Regulatory Guide 1.110: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML003740332 | ||
| issue date = | | issue date = 03/31/1976 | ||
| title = Cost Benefit Analysis for Radwaste Systems for Light-Water-Cooled Nuclear Power Reactors | | title = Cost-Benefit Analysis for Radwaste Systems for Light-Water-Cooled Nuclear Power Reactors | ||
| author name = | | author name = | ||
| author affiliation = NRC/RES | | author affiliation = NRC/RES | ||
Line 9: | Line 9: | ||
| docket = | | docket = | ||
| license number = | | license number = | ||
| contact person = | | contact person = | ||
| document report number = RG-1.110 | | document report number = RG-1.110 | ||
| document type = Regulatory Guide | | document type = Regulatory Guide | ||
| page count = | | page count = 87 | ||
}} | }} | ||
{{#Wiki_filter:U.S. NUCLEAR REGULATORY COMMISSION | {{#Wiki_filter:U.S. NUCLEAR REGULATORY | ||
COMMISSION | |||
REGULATORY | |||
GUIDE OFFICE OF STANDARDS | |||
DEVELOPMENT | |||
REGULATORY | |||
GUIDE 1.110 COST-BENEFIT | |||
ANALYSIS FOR RADWASTE S LIGHT-WATER-COOLED | |||
NUCLEAR PDWE& CRS'March 1976 4 USNRC REGULATORY | |||
GUIDES Commen.l shoutd be Sent to Rhe Secretary of the Comm,ssion U S Nuclea, %equietoy Guido* ate issued to describe and meeks ovelablto ,he pubic Rogulstory Comminssion Washington. | |||
0 C 2065. Attention Docketing end methods acceptable go the NRC staff of4 impementing specific pairt of the S Commission'& | |||
fegulatione. | |||
to definetel technique mused by the state in evild The guides are issued in the following ten broad divisions at"ig *pecific problems or postulated accidents. | |||
0r to provide guidance to eppli cents Regulatory Gudes am not substitutes for regulamons. | |||
end compliance I Power Reactors 5 Products with thenm ile rot reCed Methods end soutione diflerent fron those get out i I Research end Test Reactors 7 Tronsponstion Ihe guidell we be acceptable It they provide a bahis for lthe findings requrlit to 3 Fueuls and Materiels Facilities a Occupolionat | |||
4palt h the mesnee of -permst of Scenes by the Commitssion | |||
4 Environmental and Siting 2 Antitrust Review Commentd Isid uggestiOi$e | |||
#0F imPtoSetfitC | |||
it #hbae gtaldel We entcouraged S Materialt end Plant Protection | |||
10 General ot anll. end guidss Wil be Revised. a. a41pp1rop1riete. | |||
to accommodate corn asmon ed ho wtc intormatiotn or e*perieot Ifowoer comments on Copies of published guides may be obtained by wistten .squett indicating Cth Ofu guide. A received within Oboins two month$ chatret. issuance. | |||
will be divisions desired to the U S Nuclear Regulators Commission Wshtington | |||
0 C ticfady orssIul Mt evaluating the teed = of an srly viision 20566. Attention Director. | |||
Office of Standerde Development TABLE OF CONTENTS Page | |||
==A. INTRODUCTION== | |||
....................................................................... | |||
1.110-5 | |||
==B. DISCUSSION== | |||
R | |||
....................................................................... | |||
1.110-5 C. REGULATORY | |||
POSITION ......................................................... | |||
1.110-6 D. IMPLE14ENTATION | |||
................................ | |||
.................................. | |||
1.110-6 APPENDIX A, PROCEDURES | |||
FOR PERFORMING | |||
COST-BENEFIT | |||
ANALYSES ........................... | |||
1.110-7 APPENDIX B. BASES FOR PARAMETERS | |||
USED IN PERFORMING | |||
COST-BENEFIT | |||
ANALYSES .............................................................................. | |||
1.110-17 LIST OF APPENDIX B COST ESTIMATE SHEETS ............................................... | |||
1.110-19 REFERENCES | |||
TO APPENDIX B .............................................................. | |||
1.110-85 APPENDIX C, DATA NEEDED FOR RADWASTE TREATMENT | |||
SYSTEM COST-BENEFIT | |||
ANALYSIS FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS ...................................... | |||
1.110-86 SAMPLE ESTIMATE SHEETS ................................................................ | |||
1.110-88 1.110-3 LIST OF TABLES Table Page A-1 Direct Costs -Gaseous Radwaste Augments ................................ | |||
1.110-8 A-2 Annual Operating Costs -Gaseous Radwaste Augments; | |||
Liquid Radwaste Augments ..................................................... | |||
1.110-10 A-3 Annual Maintenance Costs -Gaseous Radwaste Augments; | |||
Liquid Radwaste Augments ..................................................... | |||
1.110-12 A-4 Labor Cost Correction Factors ........................................... | |||
1.110-13 A-5 Indirect Cost Factors ................................................... | |||
1.110-14 A-6 Capital Recovery Factors ................................................ | |||
1.110-15 B-1 Indirect Costs .......................................................... | |||
1.110-18 LIST OF FIGURES Figure Page A-1 Electric Power Supply Areas in the United States ........................ | |||
1.110-16 1.110-4 | |||
==A. INTRODUCTION== | ==A. INTRODUCTION== | ||
. | Section I1.D of Appendix I, "Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion | ||
'As Low As Is Reasonably Achievable' | |||
. | for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents," to 10 CFR Part 50, "Licensing of Produc tion and Utilization Facilities," requires that liquid and gaseous radwaste systems for light water-cooled nuclear power reactors include all items of reasonably demonstrated technology that, when added to the system sequentially and in order of diminishing cost-benefit return, can, for a favorable cost-benefit ratio, effect reductions in dose to the population reasonably expected to be within 50 miles of the reactor. Values of $1000 per man-rem and $1000 per man-thyroid-rem are given as interim criteria pending the development and establishment of better criteria. | ||
Compliance with Section II.D of Appendix I to 10 CFR Part 50 (which specifically addresses doses to the population) | |||
... | and Sections IL.A, 11.8, and II.C (which address doses to nearby individuals) | ||
. | is required to meet the criterion, "as low as is reasonably achievable." To'implement the requirements of Appendix I, the NRC staff has developed a series of guides providing methods acceptable to the staff for the calculation of effluent releases, dispersion of effluents in the atmosphere and different water. bodies, associated radiation doses to man, and cost-benefit aspects of treating radwastes. | ||
.. | |||
This regulatory guide describes a method for performing a cost-benefit analysis for liquid and gaseous radwaste system components. | |||
The procedures and models provided in this guide will be subject to continuing review by the staff with the aim of providing greater flexibility to the applicant in meeting the require ments of Appendix I. As a result of such reviews, it is expected that alternative acceptable methods for calculation will be made available to applicants and that calculational procedures found to be unnecessary will be eliminated. | |||
==B. DISCUSSION== | ==B. DISCUSSION== | ||
Each applicant for a permit to construct or a license to operate a light-water-cooled nuclear power reactor and each licensee with a license to operate a light-water-cooled nuclear power reactor is required to provide reasonable assurance that the design objectives for as low as is reasonably achievable effluent releases are satisfied by the liquid and gaseous radwaste system designs. It is the objective of this guide to provide an acceptable method of performing cost-benefit analysis, in conformance with Section II.D of Appendix I, to demonstrate that the plant design includes all items of reasonably demonstrated technology for reducing the cumula tive population dose due to releases of radioactive materials from the reactor to levels as low as reasonably achievable. | |||
As an interim measure the Conmnission chose values of $1000 per man rem and $1000 per man-thyroid-rem (or lesser values if demonstrated to be suitable for a particu lar site) to be used to implement the cost-benefit analysis. | |||
Because the Commission has not outlined any | Because the Commission has not outlined any procedures for including the effects of inflation in the analysis, the NRC staff's analysis is based on 1975 dollars; i.e., neither the costs nor the interim criteria are escalated for the predicted effects of inflation. | ||
Since the worth of a man-rem or man-thyroid-rem to the public is subject to the same fluctuations in value as the cost of equipment to reduce radioactive emissions, the NRC staff believes this approach to be reasonable. | |||
use, or proposed for use, at light-water-cooled nuclear power reactors | The NRC staff has outlined a method for performing the required cost-benefit analysis and has provided cost parameters for estimating the costs for the various radwaste treatment equip ment items in use, or proposed for use, at light-water-cooled nuclear power reactors. | ||
The methodology and cost parameters are presented in Appendix A to this guide. The costs presented. | |||
consider the direct equipment cost and the costs of building space, supportive services, mainte nance, interest, and operating as well as other costs generally considered in analyzing capital and operating costs in power plant estimating. | |||
C. | The bases for the costs calculated by the NRC staff are given in Appendix B.1-110-5 C. REGULATORY | ||
1. In accordance with Section II.D, Appendix I | POSITION 1. In accordance with Section II.D, Appendix I to 10 CFR Part 50, each applicant for a permit to construct a light-water-cooled nuclear power reactor should demonstrate by means of a cost benefit analysis that further reductions to the cumulative dose to the population within a 50-mile radius of the reactor site cannot be effected at an annual cost of $1000 per man-rem or $1000 per man-thyroid-rem (or such lesser costs as demonstrated to be suitable for a particular case). 2. The cost-benefit analysis should consider the reduction in releases of radioactive material from all effluent pathways. | ||
Liquid and gaseous radwaste system augments considered in the analysis should be selected in order of diminishing cost-benefit returns. | |||
3. All costs should be given in terms of 1975 dollars (as is the $ | 3. All costs should be given in terms of 1975 dollars (as is the $1000 per man-rem cost with which they are compared). | ||
Allowances for Inflation after 1975 should not be factored into the cost estimates. | |||
4. The method of calculation described in Appendix A and the parameters presented in Appendix B of this guide are acceptable to the NRC staff for performing the cost-benefit analysis. | 4. The method of calculation described in Appendix A and the parameters presented in Appendix B of this guide are acceptable to the NRC staff for performing the cost-benefit analysis. | ||
5. In support of the cost-benefit analysis, the applicant | 5. In support of the cost-benefit analysis, the applicant should provide a complete evaluation including methodology used, components considered, and all assumptions and parameters used. Information to be submitted by the applicant Is described in Appendix C to this guide. Use of parameters, assumptions, and models different from those given in Appendices A and B to this guide may result in differences between the evaluations by applicants and those by the NRC staff. Because of this, these parameters and assumptions should be clearly described and substantiated by the applicant. | ||
===0. IMPLEMENTATION === | |||
The purpose of this section is to provide information to license applicants and licensees regarding the NRC staff's plan for using this regulatory guide. Except in those cases in which the applicant proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of construction permit applications docketed after June 4, 1976 unless this guide is revised as a result of suggestions from the public or additional staff review. If an applicant wishes to use this regulatory guide in developing submittals for applications docketed on or before June 4, 1976, the pertinent portions of the application will be evaluated on the basis of this guide.1.110-6 APPENDIX A PROCEDURES | |||
FOR PERFORMING | |||
COST-BENEFIT | |||
ANALYSES This appendix contains guidance for performing cost-benefit analyses on individual system augments, as well as the parameters needed for estimating costs. The bases for the parameters and worksheets appropriate for use with the following cost-benefit procedure are given in Appendix B. 1. The cumulative population man-rem exposure and man-thyroid-rem exposure should be determined for each effluent release source, e.g., liquid radwaste releases, ventilation releases, etc. 2. Potential reductions to the cumulative population exposure should be determined based on the addition of items of reasonably demonstrated technology which have the potential to reduce releases of radioactive materials. | |||
3. Acceptable methods for performing some of the calculations need for items 1 and 2 above are contained in Regulatory Guides 1.109, "Calculation of Annual Doses to.Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I," and 1.111, "Methods for Estimating Atmospheric Transport and Dispersion for Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors," and in two regulatory guides now in prepara tion on the subjects of (1) calculation of releases of radioactive materials In liquid and gas eous effluents from light-water-cooled reactors and (2) methods for estimating aquatic dispersion of liquid effluents from routine reactor releases for the purpose of implementing Appendix I. 4. The total annual cost of each augment considered in item 2 above should be determined as follows: a. The Total Direct Cost (TOC): (1) Obtain the direct cost of equipment and materials from Table A-1. (2) Multiply the direct labor cost obtained from Table A-1 by the appropriate labor cost correction factor from Table A-4 to obtain the corrected labor cost for the geographtcal area from Figure A-l, in which the plant is to be built. (3) Add the costs obtained from steps (1) and (2) to obtain the Total Direct Cost. b. Obtain-the appropriate Indirect Cost Factor (ICF) from Table A-S. c. Determine Total Capital Cost (TCC) by using the equation: | |||
TCC -TDC x ICF d. Obtain the appropriate Capital Recovery Factor (CRF) from Table A-6. e. Determine the Annual Fixed Cost (AFC) by using the equation: | |||
AFC = TCC x CRF f. Obtain the Annual Operating Cost (AOC) and the Annual Maintenance Cost (AMC) from Tables A-2 and A-3. Multi-unit sites using shared radwaste systems should multiply the AOC by the number of reactors sharing the augment. | |||
3. Acceptable methods for performing some of the | |||
4. The total annual cost of each augment considered in item 2 above should be determined as follows: | |||
(1) Obtain the direct cost of equipment and materials from Table A-1. | |||
(2) Multiply the direct labor cost obtained from Table A-1 by the appropriate labor cost correction factor from Table A-4 to obtain the corrected labor cost for the | |||
(3) Add the costs obtained from steps (1) and (2) to obtain the | |||
b. Obtain-the appropriate Indirect Cost Factor (ICF) from Table A- | |||
c. Determine Total Capital Cost (TCC) by using the equation: | |||
TCC | |||
d. Obtain the appropriate Capital Recovery Factor (CRF) from Table A-6. | |||
e. Determine the Annual Fixed Cost (AFC) by using the equation: | |||
AFC = TCC x CRF | |||
g. Determine the Total Annual Cost (TAC) by using the equation: | g. Determine the Total Annual Cost (TAC) by using the equation: | ||
