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML21323A1702021-11-19019 November 2021 Technical Specifications Bases Revision 73 ML21210A3102021-07-29029 July 2021 Application to Revise Technical Specifications - Administrative Changes ML21139A3302021-05-19019 May 2021 Application for Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases ML21106A3002021-04-16016 April 2021 Technical Specification Bases Revisions 71 and 72 ML21022A4082021-01-22022 January 2021 License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20282A9532020-10-0808 October 2020 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML20183A4602020-07-0101 July 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19360A1552019-12-26026 December 2019 License Amendment Request (LAR) - Change in Implementation Date for Amendment Number 209 ML19291F7352019-10-18018 October 2019 Independent Spent Fuel Storage Installation (ISFSI) - License Amendment Request for Changes to Emergency Plan Staffing Requirements ML19225D1972019-08-13013 August 2019 Independent Spent Fuel Storage Facility - Application for Approval of Indirect Transfer of Control of Licenses ML18361A8452018-12-27027 December 2018 Application to Revise Technical Specifications to Adopt TSTF- 529, Revision 4, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process ML18187A4172018-07-0606 July 2018 License Amendment Request and Exemption Request to Support the Implementation of Framatome High Thermal Performance Fuel ML18145A3032018-05-25025 May 2018 License Amendment Request to Revise Technical Specifications Regarding Response Time Testing of Pressure Transmitters ML17307A1882017-11-0303 November 2017 License Amendment Request Supplement for Risk-Informed Completion Times ML17200D1622017-07-19019 July 2017 License Amendment Request to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML17173A8772017-06-22022 June 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17165A5552017-06-14014 June 2017 License Amendment Request for Revision to the Cyber Security Plan Implementation Schedule Completion Date ML17066A1832017-01-0404 January 2017 License Conditions Regarding Emergency License Amendment Request to Extend Diesel Generator 38 Completion Time ML16356A6892016-12-21021 December 2016 Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time ML16188A3322016-07-0101 July 2016 License Amendment Request and Exemption Request to Support the Implementation of Next Generation Fuel ML16188A3332016-07-0101 July 2016 Description and Assessment of Proposed License Amendment - Technical Analysis ML16182A1712016-06-29029 June 2016 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML16043A3612016-01-29029 January 2016 Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15336A0842015-11-30030 November 2015 NET-300047-07 Revision 1, Material Qualification Report of Maxus for Spent Fuel Storage. ML15336A0872015-11-25025 November 2015 License Amendment Request to Revise Technical Specifications to Incorporate Updated Criticality Safety Analysis ML15336A0832015-09-30030 September 2015 WCAP-18030-NP, Revision 0, Criticality Safety Analysis for Palo Verde Nuclear Generating Station, Units 1, 2, and 3. ML15247A5182015-09-0404 September 2015 Exigent License Amendment Request to Amend Technical Specification Surveillance Requirement 3.1.5.3 for Control Element Assembly 88 for the Remainder of Cycle 19 ML15218A3002015-07-31031 July 2015 License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 1, Risk-Informed Completion Times ML15065A0312015-02-27027 February 2015 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-439-A, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML13329A7002013-11-20020 November 2013 Transmittal of Proprietary Documents for Startup Test Activity Reduction (STAR) Program License Amendment Request ML13280A2642013-09-27027 September 2013 Request to Amend Technical Specification 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip ML13242A0872013-08-26026 August 2013 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13002A1972012-12-26026 December 2012 