ML081230554: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000275/2008007]]
| number = ML081230554
| issue date = 05/01/2008
| title = IR 5000275-08-007 and 05000323-08-007, on 04/29/2008, Diablo Canyon Power Plant - Site-Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Draft Temporary Instruction Inspection
| author name = Lantz R E
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Conway J T
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| document report number = IR-08-007
| document type = Inspection Report, Letter
| page count = 3
}}
See also: [[followed by::IR 05000275/2008007]]
 
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
    OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
May 1, 2008
 
Mr. John T. Conway Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3 Mail Code B32
San Francisco, CA  94177-0001
SUBJECT: DIABLO CANYON POWER PLANT - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES DRAFT TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION
REPORT 05000275/2008007 AND 05000323/2008007)
Dear Mr. Conway:
In a telephone conversation on April 29, 2008, Messrs. Steven Hamilton and John Kirkland
made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Diablo Canyon Power Plant.  The inspection is planned for the week of June 16, 2008.
In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than May 23, 2008.  Please have available on site at the beginning of the inspection the arrangements and
documents listed in Enclosure 2.  Mr. Steven Hamilton has been advised of this request and provided with the name and address of the NRC lead inspector and the Office of Nuclear Reactor Regulation inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information.  Send comments on any UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV611 RYAN PLAZA DRIVE, SUITE 400ARLINGTON, TEXAS 76011-4005
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  Pacific Gas and Electric Company - 2 -
  OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at margie.janney@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
Thank you for your cooperation in this matter.  If you have any questions regarding this
inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.
      Sincerely, 
  /RA/  Ryan E. Lantz, Chief  Operations Branch      Division of Reactor Safety
Dockets:  50-275; 50-323
Licenses:  DPR-80; DPR-82
Enclosures: 1. Documentation Requested  Prior to the Inspection
2. Arrangements/Documents Requested  To Be Available Onsite during the  Inspection Week
cc w/enclosure: Steven Hamilton  Diablo Canyon Operations and  Station Director, Pacific Gas and  Electric Company Diablo Canyon Power Plant P.O. Box 56
Avila Beach, CA  93424
cc w/o enclosure: 
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  Pacific Gas and Electric Company - 3 -
  OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
  James R. Becker, Vice President  Diablo Canyon Operations and  Station Director, Pacific Gas and  Electric Company Diablo Canyon Power Plant
P.O. Box 56 Avila Beach, CA  93424
Jennifer Post, Esq. Pacific Gas and Electric Company
P.O. Box 7442 San Francisco, CA  94120
}}

Revision as of 14:00, 20 September 2018