TAC | TAC | ||
5. Determine the "benefit" of each augment by multiplying the dose reduction calculated in item 2 above by $ | * AFC + AOC + AMC 5. Determine the "benefit" of each augment by multiplying the dose reduction calculated in item 2 above by $1000 per man-rem and/or $1000 per man-thyroid-rem, as appropriate. | ||
6. The system should be augmented with any items for which the TAC from item 4.g above is less than the value calculated in item 5, in the order of diminishing cost-benefit. | 6. The system should be augmented with any items for which the TAC from item 4.g above is less than the value calculated in item 5, in the order of diminishing cost-benefit. | ||
1.110-7 TABLE A-1 DIRECT COSTS -GASEOUS RADWASTE AUGMENTS Direct- Costs (1975 $1000) Equipment/Material Labor Total BWR Offgas Recombiner | |||
-GASEOUS RADWASTE AUGMENTS | 553 255 808 3-ton Charcoal Adsorber 53 14 67 Desiccant Dryer 218 176 394 Charcoal Vault Refrigeration | ||
116 38 154 Main Condenser Vacuum Pump Charcoal/HEPA | |||
Filtration System 40 8 48 Clean Steam to Turbine Glands 81 215 296 Clean Steam to Steam Valves. 24" and Larger 137 110 247 Clean Steam to Steam Valves, 2-1/2" and Less Than-24" 183 55 238 15,000-cfm HEPA Filtration System 52(49)* 16(14)* 68(63)* 1,000-cfm Charcoal/HEPA | |||
Filtration System 28 10 38 15,000-cfm Charcoal/HEPA | |||
Turbine Bldg. Chilled Water HVAC System 614 374 988 | Filtration System 97(93) 31(26) 128(119) 30,000-cfm Charcoal/HEPA | ||
600-ft 3 Gas Decay Tank 33 24 57 | Filtration System 157(152) 51(41) 208(193) Turbine Bldg. Chilled Water HVAC System 614 374 988 600-ft 3 Gas Decay Tank 33 24 57 PWR Hydrogen Recombiner | ||
419 147 566 PWR Air Ejector Charcoal/HEPA | |||
Filtration Unit 14 10 24 Steam Generator Flash Tank Vent to Main Condenser | |||
19 14 33 In cases where the equipment may be located either in the auxiliary building or the turbine building and common usage does not indicate a definite preference of one location or the other, cost for both locations are listed with the turbine building location cost in parenthesis. | |||
1.110-8 TABLE A-1 (Continued) | |||
DIRECT COSTS -LIQUID RADWASTE AUGMENTS Direct Costs 15-gpm Evaporator | |||
30-gpm Evaporator | |||
50-gpm Evaporator Evaporator Distillate Demineralizer | |||
50-gpm Demineralizer | |||
5. | 100-gpm Demineralizer | ||
200-gpm Deminieralizer | |||
400-gpm Demineralizer | |||
100-gpm Precoat Filter 400-gpw Precoat Filter 20-gpm Cartridge Filter 2-gpm Reverse Osmosis 10,000-gal Tank Equipment/Material | |||
386 540 655 36 43 64 94 102 108 202 13 100 55 1.110-9 Labor 201 223 233 24 29 31 35 44 56 112 11 38 43 (1975 $1000) Total 587 763 888 60 50 95 129 146 164 314 24 138 98 TABLE A-2 T ANNUAL OPERATING | |||
COSTS -GASEOUS RADWASTE AUGMENTS BWR Offgas Recoatbiner | |||
3-ton Charcoal Adsorber Desiccant Dryer Charcoal Vault Refrigeration Main Condenser Vacuum Pump Charcoal/HEPA | |||
Filtration System Clean Steam to Turbine Glands Clean Steam to Steam Valves, 24" and Larger Clean Steam to Steam Valves, 2-1/2" and Less Than 24" 15,000-cfm HEPA Filtration System 1,000-cfm Charcoal/HEPA | |||
Filtration System 15,000-cfm Charcoal/HEPA | |||
Filtration System 30,000-cfm Charcoal/HEPA | |||
Filtration System Turbine Bldg. Chilled Water HVAC System 600-ft 3 Gas Decay Tank PWR Hydrogen Recombiner PWR Air Ejector Charcoal/HEPA | |||
Filtration Unit Steam Generator Flash Tank Vent to Main Condenser Total Operating Cost 3 (1975 $lOOO/yr)neg 3 4 0.4 24 3 3 6 2 7 9 49 neg 4 4 1 ANNUAL OPERATING | |||
COSTS -LIQUID RADWASTE AUGMENTS Evaporation | |||
-PWR Dirty Waste Evaporation | |||
-BWR Dirty Waste Evaporation | |||
-Condensate Polisher Chemical Waste Evaporation | |||
-Detergent Waste Demineralization | |||
-kvaporator Distillate Demineralization | |||
-BWR 2nd Waste Demineralizer in Series 50 169 114 20 5 15 Operating costs are given for a single reactor. Operating costs for augments in shared radwaste systems should be multiplied by the number of reactors serviced by the augment.1.110-10 K B r m m TABLE A-2 (Continued) | |||
ANNUAL OPERATING | |||
COSTS -LIQUID RADWASTE AUGMENTS Total Operating Cost (1975 $1000/yr)5 Demineralization | |||
-PWR Clean Waste Demineralization | |||
-BWR Dirty Waste Demineralization | |||
-PWR Dirty Waste Demineralization | |||
-PWR Turbine Bldg. Drains Desmineralization | |||
-PWR Steam Generator Blowdown Precoat Filter -BWR Dirty Waste Cartridge Filter Reverse Osmosis -Detergent Waste 10,000-gal Tank 88 18 95 25 53 7 7 1 1.110-11 TABLE A-3 ANNUAL MAINTENANCE | |||
COSTS- GASEOUS RADWASTE AUGMENTS Total Maintenance Cost (1975 $1O00/Yr) | |||
BWR Offgas Recombiner | |||
20 3-ton Charcoal Adsorber neg Desiccant Dryer 6 Charcoal Vault Refrigeration | |||
3 Main Condenser Vacuum Pump Charcoal/HEPA | |||
Filtration System 1 Clean Steam to Turbine Glands 4 Clean Steam to Steam Valves, 24" and Larger 4 Clean Steam to Steam Valves, 2-1/2" and Less Than 24" 12 15,000-cfm HEPA Filtration System 2 1,000-cfm Charcoal/HEPA | |||
Filtration System 0.6 15,O00-cfm Charcoal/HEPA | |||
Filtration System 9 30,000-cfm Charcoal/HEPA | |||
Filtration System 18 Turbine Bldg. Chilled Water HVAC System 20 600-ft 3 Gas Decay Tank neg PWR Hydrogen "Recombiner | |||
10 PWR Air Ejector Charcoal/HEPA | |||
Filtration Unit 2 Steam Generator Flash Tank Vent to Main Condenser | |||
1 ANNUAL MAINTENANCE | |||
COSTS -LIQUID RADWASTE AUGMENTS 15-gpm Evaporator | |||
30 30-gpm Evaporator | |||
30 50-gpm Evaporator | |||
30 Evaporator Distillate Demineralizer | |||
2 50-gpm Demineral izer 5 lO0-gpmi Demineralizer | |||
5 200-gpm Demineral izer S 100-gpm Precoat Filter 10 400-gpm Precoat Filter 10 20-gpm Cartridge Filter 1 2-gpm Reverse Osmosis g 10.000-gal Tank 2 1.110-12 TABLE A-4 LABOR COST CORRECTION | |||
FACTORS Labor Cost Correction Factor 1.6 1.5 1.0 1.4 1.1 1.2 1.3 1.2 See Appendix B, "Labor See Figure A-1.Cost Correction Factors.'1.110-13 FPC Geographic Region I 1II IV V VI VII Vlll TABLE A-5 INDIRECT COST FACTORS Type Radwaste System "1. Single unit site, unitized radwaste system 2. Multi-unit site, shared radwaste system 3. Multi-unit site, unitized radwaste system Indirect Cost Factor 1.75 1.75 1.75 + (n-1)1.5 n where n is the number of unitized radwaste systems at the site Each reactor has a separate, nonshared radwaste system.I..1.110-14 TABLE A-6 CAPITAL RECOVERY FACTORS Cost of Honey (1 per year, i)5 6 7 8 9 10 11 12 13 14 15 Capital Recovery Factor 0.0651 0.0726 0.0806 0.0888 0.0973 0.1061 0.1150 0.1241 0.1334 0.1428 0.1523 service life of 30 years and the follwing equation: | |||
CRF M + 1)3 (I + i)30-1 1.110-15*Based on a LEGEND ¶Im REGIONAL GROUPING OF POWER SUPPLY AREAS FIGURE A-1 ELECTRIC POWER SUPPLY AREAS IN THE UNITED STATES (C C | |||
APPENDIX B BASES FOR PARAMETERS | |||
USED IN PERFORMING | |||
COST-BENEFIT | |||
ANALYSIS This appendix contains detailed cost estimate sheets showing the methods and parameters used to obtain all costs associated with augments considered for the liquid and gaseous radwaste systems. The cost estimate sheets are grouped by radwaste system types. The first sheet in each case is an equipment cost worksheet for determining direct equipment costs. The second sheet is an operating cost worksheet. | |||
All costs are stated in terms of 1975 dollars. No attempt has been made to project the effect of inflation. | |||
Variations of labor costs and productivity with site locaticns are considered.* | |||
All costs are based on the assumption that the reactor is in the design stage and that augmentation of a radwaste system will not involve backfltting of an existing plant. Backfltttng costs should be determined on a case-by-case basis. 1. Capital Costs Capital costs are reported by grouping items by system and by plant location, which gen erally follow the NRC (AEC) accounting system given in NUS-531 (Ref. 1). The direct costs considered to be applicable to radwaste systems are structures, electrical services, equipment, and instrumentation and controls. | |||
Spare parts and a contingency allowance** | |||
are included in the direct costs. Total capital costs are obtained by multiplying direct costs by an indirect cost factor. 2. Direct Cost Direct costs for each augment include equipment, site labor, and site materials. | |||
2. | |||
Principal equipment designs and hardware costs were obtained from utility companies, architect-engineers, and vendors. Costs for building space, electrical services, piping, and instrumentation were estimated considering equipment functions and arrangements. | |||
Costs for electric services, piping, and instrumentation and controls were determined using judgment to estimate equipment layout, points of interface, and services required. | |||
The costs for equipment and building space are consistent with'NRC staff recommendations for radwaste sys tem quality assurance, materials, and seismic design. Space requirements were determined based on manufacturer's data or data from existing or proposed layout drawings. | |||
3. Labor Cost Correction Factors Labor cost adjustment factors were developed for each Of the eight FPC electric power supply areas shown in Figure A-I of Appendix A by calculiting the average labor cost-for selected cities (Ref. 2) in each area and adjusting this cost for estimated variations in labor productivity due only to differences In labor practices in the regions considered. | |||
Appendix B | Manpower costs were calcu lated by multiplying the estimated labor requirements in man-hours by the composite wage rate (Ref. 3). The calculated labor cost correction factors are tabulated in Table A-4 of Appendix A. 4. Indirect Cost Factor Indirect costs asa percentage of direct costs are calculated in Table B-1. Location effects of the eight FPC Power Supply areas are estimated and shown in Table A-4 of Appendix A. Contingency onsite labor and process equipment and material are all based on-l0%.1.110-17 TABLE 8-1 K..INDIRECT COSTS 1st Unit, Subsequent Percentage of Units. Percentage Direct Cost of Direct Cost Construction facilities, equiment, and services 10 5 Engineering and construction managment services 20 10 Other owner s costs 10 S Interest during construction | ||
3S 35 Total 75 SS *Based on a lOs/yr interest rate and a 4-year construction time for radaste systems only. Interest during construction Is estimated to be 25% of direct costs plus other indirect costs. This is equivalent to 351 of the direct costs. The Indirect escalators (factors) | |||
were estimated from preliminary architect/engineering data to be used to update the DOM concept and ORCOST computer codes. S. Operation And Maintenance Costs Annual expenses for operation and maintenance (O&N) of the radwaste treatment systes were estimated for baseload power plants operating at 801 capacity factor. Manpower and supply costs were estimated by considering equipment functions it each case. Expenses for gases, steam, resins, auxiliary por. and other supplies and services were assessed individually. | |||
Appendix B to | Maintenance costs were evaluated according to the type of service for which the equipment could be used. Operating costs include estimated manpower costs, costs of utilities and supplies, and effects on supporting plant systems Interfacing with the augmented radmste system (e.g., effect of an evaporator augment on the solid waste syste). Also included are costs of handling wastes such as spent resins, demineralizer regenerants, evaporator bottoms, and filter media, as well as offsite handling, transportation, and burial costs. 6. Capital Recovery Factor The capital recovery factor Is a levelized annual charge which takes into account the cost of borroved money and the depreciation of assets. It Is calculated from the expression: | ||
I(1 #)o (I + ~where i a cost of borrowed money expressed as a decimal P -plant operating lifetime (yr) In calculating the values used in Table A-S of Appendix A. a plant operating lifetime of 30 years was used. The capital recovery factor multiplied by the total capital cost will give the annual dollar charges for capital and capital-related expenses.1.110-18 LIST OF APPENDIX B COST ESTIMATE SHEETS Page Numiber BW Offgas Recmbiner | |||
............................................................. | |||
LABOR | 1.110-20 3-ton Charcoal Adso r ............................................................... | ||
SUPPLIES | 1.110-22 Desiccant Dryer .............................................................. | ||
1.110-24 Charcoal Vault Refrigeration | |||
......................................................... | |||
1.110-26 Charcoal/HEPA | |||
Filtration System -Condenser Vacuun Pump .............................. | |||
1.110-28 Clean Steam to Turbine Glands ........................................................ | |||
1.110-30 Clean Steam to Steam Valves 24- and Larger ........................................... | |||
1.110-32 Clean Steam to Steam Valves 2-1/2' and Less Than 24" ................................ | |||
1.110-34 1S.000-cftm NEPA Filtration System .................................................... | |||
1.110-36 1000-cfa Charcoal/HEPA | |||
Filtration System ............................................. | |||
1.110-39 15.000-cfm Charcoal/HEPA | |||
Filtration System ........................................... | |||
1.110-41 30,000-cfm Charcoal/HEPA | |||
Filtration System .......................................... | |||
1.110-44 Turbine Building Chilled Mater HVAC System ........................................... | |||
1.110-47 600-ft 3 Gas Decay Tank ............................................................... | |||
1.110-49 PIW Hydrogen Recombiner | |||
.............................................................. | |||
1.110-S1 PiW Air Ejector Charcoal/HEPA | |||
Filtration Unit ........................................ | |||
1.110-53 Stem Generator Flash Tank Vent to rain Condenser | |||
.................................... | |||
1.110-55 Evaporators | |||
.......................................................................... | |||
1.110-57 Evaporator Distillate Demineralizer | |||
.................................................. | |||
1.110-64 Demineralizers | |||
....................................................................... | |||
1.110-66 Cartridge Filter ..................................................................... | |||
1.110-76 Precoat Filters ...................................................................... | |||
.114 7R Reverse Osmosis ..................................................................... | |||
1.110-81 10.000-gal Tank ........................................................... | |||
1.11" 1.110-19 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment ITEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.RUD D r.mh4n.... 11 I___MIXL_ | |||
1 IVIML COST ESTIMATE DIRECT COST.(1975 | |||
$1000) r1 T DMUT'/MATrD | |||
TAt BASIS FOR 90 260 350 single unit, catalytic type w/heater and condenser, w/o instrumentation and controls, stainless steel, ASME VIII BUILDING ASSIGNMENT | |||
100 50 ISO 30' x 40' x 25' @ $5/ft 3 (turbine building shielded area) ASSOCIATED | |||
PIPING SYSTEMS 18 12 30 augment piping connections only INSTRUM4ENTATION | |||
AND CONTROLS 24 96 120 allowance ELECTRICAL | |||
SERVICE neq 4kw heaters on vessels neglected SPARE PARTS 85 85 75K for catalyst + 2% E/M in items 1 & 4 above SUBTOTAL 232 503 735 CONTINGENCY | |||
23 50 73 10% TOTAL DIRECT COSTS 2S5 553 808 r a O (S...... .................. | |||
w BWR Off %e Darr-M--- | |||