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML12353A1582012-12-12012 December 2012 Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML11334A0462011-11-22022 November 2011 Request for Amendment to Various Technical Specifications to Implement Administrative Changes ML11182A9082011-06-22022 June 2011 Request for Amendment to Technical Specification 3.7.4, Atmospheric Dump Valves (Advs). ML11103A0532011-03-31031 March 2011 License Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program ML1035600882011-01-19019 January 2011 Issuance of Amendment Nos. 184, 184, and 184, Revise Technical Specification 5.5.8, Inservice Testing Program, to Implement TS Task Force (TSTF)-479-A as Modifed by TSTF-497-A ML1025101612010-08-27027 August 2010 Request for Operating License Amendment - Revision of Feedwater Line Break with Loss of Offsite Power and Single Failure Analysis ML1024500512010-08-25025 August 2010 Request for Amendment to Technical Specification 3.7.4, Atmospheric Dump Valves (Advs). 2024-08-28
[Table view] Category:Technical Specification
MONTHYEARML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24068A2522024-03-0808 March 2024 License Amendment Request to Revise Technical Specifications 3.5.1 and 3.5.2 Using Risk-Informed Process for Evaluations ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23132A3392023-05-12012 May 2023 Application to Revise Technical Specifications 3.3.11 to Adopt TSTF-266-A, Revision 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML22343A1152022-12-0909 December 2022 Transmittal of Technical Specification Bases Revision 75 ML22251A3982022-09-0808 September 2022 Technical Specification Bases Revision 74 and Technical Requirements Manual Revision 70 ML22053A2332022-02-22022 February 2022 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML21323A1702021-11-19019 November 2021 Technical Specifications Bases Revision 73 ML21106A3002021-04-16016 April 2021 Technical Specification Bases Revisions 71 and 72 ML20282A9532020-10-0808 October 2020 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML17258B2142017-09-15015 September 2017 Palo Verde, Units 1, 2, and 3 - Technical Specification Bases Revision 64 and Technical Requirements Manual Revision 64 ML16365A2402016-12-30030 December 2016 Emergency License Amendment Request to Extend Diesel Generator 3B Completion Time ML16356A6892016-12-21021 December 2016 Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time ML16154A5482016-05-26026 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification (TS) Bases Revision 63 and Technical Requirements Manual (TRM) Revision 63 ML16154A5802016-05-12012 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 - Replacement Pages and Insertion Instructions ML16154A6142016-05-12012 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 ML15139A2972015-04-24024 April 2015 Technical Specification (TS) Bases, Revision 62 ML15139A2992015-04-24024 April 2015 Technical Specification Bases (TS Bases), Revision 62, Replacement Pages and Insertion Instructions ML15139A3002015-04-24024 April 2015 Technical Specification Bases (TS Bases), Revision 62 ML15027A0642015-01-0909 January 2015 Technical Specification (TS) Bases Revision 61 and Technical Requirements Manual (TRM) Revision 62 ML14255A0632014-08-29029 August 2014 Technical Specification Bases, Revision 60 ML14255A0642014-08-20020 August 2014 PVNGS Technical Specification Bases (TS Bases), Revision 60, Replacement Pages and Insertion Instructions ML14091A8792014-03-21021 March 2014 Technical Specification (TS) Bases Revision 59 and Technical Requirements Manual (TRM) Revision 59 ML14091A9572014-03-19019 March 2014 Technical Specification Bases (TS Bases) Revision 59 Replacement Pages and Insertion Instructions ML14091A9562014-03-19019 March 2014 Technical Specification (TS) Bases Revision 59 ML13280A2642013-09-27027 September 2013 Request to Amend Technical Specification 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip ML13217A0542013-07-0303 July 2013 Enclosure 1 - Technical Specifications Bases, Revision 58 ML13217A0552013-07-0303 July 2013 Enclosure 1 - Technical