ML15244B092: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000483/2015401]]
| number = ML15244B092
| issue date = 09/01/2015
| title = Non-Public Security Inspection Plan for Callaway Plant (NRC Physical Security Inspection Report Number 05000483/2015401)
| author name = Haire M S
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Diya F
| addressee affiliation = Union Electric Co
| docket = 05000483
| license number = NPF-030
| contact person =
| case reference number = IR 2015401
| document type = Inspection Plan, Letter
| page count = 4
}}
See also: [[followed by::IR 05000483/2015401]]
 
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
"Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this
transmittal document is decontrolled."
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
  September 1, 2015
 
Mr. Fadi Diya, Senior Vice President 
  and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO  65251 
 
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT
NUMBER 05000483/2015401)
Dear Mr. Diya:
 
On August 11, 2015, the NRC completed its mid-cycle performance review of Callaway Plant.  The results of that review have been trans
mitted to you separately in a publicly available assessment letter.  This letter informs you of the NRC's plans for future security-related
inspections at your facility. 
 
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017.  The inspections listed during the last nine months of the inspection plan are
tentative and may be revised at the next semiannual performance review.  The NRC provides
the inspection plan to allow for the resolution of any scheduling conflicts and personnel
availability issues.  The NRC will contact you as
soon as possible to dis
cuss changes to the inspection plan should circumstances warrant any changes.  Routine force-on-force inspections are conducted approximately every 3 years.  You will be notified by separate correspondence
8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.
While we are fully committed to our goal of ensuring openness in our regulatory process, we
must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.  Thus due to the security-related information contained in this correspondence, and 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
  F. Diya - 2 -
 
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified
Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
 
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/ 
Mark S. Haire, Chief
 
Plant Support Branch 1
 
Division of Reactor Safety
Docket No. 50-483 License No. NPF-30
 
Enclosure:
Inspection Plan
 
cc w/encl:
Mr. Eric Olson
 
Manager, Security 
Callaway Nuclear Plant
P.O. Office Box 620 Fulton, MO 65251
cc w/o encl:
Electronic Distribution for
Callaway Plant
 
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
  F. Diya - 2 -
 
  OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
 
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,
/RA/ 
Mark S. Haire, Chief
 
Plant Support Branch 1
 
Division of Reactor Safety
Docket No. 50-483 License No. NPF-30
 
Enclosure:
Inspection Plan
 
cc w/encl:
Mr. Eric Olson
 
Manager, Security 
Callaway Nuclear Plant
P.O. Office Box 620 Fulton, MO 65251
cc w/o encl:
Electronic Distribution for
  Callaway Plant
Distribution:  See next page
 
ADAMS Accession Number:  ML15244B092  SUNSI Review By:  MHaire
ADAMS  Yes    No  Publicly Available Non-Publicly Available  Non-Sensitive  Sensitive Keyword:  RGN-002 OFFICE C:PSB1      NAME MHaire/dch      SIGNATURE /RA/      DATE 9/1/15      OFFICIAL RECORD COPY
OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
  OFFICIAL USE ONLY
-SECURITY-RELATED INFORMATION
Letter to Mr. Fadi Diya from Mark Haire, dated September 1, 2015
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR CALLAWAY PLANT (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000483/2015401)
Electronic Distribution by RIV w/enclosure
: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Electronic Distribution by RIV w/o enclosure
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov) 
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Shawn.Money@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (John.Klos@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) ROPreports Resource
}}

Revision as of 22:23, 10 October 2018