Ick- a, I a W i IARND TflYAi K A ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR-LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment BWR Offgas Recombiner (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR, SUPERVISION, 3.3 15 m.n/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND. 20.0 routine conditioning of catalyst and LABOR equipment upkeep; 5% of E/M including I&C CONSUMBLES, CHEMICALS, AND -initem 2 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal Water Steam neg intemittent; | |||
4kw heater load is negligible Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 23.3 1. 2.C2 ,01 3. 4. 5.I | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment !TFM 1. PROCESS EQUIPENT | |||
===2. BUILDING ASSIGNMENT=== | |||
3. 4. S. 6. 7. 8.3-ton Charcoal Adsorber (Sheet 1)LABOR 5 DIRECT COST (1975 $1000) EOUIPMENTIMATERIALS | |||
TOTAL-------44.0 49.0 BASIS FOR COST ESTIMATF carbon steel, 350 psig, 200 ft 3 volume (augment to existing train of beds)4. 4. 4. 4 8 4.5 12.5 10' x 10' x 25' * $5/ft 3 (turbine building shiel4ed area)ASSOCIATED | |||
PIPING SYSTES -in item I INSTRUKENTATION | |||
AND CONTROLS neg ELECTRICAL | |||
5. | SERVICE neg SPARE PARTS none existing SUBTOTAL 13 48.5 61.5 CONTINGENCY | ||
1 5.0 6.0 10% TOTAL DIRECT COSTS 14 53.5 67.5 r r a S.. .... ....r m K ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 3-ton Charcoal Adsorber (Sheet 2) COST (1975 $1000)I TFM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR. SUPERVISION. | |||
neg AND OVERHEAD MAINTENANCE | |||
MATERIAL AND allowance of 3% of equipment cost LABOR neg is negligible CONSUMABLES. | |||
CHEMICALS, AND SUPPLIES neg lifetime use of charcoal assumed UTILITIES | |||
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND M ANNUAL COST neg K 1. 2. 3. 4.I..5. | |||
2. | |||
4. | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Desiccant Drver fSheet !1 I TEN I ARflR DIRECT COST (1975 $1000)IL 1% COTETMT BASIS FOR 1. PROCESS EQUIPMENT 25 75 100 redundant dryer vessels with 1 regeneration skid BUILDING ASSIGNMENT | |||
LABOR | 95 50 145 40' x 36' x 20' @ $5/ft 3 turbine building (shielded area) ASSOCIATED | ||
PIPING SYSTEMS 10 5 15 augment piping connections only INSTRUMENTATION | |||
SUPPLIES | AND CONTROLS 12 48 60 allowance ELECTRICAL | ||
SERVICE 18 17 35 service for heaters, blowers, pumps, and compressors SPARE PARTS 3 3 SUBTOTAL 160 198 358 CONTINGENCY | |||
16 20 36 10% TOTAL DIRECT COSTS 176 218 394 r 2.8i 3. 4. 5.6. 7. 8.(r Desiccant Drver (Sheet I) | |||
K ANNUAL CPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Desiccant Dryer (Sheet 2) COST (1975 $1000)I Ahfl flTIIP TflTAI BASIS FOR COST ESTIMATE ITEM itri,,, ........ .... OPERATING | |||
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 6.1 5% of equipment including I&C LABOR CONSUMABLES, CHEMICALS, AND neg SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal neg operating time does not require Water neg significant utilities and services Steam Electricity neg Building Services Other TOTAL 0 AND M ANNUAL COST 9.4 K K 1. 2. 3 4.C U'S. | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREAThENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment ITEM Charcoal Vault Refrigeration (Sheet 1)10AM DIRECT COST (1975 $1000)LAORFlIITDUdCNT/UATCDTA1 C YffAS IfC et.V BASIS FOR 1. PROCESS EQUIPMENT | |||
===2. BUILDING ASSIGNMENT=== | |||
3. 4. 5. 6. 7. 8.10 75 85 10-ton capacity, 3 refrigerators with drives, 32°F design I t 4-4 9 3 12 20' x 10' x 201 0 $2/ft 3 turbine building (nonshielded area)ASSOCIATED | |||
PIPING SYSTEMS In item 1 INSTRUMENTATION | |||
AND CONTROLS 4 6 10 allowance ELECTRICAL | |||
SERVICE 12 18 30 allowance SPARE PARTS 3 3 SUBTOTAL 35 105 140 CONTINGENCY | |||
3 11 14 10% TOTAL DIRECT COSTS 38 116 154 0 N 14 Ch (TftTAI | |||
K ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COO.EO | |||
NUCLEAR REACTORS Description of Augment Charcoal Vault Refriceration (Sheet 2)'TIn'COST (1975 $1000) rTeR TOTAL FOR COST OPERATING | |||
LABOR, SUPERVISION. | |||
3.3 15 min/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND LABOR 3.7 51 of equlpemt CONSUMABLES, CHEMICALS, AND in Item 2 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal Water Steam 0.5 electricity and cooling water Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 7.5 K K 1. 2. 3. 4. S. | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
2. BUILDING ASSIGNMENT | SYSTEM FOR LIGHT-WATER-COOLED | ||
NUCLEAR REACTORS Description of Augment Charcoal/HEPA | |||
3. | Filtration System -Condenser Vacuum Pump (Sheet 1)ITE4 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.LABOR__ ~ LrILumLAL | ||
4 | IUIAL COST ESTIMATE D IRECT COST (1975 $1000)2 32.5 34.5 2000 CFM preftlter/4" charcoal bed/HEPA @ S15/cfm, 10 kw heater @ $250/kw BUILDING ASSIGNMENT | ||
5. | 3.1 1.5 4.6 Turbine building 8' x 16, x 12' @ $3/ft 3 (nonshielded area) ASSOCIATED | ||
PIPING' SYSTEMS 1.3 0,7 2.0 allowance INSTRUMENTATION | |||
7. | AND CONTROLS in item 1 ELECTRICAL | ||
8. | SERVICE 1 1.5 2.5 SPARE PARTS 0.5 0.5 SUBTOTAL 7.4 36.7 44.1 CONTINGENCY | ||
.7 3.7 4.4 10% TOTAL DIRECT COSTS 8.1 40.4 48.5 (Nm wO (i n *BASIS FOR I | |||
K K ANNUAL OPERATING | |||
ANr MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Charcoal/HEPA | |||
Filtration System -Condenser Vacuum Pump (Sheet 2) COST (1975 $1000) 'ueD TfllhI RAmie FflQ tOI[IT F¢;TTMATF OPERATING | |||
LABOR, SUPERVISION, neg used only during startup and shutdown AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 1.2 4 HEPA filters @ $150 & 2 Charcoal filters LABOR @ $900, change every 2 years CONSUMABLES, CHEMICALS, AND in items 2 and 4 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal 0.2 S50/HEPA filter, $100/Charcoal filter Water Steam Electricity Building Services Other 1.4 5. TOTAL 0 AND M ANNUAL COST_______________________ | |||
I _________ | |||
________ _______________________________ | |||
K I.2. 3. 4.'.4 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment STT F M 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.Clean Steam to Turbine Glands (Sheot 1)I ARAR DIRECT COST (1975 $1000) FOIITDMFNTIMATPRTAI | |||
ITEMP 15 150 TflTAI 165 BASIS FOR VCTttMATO 25,000 lb/hr reboiler I $4/lb/hr I $25K/H.P. | |||
turbine glands BUILDING ASSIGNMENT | |||
19 10 29 20' x 30' x 16' 6 $3/ft 3 ASSOCIATED | |||
PIPING SYSTEMS 32 18 50 equiv 1000 ft 0 $50/ft INSTRUMENTATION | |||
AND CONTROLS 8 12 20 in addition to Item I ELECTRICAL | |||
3 | SERVICE nag SPARE PARTS 5 5 SUBTOTAL 74 195 269 CONTINGENCY | ||
7 20 27 10% TOTAL DIRECT COSTS 81 215 296 r C r K K SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Clean Steam to Turbine Glands (Sheet 2) COST (1975 $1000)1TR4 LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 4.0 40 man-days LABOR CONSUMABLES, CHEMICALS, AND SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal Water Steam 21.0 10 Btu/kw-hr heat rate increase Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 28.3 ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT 9'I. 2. 3. 4. 5. | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Clean Steam to Steam Valves 2 4" and Larger (Sheet 1)ITEM I AMII DIRECT COST (1975 $1000) n:*.:TDAACLIMATDTai PROCESS EQUIPMENT | |||
100 120 220 22 valves @ $1OK/valve, use existing reboiler BUILDING ASSIGNMENT | |||
neg install in existing space ASSOCIATED | |||
PIPING SYSTEMS -in item 1 INSTRUMENTATION | |||
AND CONTROLS -in Item 1 ELECTRICAL | |||
SERVICE neg SPARE PARTS 5 SUBTOTAL 100 125 225 CONTINGENCY | |||
10 12 22 10% TOTAL DIRECT COSTS 110 137 247 BASIS FOR 0 i%1J I. 2. 3. 4. S. 6. 7. 8.(r TnTAI | |||
-\ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM1 FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Clean Steam to Steam Valves 24" and Larger (Sheet 2) COST (1975 $1000)TT!M LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 4.0 40 man-days LABOR CONSUMABLES, CHEMICALS, AND neg SUPPLIES UTILITIES | |||
hND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 7.3 K 1. 2. 3. 4.w U, | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment ITEM 1. PROCESS EQUIPMENT 2. 6. 3. 7.e . w .h 4. 5. 6. 7. 8.Clean Steam to Steam Valves 2-1/2N and Less Than 24" (Sheet 1)LAB 0 DIRECT COST (1975 $1000) OR EQUIPMENT/MATERIALS | |||
120 TOTAl_120 BASIS FOR 100 valves 0 $1200 each BUILDING ASSIGNMENT | |||
--neg ASSOCIATED | |||
PIPING SYSTEMS 40 20 60 INSTRUMENTATION | |||
AND CONTROLS 10 20 30 allowance ELECTRICAL | |||
SERVICE -none SPARE PARTS -6 6 SUBTOTAL 50 166 216 CONTINGENCY | |||
5 17 22 10% TOTAL DIRECT COSTS 55 183 238 I (TOTAL COS ESTIMATE | |||
K SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Clean Steam to Steam Valves 2-1/2" and Less Than 24" (Sheet 2)COST (1975 $1000)ITEM LABOR OTN!R OPERATING | |||
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 12.0 1% of direct cost of equipment LABOR CONSUMABLES, CHEMICALS, AND -in item 2 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND H ANNUAL COST 15.3 A ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT K-a a U'1. 2. 3. 4. S.TNTAI | |||
Description of Augment TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS 15,000-cfm HEPA Filtration System -Auxiliary Building (Sheet 1)BASIS FOR rACT rCTTMATr II Anna flTl .r.. --.n .- L , I r. I~p~ ERq~ X rr...L./ n n. v, .., .1. PROCESS EQUIPMENT 40.0 45.0 prefilter/HEPA | |||
@ $3/cfm, use existing fan BUILDING ASSIGNMENT | |||
7 4.5 11.5 16' x 12' x 12' @ $5/ft 3 (nonshielded area) ASSOCIATED | |||
PIPING SYSTEMS 3 2.0 5.0 INSTRUMENTATION | |||
AND CONTROLS in item 1 ELECTRICAL | |||
SERVICE base SPARE PARTS 0.5 0.5 SUBTOTAL 15 47.0 62.0 CONTINGENCY | |||
1 5.0 6.0 10% TOTAL DIRECT COSTS 16 52.0 68.0 ((I ADflD DIRECT COST (1975 $1000) £rI"TDUCMT | |||
MATrTAI C 5 TfllAI ,o L. a'2. 3. 4. 5. 6. 7. 8.( | |||
K FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 15,000-cfm HEPA Filtration System -Turbine Building (Sheet 2)I AflI DIRECT COST (1975 $1000) lI TDMCWNT IMATrOAIC TflTAL BASIS FOR COST ESTIMATE ITEM !L___ f ______________ | |||
PROCESS EQUIPMENT | |||
5 40.0 45.0 skid mounted filter housing w/o fans BUILDING ASSIGNMENT | |||
4.6 2.3 6.9 16' x 12' x 12' @ $3/ft 3 (nonshielded area) ASSOCIATED | |||
PIPING SYSTEMS 3 2.0 5.0 INSTRUMENTATION | |||
AND CONTROLS in item 1 ELECTRICAL | |||
SERVICE base SPARE PARTS 0 0.5 0.5 SUBTOTAL 12.6 44.8 57.4 CONTINGENCY | |||
2 4.0 6.0 10l TOTAL DIRECT COSTS 14.6 48.8 63.4 T TOTAL DIRECT COST ESTIMATE SHEET OF RADWASrE TREATMENT | |||
SYSTEM K-I 1. 2. 3. 4. 5. 6. 7. a.! | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 15,000-cfm HEPA Filtration ITEM LABOR System (Sheet 3) COST (1975 $1000)OTI4FR TflTAI OPERATING | |||
LABOR, SUPERVISION, 3.8 15 min/shift | |||
+ 40 hr annual test AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 2.2 change every 2 yrs @ $150/filter element LABOR CONSUMABLES, CHEMICALS, AND in items 2 and 4 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal 0.8 $50/filter element Water Steam Electricity | |||
1.0 additional fan electrical load Building Services Other TOTAL 0 AND M ANNUAL COST 7.8 (I. 2. 3.I RACTC Frn rncT FCTIMATC 4. 5.I_ | |||
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 1000-cfm Charcoal/HEPA | |||
Filtration System (Sheet 1)I TEM LABOR DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS | |||
TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT | |||
2.0 22.0 24.0 prefllter/4" charcoal/HEPA | |||
@ $20/cfm, 5 kw htr @ $400/kw BUILDING ASSIGNMENT | |||
3.8 2.0 5.8 8' x 12' x 12' @ $5/ft 3 (nonshielded area) ASSOCIATED | |||
PIPING SYSTEMS 1.3 .7 2.0 INSTRUMENTATION | |||
AND CONTROLS in item 1 ELECTRICAL | |||
SERVICE 1.5 1.0 2.5 SPARE PARTS 0.5 0.5 SUBTOTAL 8.6 26.2 34.8 CONTINGENCY | |||
1.0 2.0 3.0 10% TOTAL DIRECT COSTS 9.6 28.2 37.8 K 0 I. 2. 3. 4. 5. 6. 7. 8. | |||
ANNUAL OPERATING | |||
2. BUILDING ASSIGNMENT 97 | AND MAINTENANCE | ||
3. ASSOCIATED PIPING SYSTEMS | COST ESTIMATE SHEET OF RADWASTE TREATMENT | ||
SYSTEM FOR LIGHT-WATER-COOLED | |||
5. | NUCLEAR REACTORS Description of Augment 1000-cfm Charcoal/HEPA | ||
Filtration System (Sheet 2) COST (1975 $1000) ITEM LABOR OTHER TOTAL BASIS FOR COST £STII4ATF OPERATING | |||
7. CONTINGENCY | LABOR, SUPERVISION, 1.9 20 min/day + 40 hr annual test AND OVERHEAD MAINTENANCE | ||
8. TOTAL | 14ATERIAL | ||
AND .6 2 HEPA or prefilters | |||
@ $150 each and 1 charcoal @ $900 each every 2 yrs' CONSUMABLES, CHEMICALS, AND in items 2 and 4 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal .1 $50/HEPA or prefilter, $100/charcoal Water filter Steam Electricity neg Building Services Other 5. TOTAL 0 AND M ANNUAL COST 2.6____________________________ | |||
____________ | |||
I I ( __ (1. 2. -3. 0-- | |||
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 15,OOO-cfm Charcoal/HEPA | |||
Filtration System -Auxiliary Building (Sheet 1)TTVM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.LABOR 10 DIRECT COST (1975 $1000) EQUIPMENT/MATERIALS | |||
71 TOTAL 81 BASIS FOR COST ESTIMATE prefilter/4" charcoal/HEPA | |||
@ $5/cfm, 30kw htr @ $200/kw BUILDING ASSIGNMENT | |||
12 8 20 16' x 20' x 12' @ $5/ft 3 (nonshielded area) ASSOCIATED | |||
PIPING SYSTEMS 3 2 5 INSTRUMENTATION | |||
AND CONTROLS -In Item 1 ELECTRICAL | |||
SERVICE 3 2 5 allowance SPARE PARTS 5 5 4 elements of each type SUBTOTAL 28 88 116 CONTINGENCY | |||
3 9 12 10% TOTAL DIRECT COSTS 31 97 128 K a COST ESTIMATE ITE LABO..... | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment I TEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.15,000-cfm Charcoal/HEPA | |||
Filtration System -Turbine Building (Sheet 2)I fuND DIRECT COST (1975 $1000) CN "I lDMrLT ATEDIlA1 C ITEM x flMrnR 1.3 UTflYAI I_____ ARAL?~urIIn~LJIUL | |||
UIt.IW BASIS FOR 10.0 71.0 81.0 prefilter/4* | |||
charcoal/HEPA | |||
@ $5/cfm, 30 kw htr @ $200/kw BUILDING ASSIGNMENT | |||
7.7 3.8 11.5 16' x 20' x 121 @ $3/ft 3 (nonshielded area) ASSOCIATED | |||
PIPING SYSTEMS 3.0 2.0 5.0 INSTRUMENTATION | |||
AND CONTROLS in item 1 ELECTRICAL | |||
SERVICE 3.0 2.0 5.0 allowance SPARE PARTS 5.0 5.0 4 elements each type SUBTOTAL 23.7 83.8 107.5 CONTINGENCY | |||
2.0 9.0 11.0 10% TOTAL DIRECT COSTS 25.7 92.8 118.5 r (0 .rg ( | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREAThENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 15,O00-cfm Charcoal/HEPA | |||
Filtration System (Sheet 3)COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR. SUPERVISION, 3.8 15 min/shift | |||
& 40-hr annual test AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 9.0 30 HEPA or prefilters | |||
@ $150 each & 15 LABOR charcoal filters @ $900 each every 2 yrs CONSUMABLES, CHEMICALS, AND in Items 2 and 4 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal 1.5 $S50/HEPA | |||
or prefilter, $100/charcoal Water Steam Electricity | |||
1.3 8kw additional fan power for filter aP Building Services 0.018.S/kw-hr Other TOTAL 0 AND M ANNUAL COST 15.6 K K 1. 2. 3. 4.0 5. | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS 30.00O-cfm Charcoal/HEPA | |||
Filtration System -Auxiliary Building (Sheet 1)i ARng~DIRECT COST (1975 $1000) FoII PI4FNTII4ATFRIALS | |||
-¶ a 1n FnrMN/AEIL | |||
1. PROCESS EQUIPMENT 15 117.0 TOTAL 132.0 BASIS FOR COST ESTIMATE pref1lter/4" charcoal/HEPA | |||
@ $4/cfm, 60-kw htr @ $200/kw BUILDING ASSIGIMENT | |||
4. | 20 13.6 33.6 28' x 20' x 12' $S5/ft 3 (nonshielded area) ASOCIATED | ||
PIPING SYSTEMS 5 3.0 8.0 base INSTRUMENTATION | |||
5. TOTAL | AND CONTROLS -in item I ELECTRICAL | ||
SERVICE 6 4.0 10.0 allowance SPARE PARTS 5.0 5.0 4 elements each type SUBTOTAL 46 142.6 188.6 CONTINGENCY | |||
5 14.0 19.0 10% TOTAL DIRECT COSTS 51 156.6 207.6 C Description of Augment I ITU a 2. 3. 4. 5. 6. 7. 8.( | |||
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 30,000-cfm Charcoal/HEPA | |||