Specifications Bases, Revision 58 ML13120A5002013-04-16016 April 2013 Technical Specification (TS) Bases Revision 57 and Technical Requirements Manual (TRM) Revision 57 ML13120A5012013-04-10010 April 2013 Technical Specification Bases, Revision 57 ML13120A5022013-04-10010 April 2013 Technical Specification Bases (TS Bases) Revision 57, Replacement Pages and Insertion Instructions ML13120A5042013-04-10010 April 2013 Technical Requirements Manual (TRM) Revision 57 Replacement Pages and Insertion Instructions ML12353A1582012-12-12012 December 2012 Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML12191A3502012-06-26026 June 2012 Technical Specification (TS) Bases Revision 56 and Technical Requirements Manual (TRM) Revision 56 ML12193A0412012-05-30030 May 2012 Technical Specification Bases, Revision 56 ML12193A0422012-05-25025 May 2012 Insertion Instructions Technical Specifications Bases, Revision 56, Summary of Changes ML12076A0452012-03-0808 March 2012 Request for Amendment to Eliminate the Use of the Term Core Alteration in the Technical Specifications ML11287A0342011-09-0101 September 2011 Technical Specification Bases Revision 55 ML11287A0332011-09-0101 September 2011 Insertion Instructions for Technical Specification Bases Revision 55, Summary of Changes ML1106107632011-01-26026 January 2011 PVNGS Technical Specification Bases, Revision 54 ML1033506462010-11-10010 November 2010 Technical Specification Bases, Revision 53 ML1021500352010-07-21021 July 2010 Technical Specifications Bases Revision 52 Update ML0935608452009-12-0909 December 2009 Submittal of Changes to the TS Bases Incorporated Into Revision 51, Implemented on December 2, 2009 ML0928102272009-09-28028 September 2009 Request to Amend Technical Specification (TS) 3.8.7, Inverters - Operating, to Extend Completion Time for Restoration of an Inoperable Inverter ML0923801512009-08-18018 August 2009 Submittal of Technical Specifications Bases Revision 50 Update ML0915602292009-05-28028 May 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26 ML0823408392008-08-13013 August 2008 Technical Specifications Bases Revision 49 Update ML0819800322008-07-0202 July 2008 Request for Amendments to Technical Specification 4.2.2, Control Element Assemblies 2024-08-27
[Table view] Category:Bases Change
MONTHYEARML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML23180A2222023-06-29029 June 2023 Application to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) - Operating, TS 3.5.2, Safety Injection Tanks (Sits) - Shutdown, and TS 3.6.5, Containment Air Temperature ML23122A1822023-04-29029 April 2023 Transmittal of Technical Specification Bases Revision 76 ML22343A1152022-12-0909 December 2022 Transmittal of Technical Specification Bases Revision 75 ML22251A3982022-09-0808 September 2022 Technical Specification Bases Revision 74 and Technical Requirements Manual Revision 70 ML22053A2332022-02-22022 February 2022 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML21323A1702021-11-19019 November 2021 Technical Specifications Bases Revision 73 ML21106A3002021-04-16016 April 2021 Technical Specification Bases Revisions 71 and 72 ML17258B2142017-09-15015 September 2017 Palo Verde, Units 1, 2, and 3 - Technical Specification Bases Revision 64 and Technical Requirements Manual Revision 64 ML16356A6892016-12-21021 December 2016 Emergency License Amendment Request for a One-Time Extension of Diesel Generator Completion Time ML16154A5482016-05-26026 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification (TS) Bases Revision 63 and Technical Requirements Manual (TRM) Revision 63 ML16154A6142016-05-12012 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 ML16154A5802016-05-12012 May 2016 PVNGS, Units 1, 2, and 3 - Technical Specification Bases, Revision 63 - Replacement Pages and Insertion Instructions ML15139A3002015-04-24024 April 2015 Technical Specification Bases (TS Bases), Revision 62 ML15139A2992015-04-24024 April 2015 Technical Specification Bases (TS Bases), Revision 62, Replacement Pages and Insertion Instructions ML15139A2972015-04-24024 April 2015 Technical