ML061980028: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[CNRO-2006-00035, Supplement to Request for the Use of Delta Protection'S Self Fed Single Use Mururoa Blu Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee]]
| number = ML061980028
| issue date = 07/13/2006
| title = Supplement to Request for the Use of Delta Protection'S Self Fed Single Use Mururoa Blu Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee
| author name = Burford F G
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/FSME
| docket = 05000003, 05000247, 05000271, 05000286, 05000293, 05000313, 05000333, 05000368, 05000382, 05000416, 05000458
| license number = DPR-005, DPR-026, DPR-028, DPR-035, DPR-051, DPR-059, DPR-064, NPF-006, NPF-029, NPF-038, NPF-047
| contact person =
| case reference number = CNRO-2006-00035
| document type = Letter
| page count = 6
}}
 
=Text=
{{#Wiki_filter:Edng Entergy Entergy Operations, Inc.1340 Echelon Parkway Jackson. Mississippi 39213-8298 Tel 601-368-5758 F. G. Burford Acting Director Nuclear Safety & Licensing CNRO-2006-00035 July 13, 2006 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
 
==SUBJECT:==
Supplement to Request for the Use of Delta Protection's Self Fed Single Use"Mururoa BLU" Suit Systems Arkansas Nuclear One Units 1 & 2* Docket Nos. 50-313 & 50-368 License Nos. DPR-51 and NPF-6 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Indian Point Nuclear Generating Units Nos. 1, 2 and 3 Docket Nos.50-003, 50-247, and 50-286 License Nos. DPR-5, DPR-26, and DPR-64 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38 River Bend Station Docket No. 50-458 License No. NPF-47 Vermont Yankee Nuclear Power Docket No. 50-271 License No. DPR-28
 
==References:==
: 1. Entergy letter dated May 19, 2006, Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems (CNRO 2006-00020)
: 2. Delta Protection/Bacou Dalloz MURUBLU05NP, 'Topical Report Submittal of Delta Protection Mururoa Blu Single Use Encapsulating Suits," October 27, 2005 (ADAMS Accession No. ML053060280)
: 3. NIOSH "Concept for Industrial Power, Air-purifying Respiratory Standard," Draft for Comment, May 30, 2005 (http://www.cdc.gov/niosh/npptl/standardsdev.htmi)
CNRO-2006-00035 Page 2 of 3
 