Filtration System -Turbine Building (Sheet 2)ITEM LAROR DIRECT COST (1975 $1000) !OtITPHt¶!rT/ATrR | |||
TALS TflTA[BASIS FOR PROCESS EQUIPMENT | |||
15.0 117.0 132.0 prefilter/4" charcoal/HEPA | |||
@ $4/cfm, 60kw htr @ $200/kw BUILDING ASSIGNMENT | |||
13.4 6.8 20.2 28' x 20' x 12' @ $3/ft 3 (nonshielded area) ASSOCIATED | |||
PIPING SYSTEMS 3.0 5.0 8.0 base INSTRUMENTATION | |||
AND CONTROLS in item 1 ELECTRICAL | |||
SERVICE 6.0 4.0 10.0 allowance SPARE PARTS 5.0 5.0 4 elements each type SUBTOTAL 37.4 137.8 175.2 CONTINGENCY | |||
4.0 14.0 18.0 l0 TOTAL DIRECT COSTS 41.4 151.8 193.2 y me 1. 2. 3. 4. 5. 6. 7. 8. | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
LABOR | NUCLEAR REACTORS Description of Augment 30.00O-cfm Charcoal/HEPA | ||
Filtration System -(Sheet 3)COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR £OST FSTTMATF OPERATING | |||
LABOR, SUPERVISION, 3.8 15 min/shift | |||
+ 40 hr annual test AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 18.0 60 HEPA or prefilters | |||
5. | @ $150 each & 30 LABOR charcoal filters @ $900 each every 2 yrs CONSUMABLES, CHEMICALS, AND -in items 2 and 4 SUPPLIES UTILITIES | ||
AND SERVICES Waste Disposal 3.0 $50/HEPA or preftilter, $1007charcoal filter Water Steam Electricity | |||
2.6 16kw additional fan HP for filter @ Building Services 0.018 S/ku-hr Other TOTAL 0 AND M ANNUAL COST 27.4__ C 2. " 3. 4. 5.-: -ý:r t- -.-J" | |||
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment ITEM 1. PROCESS EQUIPMENT 2. BUILDING 3. 4. 5. 6. 7. 8.Turbine Building Chilled Water HVAC System (Sheet 1) LABOR 300 DIRECT COST (1975 $1000) EOUJIPMFNTIMATFRIALS | |||
TnIMNIAEIL | |||
1 nA 500 TflTAI 800 BASIS FOR rnCT CTMATC 500-ton capacity, w/o air filters-t + I Coolers can be Installed in existing space saved by deletion of ductin | |||
====g. ASSOCIATED ==== | |||
PIPING SYSTEM; -in item 1 INSTRUMENTATION | |||
AND CONTROLS -in item 1 ELECTRICAL | |||
SERVICE 40 so 90 SPARE PARTS -8 8 1% item 1 SUBTOTAL 340 558 898 CONTINGENCY | |||
34 56 90 10l TOTAL DIRECT COSTS 374 614 988 K 11 0 -J | |||
SUPPLIES | ANNUAL OPERATING | ||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTE14 FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Turbine Building Chilled Water HVAC System (Sheet 2)COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 20.0 2-1/2% of equipment costs LABOR CONSUMABLES, CHEMICALS, AND -initem 2 SUPPLIES UTILITIES | |||
AND SERVICES Waste Disposal Water 13.0 500 gpm @ 104/1000 gal & 50% load factor Steam Electricity | |||
33.0 400 kw @ 0.018 $/kw hr Building Services Other TOTAL 0 AND M ANNUAL COST 69.3 C r I. 2. 3. 4..0 0 S.C | |||
K Description of Augment K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT. | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS 600-ft 3 Waste Gas Decay Tank' (Sheet 1)I TFM LABOR DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS | |||
2. | TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT | ||
2.5 20 22.5 600-ft 3 , 150 pslgo C.S., ASME VIII BUILDING ASSIGNMENT | |||
3. CONSUMABLES, CHEMICALS, AND | 18.0 9 27.0 15' x 15' x 20' @ S6/ft 3 (shielded area) ASSOCIATED | ||
SUPPLIES | PIPING SYSTEMS 1.0 1 2.0 10% of item 1 INSTRUMENTATION | ||
AND CONTROLS neg ELECTRICAL | |||
@ $ | SERVICE neg SPARE PARTS neg SUBTOTAL 21.5 30 51.5 CONTINGENCY | ||
2.0 3 5.0 10% TOTAL DIRECT COSTS 23.5 33 56.5 K I | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 600-ft 3 Waste Gas Decay ITEM LABOR Tank (Sheet 2) COST (1975 $1000)OTHER TOTAL OPERATING | |||
LABOR, SUPERVISION, AND OVERHEAD neg MAINTENANCE | |||
MATERIAL AND LABOR neg CONSUMABLES, CHEMICALS, AND SUPPLIES neg UTILITIES | |||
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND N ANNUAL COST neg I. 2. 3. 4.FflR 0 U' 0~e 5.( | |||
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM Description of Augment IT"M 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS PWR Hydrogen Recombiner (Sheet 1)IARno 50.0 DIRECT COST (1975 $1000) | |||
TAI TflTAI I l :fTI b V VT nA. I 300.0 350.0 BASIS FOR rnqT vtTTMATF skid mounted, catalytic type w/condenser, partial I&C single unit, ASME VIII BUILDING ASSIGNM4ENT | |||
28.8 14.4 43.2 15' x 30' x 16' 0 $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEMS 32.0 13.0 45.0 allowance INSTRUMENTATION | |||
AND CONTROLS 10.0 40.0 50.0 allowance ELECTRICAL | |||
SERVICE 13.0 12.0 25.0 allowance SPARE PARTS -2.0 2.0 SUBTOTAL 133.8 381.4 515.2 CONTINGENCY | |||
13.0 38.0 51.0 101 TOTAL DIRECT COSTS 146.8 419.4 566.2 K a Ue ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADtWASTE | |||
TREAThENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment PUR Hydrogen Recombiner (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCEMATERIAL | |||
AND. 10.0 3% of equipment cost LABOR CONSUMABLES, CHEMICALS, AND 1.0 oxygen @.S2.5/103 cf & .25 cfm 0 SUPPLIES 7000 hrs UTILITIES | |||
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 14.3 1. 2. 3. 4.Ca I U'S.K C | |||
Description of Augment ITEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS PWR Air EJector Charcoal/HEPA | |||
Filtration Unit (Sheet 1)LABOR 3.0 DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS | |||
7.5 TOTAL 10.5 1*BASIS FOR COST ESTIMATE chiller, heater, charcoal HEPA BUILDING ASSIGNMENT | |||
3.0 1.5 4.5 10' x 10' x 15' @ $3/ft 3 (unshielded turbine bldg) ASSOCIATED | |||
PIPING SYSTEMS 2.0 1.0 3.0 allowance INSTRUMENTATION | |||
AND CONTROLS 0.5 1.5 2.0 allowance ELECTRICAL | |||
SERVICE 0.5 0.5 1.0 allowance SPARE PARTS 1.0 1.0 SUBTOTAL 9.0 13.0 22.0 CONTINGENCY | |||
1.0 1.0 2.0 1O0 TOTAL DIRECT COSTS 10.0 14.0 24.0 | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augnent PWR Air EJector Charcoal/HEPA | |||
Filtration Unit (Sheet 2)COST (1975 $1000)ITEM LARAR___ .....________________ | |||
I , L ueA5 rwK Guil r.4IrMIE OPERATING | |||
LABOR, SUPERVISION, 3.8 15 min/shift | |||
+ 40 hr annual test AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 2.0 includes replacement filter LABOR CONSUMABLES, CHEMICALS, AND -in item 2 SUPPLIES UTILITIES | |||
AND SERViCES Waste Disposal neg Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 5.8 flTIFD TnTAI l. 2. 3. 4.EP U'5.K DAete K K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment ITEM Steam Generator Flash LABOR Tank Vent to Main Condenser (Sheet DIRECT COST (1975 $1000) EQUIPMENT/MATERIALS | |||
1)TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT | |||
-no equipment required BUILDING ASSIGNMENT | |||
neg install In existing space ASSOCIATED | |||
PIPING SYSTEMS 13 7 20 200 ft of 10-in pipe with 2 valves INSTRUMENTATION | |||
AND CONTROLS 4 6 10 allowance ELECTRICAL | |||
SERVICE neg SPARE PARTS neg SUBTOTAL 17,, 13 30 CONTINGENCY | |||
2 1 3 10% TOTAL DIRECT COSTS 19 14 33 I.U't ull 2. 3. 4. 5. 6.7. 8. | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREAThENT SYSTEM FOR LIGHT-WATER-COOLED | |||
2. | NUCLEAR REACTORS Description of Augment Steam.Generator Flash Tank Vent to Main Condenser (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | ||
3. | LABOR, SUPERVISION, 1 allowance AND OVERHEAD MAINTENANCE | ||
4. | MATERIAL AND 1 2% Total Direct Cost LABOR CONSUHABLES, CHEMICALS, AND neg SUPPLIES UTILITIES | ||
AND SERVICES Waste Disposal Water neg Steam Electricity Building Services Other TOTAL 0 AND H ANNUAL COST 2 1. 2. 3. 4..a U'5.(( | |||
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment lSqpm Evaporator (Sheet 1)I AnRO DIRECT COST (1975 $1000)PROCESS EQUIPMENT | |||
30 225 255 skid mounted, submerged tube bundle, ASME VIII, Incoloy in contact with process fluid BASIS FOR | |||
===2. BUILDING ASSIGNMENT=== | |||
68 34 102 evap & services 25' x 301 x 20' @ $6/ft3 plus 2,000 ft3 increase in solid waste storage area ASSOCIATED | |||
PIPING SYSTEMS 35 30 65 inludes service piping INSTRUMENTATION | |||
AND CONTROLS 10 10 20 allowance ELECTRICAL | |||
SERVICE 40 25 65 allowance SPARE PARTS -27 27 2% of item 1 plus tube bundle SUBTOTAL 183 351 534 CONTINGENCY | |||
18 35 53 10% TOTAL DIRECT COSTS 201 386 587 ITI'N 1.a.3. 4. 5. 6. 7. 8. | |||
3 | |||
Description of Augment tTrW TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREAThENT'SYSTEM | |||
FOR LIGHT-WdATER-COOLED | |||
NUCLEAR REACTORS 30-gpm Evaporator (Sheet 2) , BASIS FOR rncT rCY?UAYT*.- -..rw-f .dV..r b.r ...I u snlrl.# ,nI .bl r~l) I lruI 1. PROCESS EQUIPMENT | |||
===2. BUILDING ASSIGNMgNT=== | |||
30 t 88 350 44 380 132 ASME VIII skid mounted, submerged, 'tube bundle, Incoloy in contact with process fluid evap + services -25' x 40' x 20' @ $6/ft 3 plus 2,000 ft 3 Increase In solid waste storage area ASSOCIATED | |||
PIPING SYSTEMS 35 35 70 includes service piping INSTRUMENTATION | |||
AND CONTROLS 10 10 20 allowance ELECTRICAL | |||
SERVICE 40 25 65 allowance SPARE PARTS 27 27 2% of Item 1 plus tube bundle SUBTOTAL 203 491 694 CONTINGENCY | |||
20 49 69 1O0 TOTAL DIRECT COSTS 223 540 763 C C I AfPtflD DIRECT COST (1975 $1000) rfIITDfMlrTIMATrDTAI | |||
TnTA, CO 3. 4. 5. 6. 7. 8. | |||
7. | |||
K FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 50-qpm Evaporator (Sheet 3)ITEM 1. PROCESS EQUIPMENT 2. 3. 4. S. 6. 7. 8.LABOR 30 DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS | |||
450 TOTAL 480 BASIS FOR COST ESTIMATE ASME VIII skid mounted, submerged, tube bundle, Incoloy In contact with process fluid BUILDING ASSIGNMENT | |||
97 48 145 10% more than 30 gpm ASSOCIATED | |||
PIPING SYSTEMS 35 35 70 allowance INSTRUMENTATION | |||
AND CONTROLS 10 10 20 allowance ELECTRICAL | |||
SERVICE 40 25 65 allowance SPARE PARTS. 27 27 2% of Item 1 plus tube bundle SUBTOTAL 212 595 807 CONTINGENCY | |||
21 60 81 10% TOTAL- DIRECT COSTS 233 655 888 T TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMErNT | |||
SYSTEM'III a Description of Augment 50-gpm Evaporator (Sheet 3) | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment | |||
-RUR Dirty Ua~tm-Finn, £1 COST (1975 $1000)ITEM LABOR OT14ER TOTAL BASIS FOR LOST FSTIMATF OPERATING | |||
LABOR, SUPERVISION, 12 2.6 x 106 gpy; 1000 hrs/yr labor AND OVERHEAD MAINTENANCE | |||
MATERIAL AND 30 7-1/2% of equipment cost LABOR CONSUMABLES, CHEMICALS, AND neg concentrate solidification chemicats SUPPLIES in item 4 UTILITIES | |||
AND SERVICES Waste Disposal 70 100:1 feed to concentrate ratio @ 20/ft 3 disposal cost Water 27 1000 gpm @ 1500 hrs @ 30t/1000 gal Steam 60 1500 hrs steaw @ 20,000 lb/hr @ $2/1000 lbs Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 199 C C 1. 2. 3. 4. 5. | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Evaporator PWR DirtylT YM[AROR Waste (Sheet 5) COST (1975 $1000)OTHER TOTAL BASIS FOR COST ESTTMATE OPERATING | |||
LABOR, SUPERVISION, AND OVERHEAD 6.0 500,000 gpy; 500 hrs/yr labor MAINTENANCE | |||
MATERIAL AND LABOR 30.0 7-1/2% of equipment cost CONSUMABLES, CHEMICALS, AND -concentrate solidification chemicals SUPPLIES in item 4 UTILITIES | |||
AND SERVICES 50:1 feed to concentrate ratio @ $20/ft 3 Waste Disposal 27.0 disposal cost Water 5.0 1000 gpm @.277 hrs @ 30t/1000 gal Steam 12.0 277 hrs steam @S 20,000 4bs/hr @ $2/1000 lbs Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 80.0 ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT K I. 2. 3. 4.0'5. | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
LABOR | NUCLEAR REACTORS Description of Augment EvaDorator | ||
-Condenser Polisher Chemical IaCto Ih +0 A COST (1975 $1000)ITEMFR CS UK LU ETIMATE OPERATING | |||
LABOR, SUPERVISION, AND OVERHEAD 6.0 650.000 gpy; 500 hr/yr labor MAINTENANCE | |||
MATERIAL AND LABOR 30.0 7-1/2% of equipment cost CONSUMABLES, CHEMICALS. | |||
AND concentrate solidification chemicals SUPPLIES In item 4 UTILITIES | |||
AND SERVICES Waste Disposal 87.0 20:1 feed to concentrate ratio @ $20/ft 3 Wl7.0 disposal cost Water 6.5 1000 gpm 0 360 hrs @ 30*/10OO gal Steam 14.4 360 hrs steam @ 20,000 lb/hr @ $2/1000 lbs Electricity Building Services Other LABOR 0ATD AU TC4TAI TOTAL 0 AND M ANNUAL COST 143.9 C 0 1. 2. 3. 4. 5.(v K SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment-hla~aum*., Um.4.a Iqkaa÷ COST (1975. $1000)TT!M LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR | LABOR, SUPERVISION, AND OVERHEAD 6.0 160,000 gpy; 500 hrs/yr MAINTENANCE | ||
MATERIAL AND LABOR 30.0 7-1/25 of equipment cost CONSUMABLES, CHEMICALS, AND -concentrate solidification chemicals In SUPPLIES item 4 UTILITIES | |||
SUPPLIES | AND SERVICES Waste ITsposal 8.6 50:1 feed to concentrate ratio 0 $20/ft 3 disposal cost Water 1.6 1000 gpm 0 90 hrs 0 30t/1000 gal Steam 3.6 90 hrs steam 0 20,000 lb/hr 1 $2/1000 lbs Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 49.8 ANNUAL OPERATING | ||
AND MAI[NTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT K I. 2. 3. 4.ad a, LeD 5. | |||
3 disposal cost | |||
Description of Augment TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
6 | NUCLEAR REACTORS Evaporator Distillate Demineralizer (Sheet 1)TTIrM I anAD DIRECT COST (1975 $1000) EniI nlrT IUA?~nAi e*,-. I.rluvn Iuu~rnllu~r'¶l KhMiLR IJI/L W,5MII EIHMAIT PROCESS EQUIPMENT | ||
2. | 4.0 20.0 24.0 30 ft 3 , SS. ASME VIII, 150 psi nonregenerative, w/resin BUILDING ASSIGNMENT | ||
6.4 3.2 9.6 10' x 10' x 16' @ $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEMS 9.0 6.0 15.0 2" piping INSTRUMENTATION | |||
AND CONTROLS 2.0 3.0 5.0 remote conductivity readout ELECTRICAL | |||
SERVICE neg SPARE PARTS 1.0 1.0 SUBTOTAL 21.4 33.2 54.6 CONTINGENCY | |||
2.0 3.0 5.0 10% TOTAL DIRECT COSTS 23.4 36.2 59.6 BASIS FOR C (1. 2.i Ot 3. 4. 5. 6. 7. 8.(qrft*IrA I | |||
3 | )K SYSTEM FOR LIGHT-WATER-COOLED | ||
5. TOTAL | NUCLEAR REACTORS Description of Augment Evaporator Distillate Demineralizer (Sheet 2) COST (1975 $1000)YtM I ARnlQ OTHER TOTAL BASIS FOR COST ESTIMATE aI1II ____________ | ||
OPERATING | |||
LABOR, SUPERVISION. | |||
1.8 1500 hrs operation | |||
@ 10% attendance AND OVERHEAD MAINTENANCE | |||
MATERIAL AND LABOR 2.0 allowance CONSUMABLES, CHEMICALS, AND SUPPLIES 2.3 1 change per yr @ $75/ft 3 UTILITIES | |||
LABOR | AND SERVICES Waste Disposal 0.6 30 ft 3 @ $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 6.7 ANNUAL OPERATING | ||
AND MAINTENANCE | |||
SUPPLIES | COST ESTIMATE SHEET OF RADWASTE TREATMENT I. 2. 3. 4.,ap 5. | ||
3 | |||
3 | |||
3 | |||
3 disposal cost | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
6 | NUCLEAR REACTORS Description of Augment 50-opDemintralzer Sh t 1)ITEM LAROR DIRECT COST (1975 $1000) 1ITOM AUIFRAI It TIhTAI BASIS FOR CflCY 1T tMAr" PROCESS EQUIP4ENT | ||
5 20.0 25.0 30 ft 3.SS, VIII. 150 psi, nonreganerative, with resin BUILDING ASSIGNMENT | |||
3 | 9 4.8 13.8 12' x 12' x 16' 0 $6/ft 3 (shielded ASSOCIATED | ||
PIPING SYSTEMS 9 6.0 15.0 2" piping INSTRUMENTATION | |||
AND CONTROLS 4 6.0 10.0 ELECTRICAL | |||
SERVICE No SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 27 38.8 66.8 CONTINGENCY | |||
3 | 2 4.0 6.0 10% TOTAL DIRECT COSTS 29 42.8 -71.8 C 1. 2. 3. 4. 5. 6. 7. 8.(C SO-gin | ||
3 | {Sheet 1) | ||
5. | K Description of Augment K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | ||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS 1O0-9pm Deminerallizer (Sheet 2) LANOR DIRECT COST (1975 $1000) PMFNT/MATFRTALS | |||
TOTAL BASIS FOR COST FSTTMATF PROCESS EQUIPMENT | |||
5 35.0 40.0 60 ft 3 , SS, ASME VIII, 150 psi, nonregenerative, with resin BUILDING ASSIGNMENT | |||
9 4.8 13.8 12' x 12' x 16' 0 $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEMS 10 10.0 20.0 2-1/21 piping INSTRUMENTATION | |||
AND CONTROLS 4 6.0 10.0 ELECTRICAL | |||
SERVICE neg SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 28 57.8 85.8 CONTINGENCY | |||
3 6.0 9.0 TOTAL DIRECT COSTS 31 63.8 94.8 I. 2. 3." 4. 5.a, 6. 7. B. | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWAST!E | |||
TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 20-plDmneralizer(Sheet | |||
3. | 3)__ITEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.LABOR 5 1T A DIRECT COST (1975 $1000) EflUIPI4FNTII4ATFRTAL 60.0 TflTAI 65.0 BASIS FOR rnCT r~tTuATr 120 ft 3 , SS, ASME VIII, i50 psi, nonregenerative, with resin BUILDING ASSIGNMENT | ||
11 5.2 16.2 13' x 13' x 16' 0 $6/ft 3 ___(shielded area) ASSOCIATED | |||
PIPING SYSTEMS 12 12.0 24.0 4" piping INSTRUMENTATION | |||
3 | AND CONTROLS 4 6.0 10.0 ELECTRICAL | ||
SERVICE neg SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 32 85.2 117.2 CONTINGENCY | |||
3 | 3 9.0 12.0 TOTAL DIRECT COSTS 35 94.2 129.2 ((200-gpm Oemtneraltzer (Sheet 3) | ||
K Description of Augment 400-gpm Demineralizer | |||
-Steam Generator Blowdown Service (Sheet 4)I TrM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.lAROR DIRECT COST (1975 $1000) EOUJIPMNT/MATERjALS | |||
TOTAL BASIS FOR COST ESTIMATE T I COST ESTIMATE 5 60.0 65.0 120 ft 3 , SS. ASME VIII, 150 psi, nonregenerative. | |||
with resin BUILDING ASSIGNMENT | |||
11 5.2 16.2 ,3' x 13' x 16' @ $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEMS 20 20.0 40.0 6" piping INSTRUMENTATION | |||
AND CONTROLS 4 6.0 10.0 allowance ELECTRICAL | |||
4. | SERVICE neg SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 40 93.2 133.2 CONTINGENCY | ||
4 9.0 13.0 TOTAL DIRECT COSTS 44 102.2 146.2 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS a, 'a ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment BWR-2nd Waste Demineralizer In Serf es (Sheet El COST (1975 $1000)ITEM_...._-_....__,,__ ,v-n -DROIO rvr uK EV)lr.1 ~PY.I OPERATING | |||
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE | |||
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND 9.0 1 change per year @ 120 ft 3 0 $75/ft 3 (one SUPPLIES vessel change per year. regardless of size) UTILITIES | |||
AND SERVICES Waste Disposal 2.4 120 ft 3 lyr * $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 19.7 1. 2. 3. 4.a -.J a 5.C lABOR NTNrD TJlTA! | |||
K ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Demineralizer | |||
-PWR Clean Wastes (Sheet 6) COST (197k. $1000)YY IPLu I flTurD?linI matie fflS EflM? rCTTMATe AILr IlV% -lll_ __ _ Ifl, &'flC I l nV bl *fll OPERATING | |||
LABOR, SUPERVISION, 1.8 10% of DRS shim bleed (50,000 gpy), AND OVERHEAD 30 min/day MAINTENANCE | |||
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND 3 3 SUPPLIES 2.3 30 ft /yr @ $75/ft3 UTILITIES | |||
AND SERVICES Waste Disposal 0.6 30 ft 3/yr @ $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 9.7 I 1. 2. 3. 4.a S. | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADIASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
LABOR | NUCLEAR REACTORS Description of Augment Demineralizer | ||
-BWR Dirty Waste (Sheet 7)COST (1975 $1000)JTFN[ABDR nlTHVg TNlT61 DACIC mnD r.ncT reTvUnt OPERATING | |||
SUPPLIES | LABOR, SUPERVISION, AND OVERHEAD 6.5 2.6 x 106 gpy, 30 min/shift MAINTENANCE | ||
MATERIAL AND LABOR 5.0 allowance CONSUNABLES, CHEMICALS, AND33 SUPALES 64.5 860 ft 3 resin 0 $75/ft 3 UTILITIES | |||
3 | AND SERVICES Waste Disposal 17.2 860 ft 3 @ $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND N ANNUAL COST 93.2 C I. 2. 3. 4.N S.---I C | ||
K ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Demineraltzer | |||
-PWR Dirty.Wastes (w/o turbine building) (Sheet 8) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR, SUPERVISION, AND OVERHEAD 3.3 500,000 gpy; 15 min/shift MAINTENANCE | |||
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND SUPPLIES 12.0 160 ft 3/yr @ $75/ft 3 UTILITIES | |||
AND SERVICES Waste Disposal 3.2 160 ft 3/yr @ $20/ft 3 disposal cost water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 23.5 l. 2. 3. 4.a 5./ | |||
ANNUAL OPERATIN AND | |||
COST ESTIMTE SHEET OF RADWASTE TREATMENT | |||
of Aujnmant flminapA147AP | |||
.DUo*7m, | |||
* pww-ITEM T. -a .* C1 *fm r uVfm "a 1.411W4b 7I COST (1975 $1000)--______ .... ..-. ",,' ,,,. urwl, rvuK I.UF)I LtIY:llrl OPERATING | |||
LABOR, SUPERVISION. | |||
AND OVERHEAD 13.1 1 hr/shift, 2.6 x 106 opy MAINTENANCE | |||
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND SUPPLIES 64.5 660 ft 3 resin 0 $75/ft 3 UTILITIES | |||
2 | AND SERVICES Waste Disposal 17.2 860 ft 3/yr 9 $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND N ANNUAL COST 99.8 I ARMR flTIIFA 1. 2. 3. 4.a S.(r SYSTEM FOR L.IGHT, oWATER-COOLEO | ||
NUCL..EAR,, REACTORS oAeTe -1-:j:.1i-:i...- | |||
3. | .......... | ||
-."( | |||
K Description of Augment Demineralizer | |||
-PIER tim Steam Generator Blowdomn (Sheet 10) COST (1975 $1000)nyu,..O inaI OPERATING | |||
LABOR, SUPERVISION. | |||
AND OVERHEAD 3.3 15 min/shift MAINTENANCE | |||
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AN" SUPPLIES 16.9 225 ft 3 resin/yr @ $75/ft 3 UTILITIES | |||
AND SERVICES Waste Disposal 4.5 225 ft 3/Yr I $20/ft 3 disposal cost Water Stem Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 29.7 A..UAL OPERATING | |||
2. | AND MAINTENANCE | ||
3. | COST ESTIMATE SHEET OF RADWASTE TREATMENT | ||
4. | SYSTEM FOR LIGHT-WATER-COOLED | ||
NUCLEAR REACTORS 2. 3. 4.ens rtnt ReTtMAta a I alLfl9 S. | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
6 | NUCLEAR REACTORS Description of Augment 20-qp Cartridge Filter (Sheet 1)TTFM I DIRECT COST (1975 $1000) vN Itur ¶ u'IIAqr rD lr e... t.J UIhLU 11MAT PROCESS EQUIPMENT | ||
2. | 2.0 5.0 7.0 SS, ASME VIII, 150 psi BUILDING ASSIGNMENT | ||
5.6 3.0 8.6 16' x 12' x 20' S $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEMS 1.5' 1.0 2.5 allowance INSTRUMENTATION | |||
AND CONTROLS 0.6 2.4 3.0 allowance ELECTRICAL | |||
4. | SERVICE neg SPARE PARTS 0.5 0.5 SUBTOTAL 9.7 11.9 21.6 CONTINGENCY | ||
1.0 1.0 2.0 10% TOTAL DIRECT COSTS 10.7 12.9 23.6 BASIS FOR-.4 Q at 1. 2. 3. 4. 5. 6. 7. 8.(20-qm Cartrtd9e Ftlter (Sheet 1) | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Cartridge Filter (Sheet 2) COST (1975 $1000)A'1JCDl RAM!S FOR COST ESTIMATE ITEM LADUK uini n , -... ...... .... ... .. OPERATING | |||
LABOR. SUPERVISION, 4.5 10 changes @ 10 man-hrs/change AND OVERHEAD @ $12/hr + 15 min/shift MAINTENANCE | |||
MATERIAL AND LABOR 1.0 allowance CONSUMABLES. | |||
CHEMICALS, AND SUPPLIES 1.0 10 changes/yr | |||
@ $100/change UTILITIES | |||
AND SERVICES Waste Disposal 1.5 10 drums/yr @ $20/ft 3 Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 8.0 1. 2. 3. 4. 5. | |||
5 | |||
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREAT1ENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 100-gpim Precoat Filter (Shoot 1)ITEM LARnR DIRECT COST (1975 $1000) fIW01T P~NT uI~dTIDTAI | |||
LABOR | PROCESS EQUIPMENT | ||
10 65.0 75 automated system 1 gpm/ft 2 , ASM4E VIII BUILDING ASSIGNMENT | |||
18 9.0 27 15' x 15' x 20' 0 $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEM4S 16 9.0 25 35% of equipment cost INSTRUMENTATION | |||
AND CONTROLS in item 1 ELECTRICAL | |||
SERVICE 7 13.0 20 allowance SPARE PARTS 2.0 2 2% of item 1 SUBTOTAL 51 98.0 149 CONTINGENCY | |||
5 10.0 15 10% TOTAL DIRECT COSTS 56 108.0 164 BASIS FOR 0 1. 2. 3. 4. 5. 6. 7. 8.(r i lO0-gpm Precoat Ftlter (Sheet 1) | |||
K FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 400-oam Precoat Filter T LAROR DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS | |||
TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT | |||
35 135.0 170 automated system; 1 gpm/ft 2 ASME Viii BUILDING ASSIGNMENT | |||
24 12.0 36 15' x 20' x 20' @ $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEMS 31 16.0 47 35% of equipment cost INSTRUMENTATION | |||
AND CONTROLS --item I ELECTRICAL | |||
SERVICE 12 18.0 30 allowance SPARE PARTS -3.0 3 SUBTOTAL 102 184.0 286 CONTINGENCY | |||
10 18.0 28 10% TOTAL DIRECT COSTS 112 202.0 314 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM K (Sheet 2)-J 1. 2. 3. 4. 5. 6. 7. 8.(Sheet 2)-vT | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTI1ATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Precoat Filter -BWR Dirty Waste (Sheet 3) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST !STTI4ATF OPERATING | |||
LABOR, SUPERVISION, AND OVERHEAD 6.6 2 x 106 gpy, 30 min/shift MAINTENANCE | |||
MATERIAL AND LABOR 10.0 allowance CONSUMABLES, CHEMICALS, AND 6.0 10 lbs precoat @ lOt/lb per 1000 gal SUPPLIES processed | |||
===4. UTILITIES === | |||
AND SERVICES Waste Disposal Water Steam Electricity Building Services Other 40.0 TOTAL 0 AND M ANNUAL COST j[ 62.6 1 ft 3/sludge per disposal cost 1000 qal processed | |||
2. | @ $30/ft 3 C 1. 2. 3.S.( | ||
3. | T TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | ||
4. | SYSTEM FOR LIGHT-WATER-COOLED | ||
5. | NUCLEAR REACTORS Description of Augment 2-com Reverse TTIFM LABOR DIRECT COST (1975 $1000) FOUlPMENTIMATFRIALS | ||
6. | TOTAL BASIS FOR COST ESTIMATF PROCESS EQUIPIENT | ||
6.0 60.0 66.0 skid mounted w/500-gal SS feed tank, ASME VIII BUILDING ASSIGNMENT | |||
8. | 19.2 9.6 28.8 12' x 25' x 16' @ $6/ft 3 ASSOCIATED | ||
PIPING SYSTEMS 3.0 2.0 5.0 allowance INSTRUMENTATION | |||
AND CONTROLS in item I ELECTRICAL | |||
SERVICE 7.0 13.0 20.0 allowance SPARE PARTS 6.0 6.0 SUBTOTAL 35.2 90.6 125.8 CONTINGENCY | |||
3.0 9.0 12.0 10% TOTAL DIRECT COSTS 38.2 99.6 137.8 K 0 1. 2. 3. 4. 5. 6. 7. 8.Osmosis (Sheet 1) | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment Reverse Osmosis -Detergent Wastes COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING | |||
LABOR, SUPERVISION, AND OVERHEAD 3.1 160.000 gpy, 1300 hrs/yr @ 20% attendance MAINTENANCE | |||
MATERIAL AND 8.8 4% less bldg + 24 module with 3-yr life LABOR @ $600 each CONSUMABLES, CHEMICALS. | |||
AND SUPPLIES neg UTILITIES | |||
AND SERVICES Waste Disposal 4.3 100:1 vol reduction | |||
2 | @ $20/ft 3 disposal cost Water Steam Electricity neg Building Services Other TOTAL 0 AND M ANNUAL COST 16.2 r C 1. 2. 3. 4.No 5.( | ||
FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 1O,000-Gallon Tank__(Sheet | |||
1)?tTrM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.I AROR 3 DIRECT COST (1975 $1000) !0IJ!P?4fNT/MATERIALS | |||
5 | TOTAL T -28 31 BASIS FOR COST ESTIMATE SS, ASME VIII, atmospheric service, 200°F BUILDING ASSIGNMENT | ||
30 15 45 15' x 20' x 25' @ $6/ft 3 (shielded area) ASSOCIATED | |||
PIPING SYSTEMS 2 1 3 10% of item 1 INSTRUMENTATION | |||
AND CONTROLS 4 6 10 allowance ELECTRICAL | |||
SERVICE neg SPARE PARTS neg SUBTOTAL 39 s0 89 CONTINGENCY | |||
4 5 9 10% TOTAL DIRECT COSTS 43 55 98 C w 10tOOO-GallonTapk (Sheet 1)TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREAThENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment 10000-Gallon Tank (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL RA~l flD OPERATING | |||
LABOR, SUPERVISION. | |||
AND OVERHEAD 1.1 5 min/shift | |||
1. | -log level readings MAINTENANCE | ||
MATERIAL AND LABOR 1.6 1/2% of equipment CONSUMABLES. | |||
2. "Wage Rates for Key Construction Trades," | CHEMICALS, AND neg SUPPLIES UTILITIES | ||
Engineering News Record, pp. 36-37, January 2, 1975. | AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND N ANNUAL COST 2.7 1. 2. 3. 4. 5.( | ||
REFERENCES | |||
TO APPENDIX B 1. "Guide for Economic Evaluation of Nuclear Reactor Plant Oesigns," USAEC Report NUS-531, NUS Corporation, January 1969. 2. "Wage Rates for Key Construction Trades," Engineering News Record, pp. 36-37, January 2, 1975. 3. "Projections of Labor Requirements for Electric Power Plants Construction, 1974 -2000," USAEC Report WASH-1334, Washington, D.C., August 1974.1.110-85 APPENDIX C DATA NEEDED FOR RADIIASTE | |||
TREATMENT | |||
SYSTEM COST-BENEFIT | |||
ANALYSIS FOR LIGHT-WATER | |||
COOLED NUCLEAR REACTORS This appendix describes information that should be submitted in support of radwaste treat ment system cost-benefit analyses for light-water-cooled nuclear reactors. | |||
The information should be consistent with the contents of the Safety Analysis Report (SAR) and Environmental Report (ER) for the proposed reactor. Appropriate sections of the SAR and ER containing more detailed discussions of the required information should be referenced as appropriate. | |||
Each response, however, should be Independent of the ER and SAR. All responses should be on a per reactor basis and should provide the following information: | |||
1. Detailed cost estimate sheets similar to those shown on the following pages listing all parameters (and their bases) used in determining capital, operating, and maintenance costs associated with all augments considered in the cost-benefit analysis. | |||
1. Detailed cost estimate sheets similar to those shown on the following pages listing all parameters (and their bases) used in determining capital, operating, and maintenance costs associated with all augments considered in the cost-benefit analysis | |||
All costs should be stated in terms of 1975 dollars. | |||
3. If methods and parameters used in the cost-benefit analysis are different from those | 2. The cost of borrowed money used in the cost analysis and the method of arriving at this cost. 3. If methods and parameters used in the cost-benefit analysis are different from those aiven in this guide, describe the methods used in detail and provide bases for all parameters. | ||
a. Decontamination factors assigned to each augment and fraction of "on-line" time assumed | Include the following information: | ||
b. Parameters and method used to determine | a. Decontamination factors assigned to each augment and fraction of "on-line" time assumed, i.e., hours per year used. b. Parameters and method used to determine the Indirect Cost Factor and the Capital Recovery Factor.1.110-87 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE'TREATMENT-SYSTEH | ||
FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS Description of Augment i Tru 1 AflfD DIRECT COST (1975 $1000) FflIIIPMFNT/MATFRlALS | |||
===1. PROCESS EQUIPMENT === | |||
=== | ===2. BUILDING ASSIGNMENT=== | ||
t I 1 I I I I I ASSOCIATED | |||
PIPING SYSTEMS BASIS FOR COST ESTIMATE I I I I --INSTRUMENTATION | |||
AND CONTROLS I I I I ELECTRICAL | |||
SERVICE I I I I 6. SPARE PARTS______________________I | |||
i mI SUBTOTAL________________________________________________________ | |||
1 -I I I CONTINGENCY | |||
I I I TOTAL DIRECT COSTS________________________________________________________ | |||
________________ | |||
I __________________________________________________ | |||
_____________ | |||
_______________________________________________ | |||
C TOTAL 0 3. 4. S.7. 8.(C i aunD EnUTPMENTIMATERIALS | |||
ANNUAL OPERATING | |||
AND MAINTENANCE | |||
COST ESTIMATE SHEET OF RADWASTE TREATMENT | |||
SYSTEM FOR LIGHT-WATER-COOLED | |||
NUCLEAR REACTORS 0 "I U 2 2 -4 U 2 2 C, a 9 9 'a w -J 04 0.j 'a "4 a. 0 "4 COST (1975 $1000)I TIFM | |||
===1. OPERATING === | |||
LABOR, SUPERVISION, AND OVERHEAD MAINTENANCE | |||
LABOR | MATERIAL AND LABOR CONSUMABLES, CHEMICALS, AND SUPPLIES UTILITIES | ||
SUPPLIES | AND SERVICES Waste Disposal Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST LABOR OTHER TOTAL BASIS FOR COST ESTIMATE Description of Augment U K 2. 3. 4. 5.ITEM}} | ||
{{RG-Nav}} | {{RG-Nav}} |
Revision as of 16:39, 31 August 2018
ML003740332 | |
Person / Time | |
---|---|
Issue date: | 03/31/1976 |
From: | Office of Nuclear Regulatory Research |
To: | |
References | |
RG-1.110 | |
Download: ML003740332 (87) | |
U.S. NUCLEAR REGULATORY
COMMISSION
REGULATORY
GUIDE OFFICE OF STANDARDS
DEVELOPMENT
REGULATORY
GUIDE 1.110 COST-BENEFIT
ANALYSIS FOR RADWASTE S LIGHT-WATER-COOLED
NUCLEAR PDWE& CRS'March 1976 4 USNRC REGULATORY
GUIDES Commen.l shoutd be Sent to Rhe Secretary of the Comm,ssion U S Nuclea, %equietoy Guido* ate issued to describe and meeks ovelablto ,he pubic Rogulstory Comminssion Washington.