Specification (TS) Bases, Revision 62 ML15027A0642015-01-0909 January 2015 Technical Specification (TS) Bases Revision 61 and Technical Requirements Manual (TRM) Revision 62 ML14255A0632014-08-29029 August 2014 Technical Specification Bases, Revision 60 ML14255A0642014-08-20020 August 2014 PVNGS Technical Specification Bases (TS Bases), Revision 60, Replacement Pages and Insertion Instructions ML14091A8792014-03-21021 March 2014 Technical Specification (TS) Bases Revision 59 and Technical Requirements Manual (TRM) Revision 59 ML14091A9572014-03-19019 March 2014 Technical Specification Bases (TS Bases) Revision 59 Replacement Pages and Insertion Instructions ML14091A9562014-03-19019 March 2014 Technical Specification (TS) Bases Revision 59 ML13280A2642013-09-27027 September 2013 Request to Amend Technical Specification 3.3.3, Control Element Assembly Calculators and TS 3.3.6, Engineered Safety Features Actuation System (ESFAS) Logic and Manual Trip ML13217A0552013-07-0303 July 2013 Enclosure 1 - Technical Specifications Bases, Revision 58 ML13217A0542013-07-0303 July 2013 Enclosure 1 - Technical Specifications Bases, Revision 58 ML13120A5002013-04-16016 April 2013 Technical Specification (TS) Bases Revision 57 and Technical Requirements Manual (TRM) Revision 57 ML13120A5022013-04-10010 April 2013 Technical Specification Bases (TS Bases) Revision 57, Replacement Pages and Insertion Instructions ML13120A5012013-04-10010 April 2013 Technical Specification Bases, Revision 57 ML12353A1582012-12-12012 December 2012 Application for Technical Specification Improvement to Adopt TSTF-490, Revision 0, Deletion of E-Bar Definition and Revision to RCS Specific Activity Technical Specifications ML12191A3502012-06-26026 June 2012 Technical Specification (TS) Bases Revision 56 and Technical Requirements Manual (TRM) Revision 56 ML12193A0412012-05-30030 May 2012 Technical Specification Bases, Revision 56 ML12193A0422012-05-25025 May 2012 Insertion Instructions Technical Specifications Bases, Revision 56, Summary of Changes ML11287A0332011-09-0101 September 2011 Insertion Instructions for Technical Specification Bases Revision 55, Summary of Changes ML11287A0342011-09-0101 September 2011 Technical Specification Bases Revision 55 ML1106107632011-01-26026 January 2011 PVNGS Technical Specification Bases, Revision 54 ML1033506462010-11-10010 November 2010 Technical Specification Bases, Revision 53 ML1021500352010-07-21021 July 2010 Technical Specifications Bases Revision 52 Update ML0935608452009-12-0909 December 2009 Submittal of Changes to the TS Bases Incorporated Into Revision 51, Implemented on December 2, 2009 ML0923801512009-08-18018 August 2009 Submittal of Technical Specifications Bases Revision 50 Update ML0915602292009-05-28028 May 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26 ML0823408392008-08-13013 August 2008 Technical Specifications Bases Revision 49 Update ML0814903602008-05-20020 May 2008 Technical Specifications Bases Revision 48 Update ML0806603322008-02-29029 February 2008 Supplement to Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0733811362007-11-27027 November 2007 Technical Specifications Bases Revision 47 Update ML0729102272007-10-11011 October 2007 Technical Specification Bases Revision 46 Update ML0725500472007-09-0404 September 2007 Technical Specifications Bases Revisions 42, 43, 44, and 45 Updates ML0703302562007-01-23023 January 2007 Technical Specifications, Bases Revision 41 Update ML0634803362006-12-0505 December 2006 Technical Specifications Bases Revisions 38, 39, and 40 Update ML0631903232006-11-0303 November 2006 Supplement to Application for Technical Specification Change Regarding Main Steam Isolation Valves 2024-08-27
[Table view] |
Text
10 CFR 50.90 A subsidiary of Pinnacle West Capital Corporation Dwight C. Mims Mail Station 7605 Palo Verde Nuclear Vice President Tel. 623-393-5403 P.O. Box 52034 Generating Station Regulatory Affairs and Plant Improvement Fax 623-393-6077 Phoenix, Arizona 85072-2034 102-06011 -DCM/DLK May 28, 2009 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket-Nos.
