ML18017B124: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML18017B124 | | number = ML18017B124 | ||
| title = Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch | | title = Forwards Final Deficiency Rept Re Omission of Addl Reinforcing Steel in Unit 1 Containment Bldg Exterior Wall Adjacent to Const Opening for Equipment Hatch | ||
| release date = 08/31/2018 | |||
| package contents = {{Adams package content | | package contents = {{Adams package content | ||
| number = ML18017B125 | | number = ML18017B125 |
Revision as of 01:41, 30 September 2018
Date released: 08/31/2018 | Download: ML18017B124 |
---|---|
ML18017B125 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 06/24/1980 |
From: | CAROLINA POWER & LIGHT CO. |
To: | |
References | |
Download: ML18017B125 (3) | |
ML18017B123 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 06/30/1980 |
From: | CHIANGI N J CAROLINA POWER & LIGHT CO. |
To: | OREILLY J P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML18017B123 (3) | |