==Dear Sir or Madam:==
Entergy Operations Inc. and Entergy Nuclear Operations Inc. (Entergy), in Reference 1, requested authorization for use of equipment that has not been tested or certified by the National Institute for Occupational Safety and Health (NIOSH). The request was to use Delta Protection's self fed single use Mururoa BLU suit. The request was made pursuant to 10 CFR 20.1703(b).
On June 16, 2006, Entergy and members of your staff held a phone call to discuss the change. As a result of that call, Entergy agreed to establish procedures that implement the use of the BLU suits consistent with the Topical Report (ADAMS Accession No.ML053060280) and in accordance with the "Approved Device Configuration and Conditions of Use" identified in the NRC's related Safety Evaluation (ADAMS Accession No.ML060950499).
These new commitments are listed in Attachment
: 1. The commitments supersede all of the commitments made in Reference 1.Should you have any questions regarding this submittal, please contact Bill Brice at (601) 368-5076.Very truly yours, FGB/WBB/bal Attachments:
: 1. List of Regulatory Commitments cc: (see next page)
CNRO-2006-00035 Page 3 of 3 cc: Mr. M. A. Balduzzi (PILG)Mr. W.R. Campbell (ECH)Mr. F. R. Dacimo (IPEC)Mr. J. P. DeRoy (ECH)Mr. P. T. Dietrich (JAF)Mr. W. A. Eaton (ECH)Mr. R. K. Edington (CNS)Mr. J. S. Forbes (ANO)Ms. C. L. Gaujacq (ECH)Mr. J. T. Herron (WPO)Mr. P. D. Hinnenkamp (RBS)Mr. M. R. Kansler (WPO)Mr. 0. Limpias (WPO)Mr. J. McGaha (ECH)Mr. C. J. Schwarz (WPO)Mr. T. A. Sullivan (VY)Mr. G. J. Taylor (ECH)Mr. J. E. Venable (W-3)Mr. G. A. Williams (GGNS)Mr. J. P. Boska, Project Manager, IP2, IP3, JAF Mr. S. J. Collins, Regional Administrator, Region I Mr. M. B. Fields, Project Manager, WF3 Mr. D. G. Holland, Project Manager, ANO-1&2 Dr. B. S. Mallett, NRC Regional Administrator, Region IV Mr. J. J. Shea, Project Manager, PNPS, VY Mr. B. K. Vaidya, Project Manager, GGNS & RBS Mr. M. K. Webb, Project Manager, IP1 NRC Resident Inspectors (ANO, GGNS, IP2, 1P3, JAF, RBS, PNPS, WF3, VY)American Nuclear Insurers (Attn: Library)Mr. Bernard R. Bevill (Arkansas Dept. of Health (DRC & EM)Mr. Paul Eddy (NYS Dept. of Public Service)LA Dept. of Environmental Quality (OECSD)Mr. D. E. Levanway (Wise Carter)Mr. David O'Brien (Vermont DPS)Mr. J. Smith (Wise Carter)Mr. Peter R. Smith (NYSERDA)Mr. H. L. Thomas (SMEPA)
ATTACHMENT 1 CNRO-2006-00035 List of Regulatory Commitments List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document.
Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE (If ACTION Required)Establish procedures that implement the use of the BLU suits consistent with the Topical Report (ADAMS Accession No. ML053060280) (Ref. 2) and Before use of in accordance with the "configuration and conditions X suit for use" identified in the NRC's related Safety Evaluation (ADAMS Accession No. ML060950499).
The BLU suits will be used in a configuration consisting of: Mururoa BLU one-piece encapsulating suit (of either PVC or Ethyfuge construction), fitted with a Micronel C500X-012EK-AB60 blower with a C501A-012AK-A battery (consistent with the parts Before use of list in Section 7 of Attachment 6.6.6 to the Topical X suit Report (ADAMS Accession No. ML053060280)(Ref. 2) four Scott PF 10 P3, or four Delta Protection P3, high efficiency particulate filter cartridges.
All four filter cartridges must be matching and replaced as a set.Procedures for use of the suit systems are integrated into the respiratory programs required by Subpart H of 10 CFR Part 20. Fit testing of user is Before use of not applicable to fully encapsulating suits. Prior to X suit use, wearers are trained on these conditions of use as well as the emergency escape features of the suits.Suits are used in accordance with recommendations in Attachments 6.6.4, 6.6.5, and 6.6.6 of the Topical Before use of Report (ADAMS Accession No. ML053060280) suit (Ref. 2).Suit enclosures are single use only, and are discarded after use. Unused suit enclosures are stored in their original manufacturer's packing (in an environment not colder than 32 deg. F, nor hotter Before use of than 140 deg. F), with a maximum storage shelf-life X suit of 3 years. Suits are not to come in contact with anything colder than 41 deg. F, nor hotter than 140 deg. F, during use.Suits are donned with a fully charged battery pack installed on the blower. The maximum period of use Before use of (timed from a fully charged battery), is 4 hours with X suit the blower set at 600 I/min, and 7 hours with the blower at the 400 I/min setting.
TYPE (Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE (If ACTION Required)Suits are used only in atmospheres containing specific contaminants in concentrations that are not IDLH, as given in NIOSH "Concept for Industrial Power, Air-purifying Respiratory Standard", Draft for Before use of Comment, May 30, 2005 suit (http://www.cdc.gov/niosh/npptl/standardsdev.html), and have an oxygen content of at least 19.5 percent by volume.Communication channels are established with Delta Protection to report any defects experienced with Before use of the device, and ensure that any manufacturer's X suit notifications concerning the suit systems are received in a timely manner.2}}

Revision as of 09:06, 18 December 2018