0 C 2065. Attention Docketing end methods acceptable go the NRC staff of4 impementing specific pairt of the S Commission'&
fegulatione.
to definetel technique mused by the state in evild The guides are issued in the following ten broad divisions at"ig *pecific problems or postulated accidents.
0r to provide guidance to eppli cents Regulatory Gudes am not substitutes for regulamons.
end compliance I Power Reactors 5 Products with thenm ile rot reCed Methods end soutione diflerent fron those get out i I Research end Test Reactors 7 Tronsponstion Ihe guidell we be acceptable It they provide a bahis for lthe findings requrlit to 3 Fueuls and Materiels Facilities a Occupolionat
4palt h the mesnee of -permst of Scenes by the Commitssion
4 Environmental and Siting 2 Antitrust Review Commentd Isid uggestiOi$e
- 0F imPtoSetfitC
it #hbae gtaldel We entcouraged S Materialt end Plant Protection
10 General ot anll. end guidss Wil be Revised. a. a41pp1rop1riete.
to accommodate corn asmon ed ho wtc intormatiotn or e*perieot Ifowoer comments on Copies of published guides may be obtained by wistten .squett indicating Cth Ofu guide. A received within Oboins two month$ chatret. issuance.
will be divisions desired to the U S Nuclear Regulators Commission Wshtington
0 C ticfady orssIul Mt evaluating the teed = of an srly viision 20566. Attention Director.
Office of Standerde Development TABLE OF CONTENTS Page
A. INTRODUCTION
.......................................................................
1.110-5
B. DISCUSSION
R
.......................................................................
1.110-5 C. REGULATORY
POSITION .........................................................
1.110-6 D. IMPLE14ENTATION
................................
..................................
1.110-6 APPENDIX A, PROCEDURES
FOR PERFORMING
COST-BENEFIT
ANALYSES ...........................
1.110-7 APPENDIX B. BASES FOR PARAMETERS
USED IN PERFORMING
COST-BENEFIT
ANALYSES ..............................................................................
1.110-17 LIST OF APPENDIX B COST ESTIMATE SHEETS ...............................................
1.110-19 REFERENCES
TO APPENDIX B ..............................................................
1.110-85 APPENDIX C, DATA NEEDED FOR RADWASTE TREATMENT
SYSTEM COST-BENEFIT
ANALYSIS FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS ......................................
1.110-86 SAMPLE ESTIMATE SHEETS ................................................................
1.110-88 1.110-3 LIST OF TABLES Table Page A-1 Direct Costs -Gaseous Radwaste Augments ................................
1.110-8 A-2 Annual Operating Costs -Gaseous Radwaste Augments;
Liquid Radwaste Augments .....................................................
1.110-10 A-3 Annual Maintenance Costs -Gaseous Radwaste Augments;
Liquid Radwaste Augments .....................................................
1.110-12 A-4 Labor Cost Correction Factors ...........................................
1.110-13 A-5 Indirect Cost Factors ...................................................
1.110-14 A-6 Capital Recovery Factors ................................................
1.110-15 B-1 Indirect Costs ..........................................................
1.110-18 LIST OF FIGURES Figure Page A-1 Electric Power Supply Areas in the United States ........................
1.110-16 1.110-4
A. INTRODUCTION
Section I1.D of Appendix I, "Numerical Guides for Design Objectives and Limiting Conditions for Operation to Meet the Criterion
'As Low As Is Reasonably Achievable'
for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents," to 10 CFR Part 50, "Licensing of Produc tion and Utilization Facilities," requires that liquid and gaseous radwaste systems for light water-cooled nuclear power reactors include all items of reasonably demonstrated technology that, when added to the system sequentially and in order of diminishing cost-benefit return, can, for a favorable cost-benefit ratio, effect reductions in dose to the population reasonably expected to be within 50 miles of the reactor. Values of $1000 per man-rem and $1000 per man-thyroid-rem are given as interim criteria pending the development and establishment of better criteria.
Compliance with Section II.D of Appendix I to 10 CFR Part 50 (which specifically addresses doses to the population)
and Sections IL.A, 11.8, and II.C (which address doses to nearby individuals)
is required to meet the criterion, "as low as is reasonably achievable." To'implement the requirements of Appendix I, the NRC staff has developed a series of guides providing methods acceptable to the staff for the calculation of effluent releases, dispersion of effluents in the atmosphere and different water. bodies, associated radiation doses to man, and cost-benefit aspects of treating radwastes.
This regulatory guide describes a method for performing a cost-benefit analysis for liquid and gaseous radwaste system components.
The procedures and models provided in this guide will be subject to continuing review by the staff with the aim of providing greater flexibility to the applicant in meeting the require ments of Appendix I. As a result of such reviews, it is expected that alternative acceptable methods for calculation will be made available to applicants and that calculational procedures found to be unnecessary will be eliminated.
B. DISCUSSION
Each applicant for a permit to construct or a license to operate a light-water-cooled nuclear power reactor and each licensee with a license to operate a light-water-cooled nuclear power reactor is required to provide reasonable assurance that the design objectives for as low as is reasonably achievable effluent releases are satisfied by the liquid and gaseous radwaste system designs. It is the objective of this guide to provide an acceptable method of performing cost-benefit analysis, in conformance with Section II.D of Appendix I, to demonstrate that the plant design includes all items of reasonably demonstrated technology for reducing the cumula tive population dose due to releases of radioactive materials from the reactor to levels as low as reasonably achievable.
As an interim measure the Conmnission chose values of $1000 per man rem and $1000 per man-thyroid-rem (or lesser values if demonstrated to be suitable for a particu lar site) to be used to implement the cost-benefit analysis.
Because the Commission has not outlined any procedures for including the effects of inflation in the analysis, the NRC staff's analysis is based on 1975 dollars; i.e., neither the costs nor the interim criteria are escalated for the predicted effects of inflation.
Since the worth of a man-rem or man-thyroid-rem to the public is subject to the same fluctuations in value as the cost of equipment to reduce radioactive emissions, the NRC staff believes this approach to be reasonable.
The NRC staff has outlined a method for performing the required cost-benefit analysis and has provided cost parameters for estimating the costs for the various radwaste treatment equip ment items in use, or proposed for use, at light-water-cooled nuclear power reactors.
The methodology and cost parameters are presented in Appendix A to this guide. The costs presented.
consider the direct equipment cost and the costs of building space, supportive services, mainte nance, interest, and operating as well as other costs generally considered in analyzing capital and operating costs in power plant estimating.
The bases for the costs calculated by the NRC staff are given in Appendix B.1-110-5 C. REGULATORY
POSITION 1. In accordance with Section II.D, Appendix I to 10 CFR Part 50, each applicant for a permit to construct a light-water-cooled nuclear power reactor should demonstrate by means of a cost benefit analysis that further reductions to the cumulative dose to the population within a 50-mile radius of the reactor site cannot be effected at an annual cost of $1000 per man-rem or $1000 per man-thyroid-rem (or such lesser costs as demonstrated to be suitable for a particular case). 2. The cost-benefit analysis should consider the reduction in releases of radioactive material from all effluent pathways.
Liquid and gaseous radwaste system augments considered in the analysis should be selected in order of diminishing cost-benefit returns.
3. All costs should be given in terms of 1975 dollars (as is the $1000 per man-rem cost with which they are compared).
Allowances for Inflation after 1975 should not be factored into the cost estimates.
4. The method of calculation described in Appendix A and the parameters presented in Appendix B of this guide are acceptable to the NRC staff for performing the cost-benefit analysis.
5. In support of the cost-benefit analysis, the applicant should provide a complete evaluation including methodology used, components considered, and all assumptions and parameters used. Information to be submitted by the applicant Is described in Appendix C to this guide. Use of parameters, assumptions, and models different from those given in Appendices A and B to this guide may result in differences between the evaluations by applicants and those by the NRC staff. Because of this, these parameters and assumptions should be clearly described and substantiated by the applicant.
0. IMPLEMENTATION
The purpose of this section is to provide information to license applicants and licensees regarding the NRC staff's plan for using this regulatory guide. Except in those cases in which the applicant proposes an acceptable alternative method for complying with specified portions of the Commission's regulations, the method described herein will be used in the evaluation of construction permit applications docketed after June 4, 1976 unless this guide is revised as a result of suggestions from the public or additional staff review. If an applicant wishes to use this regulatory guide in developing submittals for applications docketed on or before June 4, 1976, the pertinent portions of the application will be evaluated on the basis of this guide.1.110-6 APPENDIX A PROCEDURES
FOR PERFORMING
COST-BENEFIT
ANALYSES This appendix contains guidance for performing cost-benefit analyses on individual system augments, as well as the parameters needed for estimating costs. The bases for the parameters and worksheets appropriate for use with the following cost-benefit procedure are given in Appendix B. 1. The cumulative population man-rem exposure and man-thyroid-rem exposure should be determined for each effluent release source, e.g., liquid radwaste releases, ventilation releases, etc. 2. Potential reductions to the cumulative population exposure should be determined based on the addition of items of reasonably demonstrated technology which have the potential to reduce releases of radioactive materials.
3. Acceptable methods for performing some of the calculations need for items 1 and 2 above are contained in Regulatory Guides 1.109, "Calculation of Annual Doses to.Man from Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance with 10 CFR Part 50, Appendix I," and 1.111, "Methods for Estimating Atmospheric Transport and Dispersion for Gaseous Effluents in Routine Releases from Light-Water-Cooled Reactors," and in two regulatory guides now in prepara tion on the subjects of (1) calculation of releases of radioactive materials In liquid and gas eous effluents from light-water-cooled reactors and (2) methods for estimating aquatic dispersion of liquid effluents from routine reactor releases for the purpose of implementing Appendix I. 4. The total annual cost of each augment considered in item 2 above should be determined as follows: a. The Total Direct Cost (TOC): (1) Obtain the direct cost of equipment and materials from Table A-1. (2) Multiply the direct labor cost obtained from Table A-1 by the appropriate labor cost correction factor from Table A-4 to obtain the corrected labor cost for the geographtcal area from Figure A-l, in which the plant is to be built. (3) Add the costs obtained from steps (1) and (2) to obtain the Total Direct Cost. b. Obtain-the appropriate Indirect Cost Factor (ICF) from Table A-S. c. Determine Total Capital Cost (TCC) by using the equation:
TCC -TDC x ICF d. Obtain the appropriate Capital Recovery Factor (CRF) from Table A-6. e. Determine the Annual Fixed Cost (AFC) by using the equation:
AFC = TCC x CRF f. Obtain the Annual Operating Cost (AOC) and the Annual Maintenance Cost (AMC) from Tables A-2 and A-3. Multi-unit sites using shared radwaste systems should multiply the AOC by the number of reactors sharing the augment.
g. Determine the Total Annual Cost (TAC) by using the equation:
- AFC + AOC + AMC 5. Determine the "benefit" of each augment by multiplying the dose reduction calculated in item 2 above by $1000 per man-rem and/or $1000 per man-thyroid-rem, as appropriate.
6. The system should be augmented with any items for which the TAC from item 4.g above is less than the value calculated in item 5, in the order of diminishing cost-benefit.
1.110-7 TABLE A-1 DIRECT COSTS -GASEOUS RADWASTE AUGMENTS Direct- Costs (1975 $1000) Equipment/Material Labor Total BWR Offgas Recombiner
553 255 808 3-ton Charcoal Adsorber 53 14 67 Desiccant Dryer 218 176 394 Charcoal Vault Refrigeration
116 38 154 Main Condenser Vacuum Pump Charcoal/HEPA
Filtration System 40 8 48 Clean Steam to Turbine Glands 81 215 296 Clean Steam to Steam Valves. 24" and Larger 137 110 247 Clean Steam to Steam Valves, 2-1/2" and Less Than-24" 183 55 238 15,000-cfm HEPA Filtration System 52(49)* 16(14)* 68(63)* 1,000-cfm Charcoal/HEPA
Filtration System 28 10 38 15,000-cfm Charcoal/HEPA
Filtration System 97(93) 31(26) 128(119) 30,000-cfm Charcoal/HEPA
Filtration System 157(152) 51(41) 208(193) Turbine Bldg. Chilled Water HVAC System 614 374 988 600-ft 3 Gas Decay Tank 33 24 57 PWR Hydrogen Recombiner
419 147 566 PWR Air Ejector Charcoal/HEPA
Filtration Unit 14 10 24 Steam Generator Flash Tank Vent to Main Condenser
19 14 33 In cases where the equipment may be located either in the auxiliary building or the turbine building and common usage does not indicate a definite preference of one location or the other, cost for both locations are listed with the turbine building location cost in parenthesis.