STN 50-528/529/530 License Amendment Request for Adoption of TSTF-51 1, Revision 0,"Eliminate Working Hour Restrictions from Technical Specification 5.2.2 to Support Compliance with 10 CFR Part 26" In accordance with the provisions of Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), Arizona Public Service Company (APS) is submitting a request for an amendment to the Technical Specifications (TS) for PVNGS Units 1, 2, and 3.The proposed amendment would delete those portions of the TS that are superseded by 10 CFR Part 26, Subpart I. This change is consistent with NRC approved Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-51 1, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." The availability of this TS improvement was announced in the Federal Register on December 30, 2008 (73 FR 79923) as part of the Consolidated Line Item Improvement Process (CLIIP). A deviation from the model Safety Evaluation published in the Federal Register notice is being made to enhance the wording of the proposed commitment and account for the possibility that the requested amendment may not receive NRC approval before October 1, 2009. APS is committing to implement the license amendment following NRC approval whether concurrent with or after implementation of the new 10 CFR 26, Subpart I, requirements.
Attachment 1 provides an evaluation of the proposed change. Attachment 2 provides the existing TS pages marked up to show the proposed change. Attachment 3 provides the proposed TS changes in final typed format. Attachment 4 provides the regulatory commitment.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak 0 Diablo Canyon 0 Palo Verde 0 San Onofre 0 South Texas 0 Wolf Creek ATTN: Document Control Desk U.S. Nuclear Regulatory Commission License Amendment Request For Adoption of TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions From TS 5.2.2 to Support Compliance with 10 CFR Part 26" Page 2 APS requests approval of the proposed license amendment by September 1, 2009, to support implementation of TS changes concurrent with implementation of the new 10 CFR 26, Subpart I, requirements by October 1, 2009. In the event NRC approval for the requested amendment is not obtained before October 1, 2009, the amendment shall be implemented within 30 days of NRC approval and APS shall comply with the new 10 CFR 26, Subpart I, requirements and current Technical Specifications until the approved TS changes are implemented.
This letter contains one regulatory commitment as identified in Attachment 4.In accordance with 10 CFR 50.91, a copy of this License Amendment Request, with attachments, is being provided to the Arizona Radiation Regulatory Agency (ARRA).Should you need further information regarding this amendment request, please contact Russell A. Stroud, Licensing Section Leader, at (623) 393-5111.I declare under penalty of perjury that the foregoing is true and correct.Executed on (51a rleq (Date)Sincerely, DMC/RAS/DLK/gat Attachments:
- 1. Evaluation of the Proposed TS Change 2. Proposed Technical Specification Change (Mark-Up)3. Proposed Technical Specification Change (Re-Typed)
- 4. List of Regulatory Commitments cc: E. E. Collins Jr.J. R. Hall R. I. Treadway A. V. Godwin T. Morales NRC Region IV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS Arizona Radiation Regulatory Agency (ARRA)Arizona Radiation Regulatory Agency (ARRA)
ATTACHMENT 1 Evaluation of the Proposed TS Change
Subject:
License Amendment Request for Adoption of TSTF-51 1, Revision 0,"Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26"
1.0 DESCRIPTION
2.0 PROPOSED CHANGE
3.0 BACKGROUND
4.0 TECHNICAL
ANALYSIS 5.0 REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration Determination
5.2 Applicable
Regulatory Requirements/Criteria
6.0 ENVIRONMENTAL
CONSIDERATION
7.0 REFERENCES
1 Attachment 1 License Amendment Request for Adoption of TSTF-51 1, Revision 0
1.0 DESCRIPTION
The proposed amendment would delete those portions of the Technical Specifications (TS) superseded by 10 CFR Part 26, Subpart I. This change is consistent with NRC approved Revision 0 to Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-51 1, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." A single enhancement to the proposed NRC staff's model safety evaluation is described in Section 2.0. The availability of this TS improvement was announced in the Federal Register on December 30, 2008, (73 FR 79923) as part of the Consolidated Line Item Improvement Process (CLIIP).
