| event text = During a post maintenance start of the 1B diesel generator, the air start solenoid valves did not close as expected. This resulted in lowering air pressure in the common air start headers causing inoperability of the 2A and 2B diesel generators at time 23:03. The 1B diesel generator was isolated from the common air start header, which restored the air start header pressure to the 2A and 2B diesel generators. The 2A and 2B diesel generators were declared operable at 23:34. | | event text = During a post maintenance start of the 1B diesel generator, the air start solenoid valves did not close as expected. This resulted in lowering air pressure in the common air start headers causing inoperability of the 2A and 2B diesel generators at time 23:03. The 1B diesel generator was isolated from the common air start header, which restored the air start header pressure to the 2A and 2B diesel generators. The 2A and 2B diesel generators were declared operable at 23:34. | ||
The NRC Resident Inspector was notified. | The NRC Resident Inspector was notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20181015en.html#en53663 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 |
Revision as of 07:30, 15 October 2018
Where | |
---|---|
Calvert Cliffs ![]() Maryland (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+23.97 h0.999 days <br />0.143 weeks <br />0.0328 months <br />) | |
Opened: | Kevin Dougherty 03:58 Oct 12, 2018 |
NRC Officer: | Karen Cotton |
Last Updated: | Oct 12, 2018 |
53663 - NRC Website
| |