ENS 53550: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 9: | Line 9: | ||
| unit = 2 | | unit = 2 | ||
| utype = W-4-LP, W-4-LP | | utype = W-4-LP, W-4-LP | ||
| cfr = 10 CFR 50.72(b)(2)(iv)(B) | | cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A) | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 08/14/2018 02:18 | | notification date = 08/14/2018 02:18 | ||
Line 22: | Line 22: | ||
All control rods fully inserted in response to the automatic reactor trip. | All control rods fully inserted in response to the automatic reactor trip. | ||
The licensee notified the NRC resident. | The licensee notified the NRC resident. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180815en.html#en53550 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 |
Latest revision as of 20:40, 30 October 2018
Where | |
---|---|
Comanche Peak Texas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+21.3 h0.888 days <br />0.127 weeks <br />0.0292 months <br />) | |
Opened: | Brian Mitchell 02:18 Aug 14, 2018 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Aug 14, 2018 |
53550 - NRC Website
| |