2.0 PROPOSED CHANGE
Consistent with the NRC approved Revision 0 of TSTF-51 1, the proposed TS changes delete those portions of TS superseded by 10 CFR Part 26, Subpart I.This application is being made in accordance with the CLIIP. Arizona Public Service Company (APS) is proposing a single enhancement to the proposed NRC staffs model Safety Evaluation (SE) published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability.
The deviation from the model SE published in the FR notice is that the proposed commitment to implement the approved TS changes has been enhanced to state that implementation would be concurrent with or after implementation of the new 10 CFR 26, Subpart I, requirements, since this amendment may not be approved until after the October 1, 2009, final rule required implementation date. In the event NRC approval for the requested amendment is not obtained before October 1, 2009, the amendment shall be implemented within 30 days of NRC approval and APS shall comply with the new 10 CFR 26, Subpart I, requirements and current Technical Specifications until the approved TS changes are implemented.
3.0 BACKGROUND
The NRC issued a Federal Register notice (73 FR 16966, March 31, 2008) of the issuance of a final rule that amended 10 CFR Part 26. The revised regulations in 10 CFR Part 26, Subpart I, supersede working hour restrictions contained in paragraph d of TS 5.2.2. The background for this application is adequately addressed by the NRC Notice of Availability published on December 30, 2008 (73 FR 79923).4.0 TECHNICAL ANALYSIS APS has reviewed the model SE published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability.
APS has concluded that the technical justifications presented in the model SE prepared by the NRC staff are applicable to PVNGS Units 1,2, and 3.2 Attachment 1 License Amendment Request for Adoption of TSTF-51 1, Revision 0 10 CFR Part 26, Subpart I, supersedes existing worker fatigue guidance.
10 CFR Part 26, Subpart I, distinguishes between work hour controls and fatigue management and strengthens the requirements for both. Under the new rule, work hour restrictions include not only work hour limitations for rolling 24-hour, 48-hour, and 7-day periods, but also include a required minimum break between work periods and varying required minimum days off. Additionally, Subpart I confines the use of waivers (deviations from restrictions) to situations where overtime is necessary to mitigate or prevent a condition adverse to safety or is necessary to maintain the security of the facility.
Subpart I also strengthens reporting requirements.
Finally, the new rule's work hour control scope includes certain operating and maintenance personnel, as well as individuals directing those operating and maintenance personnel, health physics and chemistry personnel who are a part of the on-site emergency response organization minimum shift complement, the fire brigade member who is responsible for understanding the effects of fire and fire suppressants on safe shutdown capability, and certain security personnel.
The proposed change removes working hour limits imposed in the Technical Specifications in order to support compliance with 10 CFR Part 26, Subpart I. Work hour controls and fatigue management requirements have been incorporated into the NRC's regulations; therefore, it is unnecessary to have work hour control requirements in the Technical Specifications.
Removal of the Technical Specification requirements will be performed concurrent with or after the implementation of the 10 CFR Part 26, Subpart I, requirements, even if the Technical Specification change is approved by the NRC prior to the October 1, 2009, deadline.
Along with this License Amendment Request, APS is submitting a commitment to implement the amendment concurrent with the new 10 CFR Part 26, Subpart I, requirements.
In the event NRC approval for the requested amendment is not obtained before October 1, 2009, the amendment shall be implemented within 30 days of NRC approval and APS shall comply with the new 10 CFR 26, Subpart I, requirements and current Technical Specifications until the approved TS changes are implemented.
5.0 REGULATORY
SAFETY ANALYSIS 5.1 No Significant Hazards Determination APS has reviewed the no significant hazards determination published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability.
APS has concluded that the determination presented in the notice is applicable to PVNGS Units 1, 2, and 3.APS has evaluated the proposed changes to the TS using the criteria in 10 CFR 50.92 and has determined that the proposed changes do not involve a significant hazards consideration.