1.110-8 TABLE A-1 (Continued)
DIRECT COSTS -LIQUID RADWASTE AUGMENTS Direct Costs 15-gpm Evaporator
30-gpm Evaporator
50-gpm Evaporator Evaporator Distillate Demineralizer
50-gpm Demineralizer
100-gpm Demineralizer
200-gpm Deminieralizer
400-gpm Demineralizer
100-gpm Precoat Filter 400-gpw Precoat Filter 20-gpm Cartridge Filter 2-gpm Reverse Osmosis 10,000-gal Tank Equipment/Material
386 540 655 36 43 64 94 102 108 202 13 100 55 1.110-9 Labor 201 223 233 24 29 31 35 44 56 112 11 38 43 (1975 $1000) Total 587 763 888 60 50 95 129 146 164 314 24 138 98 TABLE A-2 T ANNUAL OPERATING
COSTS -GASEOUS RADWASTE AUGMENTS BWR Offgas Recoatbiner
3-ton Charcoal Adsorber Desiccant Dryer Charcoal Vault Refrigeration Main Condenser Vacuum Pump Charcoal/HEPA
Filtration System Clean Steam to Turbine Glands Clean Steam to Steam Valves, 24" and Larger Clean Steam to Steam Valves, 2-1/2" and Less Than 24" 15,000-cfm HEPA Filtration System 1,000-cfm Charcoal/HEPA
Filtration System 15,000-cfm Charcoal/HEPA
Filtration System 30,000-cfm Charcoal/HEPA
Filtration System Turbine Bldg. Chilled Water HVAC System 600-ft 3 Gas Decay Tank PWR Hydrogen Recombiner PWR Air Ejector Charcoal/HEPA
Filtration Unit Steam Generator Flash Tank Vent to Main Condenser Total Operating Cost 3 (1975 $lOOO/yr)neg 3 4 0.4 24 3 3 6 2 7 9 49 neg 4 4 1 ANNUAL OPERATING
COSTS -LIQUID RADWASTE AUGMENTS Evaporation
-PWR Dirty Waste Evaporation
-BWR Dirty Waste Evaporation
-Condensate Polisher Chemical Waste Evaporation
-Detergent Waste Demineralization
-kvaporator Distillate Demineralization
-BWR 2nd Waste Demineralizer in Series 50 169 114 20 5 15 Operating costs are given for a single reactor. Operating costs for augments in shared radwaste systems should be multiplied by the number of reactors serviced by the augment.1.110-10 K B r m m TABLE A-2 (Continued)
ANNUAL OPERATING
COSTS -LIQUID RADWASTE AUGMENTS Total Operating Cost (1975 $1000/yr)5 Demineralization
-PWR Clean Waste Demineralization
-BWR Dirty Waste Demineralization
-PWR Dirty Waste Demineralization
-PWR Turbine Bldg. Drains Desmineralization
-PWR Steam Generator Blowdown Precoat Filter -BWR Dirty Waste Cartridge Filter Reverse Osmosis -Detergent Waste 10,000-gal Tank 88 18 95 25 53 7 7 1 1.110-11 TABLE A-3 ANNUAL MAINTENANCE
COSTS- GASEOUS RADWASTE AUGMENTS Total Maintenance Cost (1975 $1O00/Yr)
BWR Offgas Recombiner
20 3-ton Charcoal Adsorber neg Desiccant Dryer 6 Charcoal Vault Refrigeration
3 Main Condenser Vacuum Pump Charcoal/HEPA
Filtration System 1 Clean Steam to Turbine Glands 4 Clean Steam to Steam Valves, 24" and Larger 4 Clean Steam to Steam Valves, 2-1/2" and Less Than 24" 12 15,000-cfm HEPA Filtration System 2 1,000-cfm Charcoal/HEPA
Filtration System 0.6 15,O00-cfm Charcoal/HEPA
Filtration System 9 30,000-cfm Charcoal/HEPA
Filtration System 18 Turbine Bldg. Chilled Water HVAC System 20 600-ft 3 Gas Decay Tank neg PWR Hydrogen "Recombiner
10 PWR Air Ejector Charcoal/HEPA
Filtration Unit 2 Steam Generator Flash Tank Vent to Main Condenser
1 ANNUAL MAINTENANCE
COSTS -LIQUID RADWASTE AUGMENTS 15-gpm Evaporator
30 30-gpm Evaporator
30 50-gpm Evaporator
30 Evaporator Distillate Demineralizer
2 50-gpm Demineral izer 5 lO0-gpmi Demineralizer
5 200-gpm Demineral izer S 100-gpm Precoat Filter 10 400-gpm Precoat Filter 10 20-gpm Cartridge Filter 1 2-gpm Reverse Osmosis g 10.000-gal Tank 2 1.110-12 TABLE A-4 LABOR COST CORRECTION
FACTORS Labor Cost Correction Factor 1.6 1.5 1.0 1.4 1.1 1.2 1.3 1.2 See Appendix B, "Labor See Figure A-1.Cost Correction Factors.'1.110-13 FPC Geographic Region I 1II IV V VI VII Vlll TABLE A-5 INDIRECT COST FACTORS Type Radwaste System "1. Single unit site, unitized radwaste system 2. Multi-unit site, shared radwaste system 3. Multi-unit site, unitized radwaste system Indirect Cost Factor 1.75 1.75 1.75 + (n-1)1.5 n where n is the number of unitized radwaste systems at the site Each reactor has a separate, nonshared radwaste system.I..1.110-14 TABLE A-6 CAPITAL RECOVERY FACTORS Cost of Honey (1 per year, i)5 6 7 8 9 10 11 12 13 14 15 Capital Recovery Factor 0.0651 0.0726 0.0806 0.0888 0.0973 0.1061 0.1150 0.1241 0.1334 0.1428 0.1523 service life of 30 years and the follwing equation:
CRF M + 1)3 (I + i)30-1 1.110-15*Based on a LEGEND ¶Im REGIONAL GROUPING OF POWER SUPPLY AREAS FIGURE A-1 ELECTRIC POWER SUPPLY AREAS IN THE UNITED STATES (C C
APPENDIX B BASES FOR PARAMETERS
USED IN PERFORMING
COST-BENEFIT
ANALYSIS This appendix contains detailed cost estimate sheets showing the methods and parameters used to obtain all costs associated with augments considered for the liquid and gaseous radwaste systems. The cost estimate sheets are grouped by radwaste system types. The first sheet in each case is an equipment cost worksheet for determining direct equipment costs. The second sheet is an operating cost worksheet.
All costs are stated in terms of 1975 dollars. No attempt has been made to project the effect of inflation.
Variations of labor costs and productivity with site locaticns are considered.*
All costs are based on the assumption that the reactor is in the design stage and that augmentation of a radwaste system will not involve backfltting of an existing plant. Backfltttng costs should be determined on a case-by-case basis. 1. Capital Costs Capital costs are reported by grouping items by system and by plant location, which gen erally follow the NRC (AEC) accounting system given in NUS-531 (Ref. 1). The direct costs considered to be applicable to radwaste systems are structures, electrical services, equipment, and instrumentation and controls.
Spare parts and a contingency allowance**
are included in the direct costs. Total capital costs are obtained by multiplying direct costs by an indirect cost factor. 2. Direct Cost Direct costs for each augment include equipment, site labor, and site materials.
Principal equipment designs and hardware costs were obtained from utility companies, architect-engineers, and vendors. Costs for building space, electrical services, piping, and instrumentation were estimated considering equipment functions and arrangements.
Costs for electric services, piping, and instrumentation and controls were determined using judgment to estimate equipment layout, points of interface, and services required.
The costs for equipment and building space are consistent with'NRC staff recommendations for radwaste sys tem quality assurance, materials, and seismic design. Space requirements were determined based on manufacturer's data or data from existing or proposed layout drawings.
3. Labor Cost Correction Factors Labor cost adjustment factors were developed for each Of the eight FPC electric power supply areas shown in Figure A-I of Appendix A by calculiting the average labor cost-for selected cities (Ref. 2) in each area and adjusting this cost for estimated variations in labor productivity due only to differences In labor practices in the regions considered.
Manpower costs were calcu lated by multiplying the estimated labor requirements in man-hours by the composite wage rate (Ref. 3). The calculated labor cost correction factors are tabulated in Table A-4 of Appendix A. 4. Indirect Cost Factor Indirect costs asa percentage of direct costs are calculated in Table B-1. Location effects of the eight FPC Power Supply areas are estimated and shown in Table A-4 of Appendix A. Contingency onsite labor and process equipment and material are all based on-l0%.1.110-17 TABLE 8-1 K..INDIRECT COSTS 1st Unit, Subsequent Percentage of Units. Percentage Direct Cost of Direct Cost Construction facilities, equiment, and services 10 5 Engineering and construction managment services 20 10 Other owner s costs 10 S Interest during construction
3S 35 Total 75 SS *Based on a lOs/yr interest rate and a 4-year construction time for radaste systems only. Interest during construction Is estimated to be 25% of direct costs plus other indirect costs. This is equivalent to 351 of the direct costs. The Indirect escalators (factors)
were estimated from preliminary architect/engineering data to be used to update the DOM concept and ORCOST computer codes. S. Operation And Maintenance Costs Annual expenses for operation and maintenance (O&N) of the radwaste treatment systes were estimated for baseload power plants operating at 801 capacity factor. Manpower and supply costs were estimated by considering equipment functions it each case. Expenses for gases, steam, resins, auxiliary por. and other supplies and services were assessed individually.
Maintenance costs were evaluated according to the type of service for which the equipment could be used. Operating costs include estimated manpower costs, costs of utilities and supplies, and effects on supporting plant systems Interfacing with the augmented radmste system (e.g., effect of an evaporator augment on the solid waste syste). Also included are costs of handling wastes such as spent resins, demineralizer regenerants, evaporator bottoms, and filter media, as well as offsite handling, transportation, and burial costs. 6. Capital Recovery Factor The capital recovery factor Is a levelized annual charge which takes into account the cost of borroved money and the depreciation of assets. It Is calculated from the expression:
I(1 #)o (I + ~where i a cost of borrowed money expressed as a decimal P -plant operating lifetime (yr) In calculating the values used in Table A-S of Appendix A. a plant operating lifetime of 30 years was used. The capital recovery factor multiplied by the total capital cost will give the annual dollar charges for capital and capital-related expenses.1.110-18 LIST OF APPENDIX B COST ESTIMATE SHEETS Page Numiber BW Offgas Recmbiner
.............................................................
1.110-20 3-ton Charcoal Adso r ...............................................................
1.110-22 Desiccant Dryer ..............................................................
1.110-24 Charcoal Vault Refrigeration
.........................................................
1.110-26 Charcoal/HEPA
Filtration System -Condenser Vacuun Pump ..............................
1.110-28 Clean Steam to Turbine Glands ........................................................
1.110-30 Clean Steam to Steam Valves 24- and Larger ...........................................
1.110-32 Clean Steam to Steam Valves 2-1/2' and Less Than 24" ................................
1.110-34 1S.000-cftm NEPA Filtration System ....................................................
1.110-36 1000-cfa Charcoal/HEPA
Filtration System .............................................
1.110-39 15.000-cfm Charcoal/HEPA
Filtration System ...........................................
1.110-41 30,000-cfm Charcoal/HEPA
Filtration System ..........................................
1.110-44 Turbine Building Chilled Mater HVAC System ...........................................
1.110-47 600-ft 3 Gas Decay Tank ...............................................................
1.110-49 PIW Hydrogen Recombiner
..............................................................
1.110-S1 PiW Air Ejector Charcoal/HEPA
Filtration Unit ........................................
1.110-53 Stem Generator Flash Tank Vent to rain Condenser
....................................
1.110-55 Evaporators
..........................................................................
1.110-57 Evaporator Distillate Demineralizer
..................................................
1.110-64 Demineralizers
.......................................................................
1.110-66 Cartridge Filter .....................................................................
1.110-76 Precoat Filters ......................................................................
.114 7R Reverse Osmosis .....................................................................
1.110-81 10.000-gal Tank ...........................................................
1.11" 1.110-19 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment ITEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.RUD D r.mh4n.... 11 I___MIXL_
1 IVIML COST ESTIMATE DIRECT COST.(1975
$1000) r1 T DMUT'/MATrD
TAt BASIS FOR 90 260 350 single unit, catalytic type w/heater and condenser, w/o instrumentation and controls, stainless steel, ASME VIII BUILDING ASSIGNMENT
100 50 ISO 30' x 40' x 25' @ $5/ft 3 (turbine building shielded area) ASSOCIATED
PIPING SYSTEMS 18 12 30 augment piping connections only INSTRUM4ENTATION
AND CONTROLS 24 96 120 allowance ELECTRICAL
SERVICE neq 4kw heaters on vessels neglected SPARE PARTS 85 85 75K for catalyst + 2% E/M in items 1 & 4 above SUBTOTAL 232 503 735 CONTINGENCY
23 50 73 10% TOTAL DIRECT COSTS 2S5 553 808 r a O (S...... ..................
w BWR Off %e Darr-M---
Ick- a, I a W i IARND TflYAi K A ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR-LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment BWR Offgas Recombiner (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, 3.3 15 m.n/shift AND OVERHEAD MAINTENANCE
MATERIAL AND. 20.0 routine conditioning of catalyst and LABOR equipment upkeep; 5% of E/M including I&C CONSUMBLES, CHEMICALS, AND -initem 2 SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water Steam neg intemittent;
4kw heater load is negligible Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 23.3 1. 2.C2 ,01 3. 4. 5.I
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment !TFM 1. PROCESS EQUIPENT
2. BUILDING ASSIGNMENT
3. 4. S. 6. 7. 8.3-ton Charcoal Adsorber (Sheet 1)LABOR 5 DIRECT COST (1975 $1000) EOUIPMENTIMATERIALS
TOTAL-------44.0 49.0 BASIS FOR COST ESTIMATF carbon steel, 350 psig, 200 ft 3 volume (augment to existing train of beds)4. 4. 4. 4 8 4.5 12.5 10' x 10' x 25' * $5/ft 3 (turbine building shiel4ed area)ASSOCIATED
PIPING SYSTES -in item I INSTRUKENTATION
AND CONTROLS neg ELECTRICAL
SERVICE neg SPARE PARTS none existing SUBTOTAL 13 48.5 61.5 CONTINGENCY
1 5.0 6.0 10% TOTAL DIRECT COSTS 14 53.5 67.5 r r a S.. .... ....r m K ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 3-ton Charcoal Adsorber (Sheet 2) COST (1975 $1000)I TFM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR. SUPERVISION.
neg AND OVERHEAD MAINTENANCE
MATERIAL AND allowance of 3% of equipment cost LABOR neg is negligible CONSUMABLES.
CHEMICALS, AND SUPPLIES neg lifetime use of charcoal assumed UTILITIES
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND M ANNUAL COST neg K 1. 2. 3. 4.I..5.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Desiccant Drver fSheet !1 I TEN I ARflR DIRECT COST (1975 $1000)IL 1% COTETMT BASIS FOR 1. PROCESS EQUIPMENT 25 75 100 redundant dryer vessels with 1 regeneration skid BUILDING ASSIGNMENT
95 50 145 40' x 36' x 20' @ $5/ft 3 turbine building (shielded area) ASSOCIATED
PIPING SYSTEMS 10 5 15 augment piping connections only INSTRUMENTATION
AND CONTROLS 12 48 60 allowance ELECTRICAL
SERVICE 18 17 35 service for heaters, blowers, pumps, and compressors SPARE PARTS 3 3 SUBTOTAL 160 198 358 CONTINGENCY
16 20 36 10% TOTAL DIRECT COSTS 176 218 394 r 2.8i 3. 4. 5.6. 7. 8.(r Desiccant Drver (Sheet I)
K ANNUAL CPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Desiccant Dryer (Sheet 2) COST (1975 $1000)I Ahfl flTIIP TflTAI BASIS FOR COST ESTIMATE ITEM itri,,, ........ .... OPERATING
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE
MATERIAL AND 6.1 5% of equipment including I&C LABOR CONSUMABLES, CHEMICALS, AND neg SUPPLIES UTILITIES
AND SERVICES Waste Disposal neg operating time does not require Water neg significant utilities and services Steam Electricity neg Building Services Other TOTAL 0 AND M ANNUAL COST 9.4 K K 1. 2. 3 4.C U'S.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREAThENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment ITEM Charcoal Vault Refrigeration (Sheet 1)10AM DIRECT COST (1975 $1000)LAORFlIITDUdCNT/UATCDTA1 C YffAS IfC et.V BASIS FOR 1. PROCESS EQUIPMENT
2. BUILDING ASSIGNMENT
3. 4. 5. 6. 7. 8.10 75 85 10-ton capacity, 3 refrigerators with drives, 32°F design I t 4-4 9 3 12 20' x 10' x 201 0 $2/ft 3 turbine building (nonshielded area)ASSOCIATED
PIPING SYSTEMS In item 1 INSTRUMENTATION
AND CONTROLS 4 6 10 allowance ELECTRICAL
SERVICE 12 18 30 allowance SPARE PARTS 3 3 SUBTOTAL 35 105 140 CONTINGENCY
3 11 14 10% TOTAL DIRECT COSTS 38 116 154 0 N 14 Ch (TftTAI
K ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COO.EO
NUCLEAR REACTORS Description of Augment Charcoal Vault Refriceration (Sheet 2)'TIn'COST (1975 $1000) rTeR TOTAL FOR COST OPERATING
LABOR, SUPERVISION.