An analysis of the issue of no significant hazards consideration is presented below: 3 Attachment 1 License Amendment Request for Adoption of TSTF-511, Revision 0 Criterion 1: The Proposed Change Does Not Involve a Significant Increase in the Probability or Consequences of an Accident Previously Evaluated The proposed change removes Technical Specification restrictions on working hours for personnel who perform safety related functions.
The Technical Specification restrictions are superseded by the worker fatigue requirements in 10 CFR Part 26. Removal of the Technical Specification requirements will be performed concurrent with or after the implementation of the 10 CFR Part 26, Subpart I, requirements.
In the event NRC approval for the requested amendment is not obtained before October 1, 2009, the amendment shall be implemented within 30 days of NRC approval and APS shall comply with the new 10 CFR 26, Subpart I, requirements and current Technical Specifications until the approved TS changes are implemented.
The proposed change does not impact the physical configuration or function of plant structures, systems, or components (SSCs) or the manner in which SSCs are operated, maintained, modified, tested, or inspected.
Worker fatigue is not an initiator of any accident previously evaluated.
Worker fatigue is not an assumption in the consequence mitigation of any accident previously evaluated.
Therefore, it is concluded that this change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
Criterion 2: The Proposed Change Does Not Create the Possibility of a New or Different Kind of Accident from Any Accident Previously Evaluated The proposed change removes Technical Specification restrictions on working hours for personnel who perform safety related functions.
The Technical Specification restrictions are superseded by the worker fatigue requirements in 10 CFR Part 26. Working hours will continue to be controlled in accordance with NRC requirements.
The new rule allows for deviations from controls to mitigate or prevent a condition adverse to safety or as necessary to maintain the security of the facility.
This ensures that the new rule will not unnecessarily restrict working hours and, thereby, create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed change does not alter the plant configuration, require new plant equipment to be installed, alter accident analysis assumptions, add any initiators, or affect the function of plant systems or the manner in which systems are operated, maintained, modified, tested, or inspected.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
4 Attachment I License Amendment Request for Adoption of TSTF-51 1, Revision 0 Criterion 3: The Proposed Change Does Not Involve a Significant Reduction in a Margin of Safety The proposed change removes Technical Specification restrictions on working hours for personnel who perform safety related functions.
The Technical Specification restrictions are superseded by the worker fatigue requirements in 10 CFR Part 26. The proposed change does not involve any physical changes to the plant or alter the manner in which plant systems are operated, maintained, modified, tested, or inspected.
The proposed change does not alter the manner in which safety limits, limiting safety system settings or limiting conditions for operation are determined.
The safety analysis acceptance criteria are not affected by this change. The proposed change will not result in plant operation in a configuration outside the design basis. The proposed change does not adversely affect systems that respond to safely shutdown the plant and to maintain the plant in a safe shutdown condition.
Removal of plant-specific Technical Specification administrative requirements will not reduce a margin of safety because the requirements in 10 CFR Part 26 are adequate to ensure that worker fatigue is managed.Therefore, the proposed change does not involve a significant reduction in a margin of safety.Based on the above, APS concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2 Applicable
Regiulatory Requirements/Criteria A description of the proposed TS change and its relationship to applicable regulatory requirements was provided in the NRC Notice of Availability published on December 30, 2008 (73 FR 79923). APS has reviewed the NRC staffs model SE published on December 30, 2008 (73 FR 79923) as part of the CLIIP Notice of Availability and concluded that the regulatory evaluation section is applicable to PVNGS Units 1, 2, and 3.The proposed change eliminates the plant-specific Technical Specification administrative controls on working hours. The Technical Specification guidance has been superseded by 10 CFR Part 26.10 CFR Part 26, Subpart I, "Managing Fatigue," contains requirements for managing worker fatigue at operating nuclear power plants.10 CFR 50.36 provides, among other things, the regulatory requirements for the content in the Administrative Controls section of the Technical Specifications.
The inclusion of requirements to control working hours and manage fatigue is not required to be in the 5 Attachment 1 License Amendment Request for Adoption of TSTF-51 1, Revision 0 Administrative Controls by 10 CFR Part 50.36. Because the requirement to control working hours and manage fatigue is provided in 10 CFR Part 26, Subpart I, it is unnecessary for the Technical Specifications to contain similar controls.6.0 ENVIRONMENTAL CONSIDERATION APS has reviewed the environmental evaluation included in the model SE published on December 30, 2008, (73 FR 79923) as part of the CLIIP Notice of Availability.
APS has concluded that the staffs findings presented in that evaluation are applicable to PVNGS Units 1, 2, and 3. The proposed amendment changes recordkeeping, reporting, or administrative procedures.
Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10).
Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 REFERENCES
- 1. Federal Register Notice, Final Rule 10 CFR Part 26 published on March 31, 2008 (73 FR 16966).2. TSTF-51 1, Revision 0, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." 3. Federal Register Notice, Notice of Availability published on December 30, 2008 (73 FR 79923).6 ATTACHMENT 2 Proposed Technical Specification Change (Mark-Up)Pages: 5.2-2 5.2-3 Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued) shall be assigned for each control room, from which a reactor is operating in MODES 1, 2, 3, or 4.b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m).
Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
- c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action is taken to fill the required.position.
.1 J ..... .I.._I "11 L -- J .... I J --.-J I J- J U. Adminisrative prueeuures shall b e developedi and Implemene to limit the working hours of unit s-taff who perform safety related functions (e g. licensed SROs, licensed Rgs, raditio proecton tchncias, auxiliary operators, and key mainte-naRe personnel).
The controls shall include guidelines on working hours that ensure adequate Shift covepage shall be maintained without routine heavy use of overtime.Any deviation from the woA',rking hour guid-elines-Shall be authori zed inadv-ance bypersonnel at the Di rector level o~r designees,..
in _accordance with approved administrative proeduesand with documentation of the basis for granting thep deviaton Cont rols shall be included in the proc~edures such ta individual overtime shall be reviewed monthly by the authorized individuals or- designees to ensure thatexeiv hours have not been assigned.
Routine deviiatbion from the abofhve -uideline
,,'is, not nautoied.A (continued)
PALO VERDE UNITS.1,2,3 5.2-2 AMENDMENT NO. 44-ý 120 Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued)The Operations Department Leader or Operations Supervisor shall hold an SRO license.The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.PALO VERDE UNITS 1,2,3 5.2-3 AMENDMENT NO. 44-ý 120 1 Attachment 3 Proposed Technical Specification Change (Re-Typed)
Page: 5.2-2 Organization 5.2 5.2 Organization 5.2.2 Unit Staff (continued) shall be assigned for each control room from which a reactor is operating in MODES 1, 2- 3, or 4.b. Shift crew composition shall meet the requirements stipulated herein and in 10 CFR 50.54(m).
Shift crew composition may be less than the minimum requirement of 10 CFR 50.54(m)(2)(i) and 5.2.2.a and 5.2.2.f for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift crew members provided immediate action is taken to restore the shift crew composition to within the minimum requirements.
- c. A Radiation Protection Technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.d. The Operations Department Leader or Operations Supervisor shall hold an SRO license.e. The Shift Technical Advisor (STA) shall provide advisory technical support to the Shift Manager in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit. In addition, the STA shall meet the qualifications specified by the Commission Policy Statement on Engineering Expertise on Shift.PALO VERDE UNITS 1,2,3 5.2-2 AMENDMENT NO. 4-14 120 Attachment 4 List of Regulatory Commitments Commitment Removal of the plant-specific Technical Specification requirements will be performed concurrently with the implementation of the 10 CFR Part 26, Subpart I, requirements.
In the event NRC approval for the requested amendment is not obtained before October 1, 2009, the amendment shall be implemented within 30 days of NRC approval and APS shall comply with the new 10 CFR 26, Subpart I, requirements and current Technical Specifications until the approved TS changes are implemented.