3.3 15 min/shift AND OVERHEAD MAINTENANCE
MATERIAL AND LABOR 3.7 51 of equlpemt CONSUMABLES, CHEMICALS, AND in Item 2 SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water Steam 0.5 electricity and cooling water Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 7.5 K K 1. 2. 3. 4. S.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Charcoal/HEPA
Filtration System -Condenser Vacuum Pump (Sheet 1)ITE4 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.LABOR__ ~ LrILumLAL
IUIAL COST ESTIMATE D IRECT COST (1975 $1000)2 32.5 34.5 2000 CFM preftlter/4" charcoal bed/HEPA @ S15/cfm, 10 kw heater @ $250/kw BUILDING ASSIGNMENT
3.1 1.5 4.6 Turbine building 8' x 16, x 12' @ $3/ft 3 (nonshielded area) ASSOCIATED
PIPING' SYSTEMS 1.3 0,7 2.0 allowance INSTRUMENTATION
AND CONTROLS in item 1 ELECTRICAL
SERVICE 1 1.5 2.5 SPARE PARTS 0.5 0.5 SUBTOTAL 7.4 36.7 44.1 CONTINGENCY
.7 3.7 4.4 10% TOTAL DIRECT COSTS 8.1 40.4 48.5 (Nm wO (i n *BASIS FOR I
K K ANNUAL OPERATING
ANr MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Charcoal/HEPA
Filtration System -Condenser Vacuum Pump (Sheet 2) COST (1975 $1000) 'ueD TfllhI RAmie FflQ tOI[IT F¢;TTMATF OPERATING
LABOR, SUPERVISION, neg used only during startup and shutdown AND OVERHEAD MAINTENANCE
MATERIAL AND 1.2 4 HEPA filters @ $150 & 2 Charcoal filters LABOR @ $900, change every 2 years CONSUMABLES, CHEMICALS, AND in items 2 and 4 SUPPLIES UTILITIES
AND SERVICES Waste Disposal 0.2 S50/HEPA filter, $100/Charcoal filter Water Steam Electricity Building Services Other 1.4 5. TOTAL 0 AND M ANNUAL COST_______________________
I _________
________ _______________________________
K I.2. 3. 4.'.4 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment STT F M 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.Clean Steam to Turbine Glands (Sheot 1)I ARAR DIRECT COST (1975 $1000) FOIITDMFNTIMATPRTAI
ITEMP 15 150 TflTAI 165 BASIS FOR VCTttMATO 25,000 lb/hr reboiler I $4/lb/hr I $25K/H.P.
turbine glands BUILDING ASSIGNMENT
19 10 29 20' x 30' x 16' 6 $3/ft 3 ASSOCIATED
PIPING SYSTEMS 32 18 50 equiv 1000 ft 0 $50/ft INSTRUMENTATION
AND CONTROLS 8 12 20 in addition to Item I ELECTRICAL
SERVICE nag SPARE PARTS 5 5 SUBTOTAL 74 195 269 CONTINGENCY
7 20 27 10% TOTAL DIRECT COSTS 81 215 296 r C r K K SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Clean Steam to Turbine Glands (Sheet 2) COST (1975 $1000)1TR4 LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE
MATERIAL AND 4.0 40 man-days LABOR CONSUMABLES, CHEMICALS, AND SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water Steam 21.0 10 Btu/kw-hr heat rate increase Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 28.3 ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT 9'I. 2. 3. 4. 5.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Clean Steam to Steam Valves 2 4" and Larger (Sheet 1)ITEM I AMII DIRECT COST (1975 $1000) n:*.:TDAACLIMATDTai PROCESS EQUIPMENT
100 120 220 22 valves @ $1OK/valve, use existing reboiler BUILDING ASSIGNMENT
neg install in existing space ASSOCIATED
PIPING SYSTEMS -in item 1 INSTRUMENTATION
AND CONTROLS -in Item 1 ELECTRICAL
SERVICE neg SPARE PARTS 5 SUBTOTAL 100 125 225 CONTINGENCY
10 12 22 10% TOTAL DIRECT COSTS 110 137 247 BASIS FOR 0 i%1J I. 2. 3. 4. S. 6. 7. 8.(r TnTAI
-\ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM1 FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Clean Steam to Steam Valves 24" and Larger (Sheet 2) COST (1975 $1000)TT!M LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE
MATERIAL AND 4.0 40 man-days LABOR CONSUMABLES, CHEMICALS, AND neg SUPPLIES UTILITIES
hND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 7.3 K 1. 2. 3. 4.w U,
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment ITEM 1. PROCESS EQUIPMENT 2. 6. 3. 7.e . w .h 4. 5. 6. 7. 8.Clean Steam to Steam Valves 2-1/2N and Less Than 24" (Sheet 1)LAB 0 DIRECT COST (1975 $1000) OR EQUIPMENT/MATERIALS
120 TOTAl_120 BASIS FOR 100 valves 0 $1200 each BUILDING ASSIGNMENT
--neg ASSOCIATED
PIPING SYSTEMS 40 20 60 INSTRUMENTATION
AND CONTROLS 10 20 30 allowance ELECTRICAL
SERVICE -none SPARE PARTS -6 6 SUBTOTAL 50 166 216 CONTINGENCY
5 17 22 10% TOTAL DIRECT COSTS 55 183 238 I (TOTAL COS ESTIMATE
K SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Clean Steam to Steam Valves 2-1/2" and Less Than 24" (Sheet 2)COST (1975 $1000)ITEM LABOR OTN!R OPERATING
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE
MATERIAL AND 12.0 1% of direct cost of equipment LABOR CONSUMABLES, CHEMICALS, AND -in item 2 SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND H ANNUAL COST 15.3 A ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT K-a a U'1. 2. 3. 4. S.TNTAI
Description of Augment TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS 15,000-cfm HEPA Filtration System -Auxiliary Building (Sheet 1)BASIS FOR rACT rCTTMATr II Anna flTl .r.. --.n .- L , I r. I~p~ ERq~ X rr...L./ n n. v, .., .1. PROCESS EQUIPMENT 40.0 45.0 prefilter/HEPA
@ $3/cfm, use existing fan BUILDING ASSIGNMENT
7 4.5 11.5 16' x 12' x 12' @ $5/ft 3 (nonshielded area) ASSOCIATED
PIPING SYSTEMS 3 2.0 5.0 INSTRUMENTATION
AND CONTROLS in item 1 ELECTRICAL
SERVICE base SPARE PARTS 0.5 0.5 SUBTOTAL 15 47.0 62.0 CONTINGENCY
1 5.0 6.0 10% TOTAL DIRECT COSTS 16 52.0 68.0 ((I ADflD DIRECT COST (1975 $1000) £rI"TDUCMT
MATrTAI C 5 TfllAI ,o L. a'2. 3. 4. 5. 6. 7. 8.(
K FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 15,000-cfm HEPA Filtration System -Turbine Building (Sheet 2)I AflI DIRECT COST (1975 $1000) lI TDMCWNT IMATrOAIC TflTAL BASIS FOR COST ESTIMATE ITEM !L___ f ______________
PROCESS EQUIPMENT
5 40.0 45.0 skid mounted filter housing w/o fans BUILDING ASSIGNMENT
4.6 2.3 6.9 16' x 12' x 12' @ $3/ft 3 (nonshielded area) ASSOCIATED
PIPING SYSTEMS 3 2.0 5.0 INSTRUMENTATION
AND CONTROLS in item 1 ELECTRICAL
SERVICE base SPARE PARTS 0 0.5 0.5 SUBTOTAL 12.6 44.8 57.4 CONTINGENCY
2 4.0 6.0 10l TOTAL DIRECT COSTS 14.6 48.8 63.4 T TOTAL DIRECT COST ESTIMATE SHEET OF RADWASrE TREATMENT
SYSTEM K-I 1. 2. 3. 4. 5. 6. 7. a.!
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 15,000-cfm HEPA Filtration ITEM LABOR System (Sheet 3) COST (1975 $1000)OTI4FR TflTAI OPERATING
LABOR, SUPERVISION, 3.8 15 min/shift
+ 40 hr annual test AND OVERHEAD MAINTENANCE
MATERIAL AND 2.2 change every 2 yrs @ $150/filter element LABOR CONSUMABLES, CHEMICALS, AND in items 2 and 4 SUPPLIES UTILITIES
AND SERVICES Waste Disposal 0.8 $50/filter element Water Steam Electricity
1.0 additional fan electrical load Building Services Other TOTAL 0 AND M ANNUAL COST 7.8 (I. 2. 3.I RACTC Frn rncT FCTIMATC 4. 5.I_
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 1000-cfm Charcoal/HEPA
Filtration System (Sheet 1)I TEM LABOR DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS
TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT
2.0 22.0 24.0 prefllter/4" charcoal/HEPA
@ $20/cfm, 5 kw htr @ $400/kw BUILDING ASSIGNMENT
3.8 2.0 5.8 8' x 12' x 12' @ $5/ft 3 (nonshielded area) ASSOCIATED
PIPING SYSTEMS 1.3 .7 2.0 INSTRUMENTATION
AND CONTROLS in item 1 ELECTRICAL
SERVICE 1.5 1.0 2.5 SPARE PARTS 0.5 0.5 SUBTOTAL 8.6 26.2 34.8 CONTINGENCY
1.0 2.0 3.0 10% TOTAL DIRECT COSTS 9.6 28.2 37.8 K 0 I. 2. 3. 4. 5. 6. 7. 8.
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 1000-cfm Charcoal/HEPA
Filtration System (Sheet 2) COST (1975 $1000) ITEM LABOR OTHER TOTAL BASIS FOR COST £STII4ATF OPERATING
LABOR, SUPERVISION, 1.9 20 min/day + 40 hr annual test AND OVERHEAD MAINTENANCE
14ATERIAL
AND .6 2 HEPA or prefilters
@ $150 each and 1 charcoal @ $900 each every 2 yrs' CONSUMABLES, CHEMICALS, AND in items 2 and 4 SUPPLIES UTILITIES
AND SERVICES Waste Disposal .1 $50/HEPA or prefilter, $100/charcoal Water filter Steam Electricity neg Building Services Other 5. TOTAL 0 AND M ANNUAL COST 2.6____________________________
____________
I I ( __ (1. 2. -3. 0--
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 15,OOO-cfm Charcoal/HEPA
Filtration System -Auxiliary Building (Sheet 1)TTVM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.LABOR 10 DIRECT COST (1975 $1000) EQUIPMENT/MATERIALS
71 TOTAL 81 BASIS FOR COST ESTIMATE prefilter/4" charcoal/HEPA
@ $5/cfm, 30kw htr @ $200/kw BUILDING ASSIGNMENT
12 8 20 16' x 20' x 12' @ $5/ft 3 (nonshielded area) ASSOCIATED
PIPING SYSTEMS 3 2 5 INSTRUMENTATION
AND CONTROLS -In Item 1 ELECTRICAL
SERVICE 3 2 5 allowance SPARE PARTS 5 5 4 elements of each type SUBTOTAL 28 88 116 CONTINGENCY
3 9 12 10% TOTAL DIRECT COSTS 31 97 128 K a COST ESTIMATE ITE LABO.....
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment I TEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.15,000-cfm Charcoal/HEPA
Filtration System -Turbine Building (Sheet 2)I fuND DIRECT COST (1975 $1000) CN "I lDMrLT ATEDIlA1 C ITEM x flMrnR 1.3 UTflYAI I_____ ARAL?~urIIn~LJIUL
UIt.IW BASIS FOR 10.0 71.0 81.0 prefilter/4*
charcoal/HEPA
@ $5/cfm, 30 kw htr @ $200/kw BUILDING ASSIGNMENT
7.7 3.8 11.5 16' x 20' x 121 @ $3/ft 3 (nonshielded area) ASSOCIATED
PIPING SYSTEMS 3.0 2.0 5.0 INSTRUMENTATION
AND CONTROLS in item 1 ELECTRICAL
SERVICE 3.0 2.0 5.0 allowance SPARE PARTS 5.0 5.0 4 elements each type SUBTOTAL 23.7 83.8 107.5 CONTINGENCY
2.0 9.0 11.0 10% TOTAL DIRECT COSTS 25.7 92.8 118.5 r (0 .rg (
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREAThENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 15,O00-cfm Charcoal/HEPA
Filtration System (Sheet 3)COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR. SUPERVISION, 3.8 15 min/shift
& 40-hr annual test AND OVERHEAD MAINTENANCE
MATERIAL AND 9.0 30 HEPA or prefilters
@ $150 each & 15 LABOR charcoal filters @ $900 each every 2 yrs CONSUMABLES, CHEMICALS, AND in Items 2 and 4 SUPPLIES UTILITIES
AND SERVICES Waste Disposal 1.5 $S50/HEPA
or prefilter, $100/charcoal Water Steam Electricity
1.3 8kw additional fan power for filter aP Building Services 0.018.S/kw-hr Other TOTAL 0 AND M ANNUAL COST 15.6 K K 1. 2. 3. 4.0 5.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS 30.00O-cfm Charcoal/HEPA
Filtration System -Auxiliary Building (Sheet 1)i ARng~DIRECT COST (1975 $1000) FoII PI4FNTII4ATFRIALS
-¶ a 1n FnrMN/AEIL
1. PROCESS EQUIPMENT 15 117.0 TOTAL 132.0 BASIS FOR COST ESTIMATE pref1lter/4" charcoal/HEPA
@ $4/cfm, 60-kw htr @ $200/kw BUILDING ASSIGIMENT
20 13.6 33.6 28' x 20' x 12' $S5/ft 3 (nonshielded area) ASOCIATED
PIPING SYSTEMS 5 3.0 8.0 base INSTRUMENTATION
AND CONTROLS -in item I ELECTRICAL
SERVICE 6 4.0 10.0 allowance SPARE PARTS 5.0 5.0 4 elements each type SUBTOTAL 46 142.6 188.6 CONTINGENCY
5 14.0 19.0 10% TOTAL DIRECT COSTS 51 156.6 207.6 C Description of Augment I ITU a 2. 3. 4. 5. 6. 7. 8.(
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 30,000-cfm Charcoal/HEPA
Filtration System -Turbine Building (Sheet 2)ITEM LAROR DIRECT COST (1975 $1000) !OtITPHt¶!rT/ATrR
TALS TflTA[BASIS FOR PROCESS EQUIPMENT
15.0 117.0 132.0 prefilter/4" charcoal/HEPA
@ $4/cfm, 60kw htr @ $200/kw BUILDING ASSIGNMENT
13.4 6.8 20.2 28' x 20' x 12' @ $3/ft 3 (nonshielded area) ASSOCIATED
PIPING SYSTEMS 3.0 5.0 8.0 base INSTRUMENTATION
AND CONTROLS in item 1 ELECTRICAL
SERVICE 6.0 4.0 10.0 allowance SPARE PARTS 5.0 5.0 4 elements each type SUBTOTAL 37.4 137.8 175.2 CONTINGENCY
4.0 14.0 18.0 l0 TOTAL DIRECT COSTS 41.4 151.8 193.2 y me 1. 2. 3. 4. 5. 6. 7. 8.
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 30.00O-cfm Charcoal/HEPA
Filtration System -(Sheet 3)COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR £OST FSTTMATF OPERATING
LABOR, SUPERVISION, 3.8 15 min/shift
+ 40 hr annual test AND OVERHEAD MAINTENANCE
MATERIAL AND 18.0 60 HEPA or prefilters
@ $150 each & 30 LABOR charcoal filters @ $900 each every 2 yrs CONSUMABLES, CHEMICALS, AND -in items 2 and 4 SUPPLIES UTILITIES
AND SERVICES Waste Disposal 3.0 $50/HEPA or preftilter, $1007charcoal filter Water Steam Electricity
2.6 16kw additional fan HP for filter @ Building Services 0.018 S/ku-hr Other TOTAL 0 AND M ANNUAL COST 27.4__ C 2. " 3. 4. 5.-: -ý:r t- -.-J"
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment ITEM 1. PROCESS EQUIPMENT 2. BUILDING 3. 4. 5. 6. 7. 8.Turbine Building Chilled Water HVAC System (Sheet 1) LABOR 300 DIRECT COST (1975 $1000) EOUJIPMFNTIMATFRIALS
TnIMNIAEIL
1 nA 500 TflTAI 800 BASIS FOR rnCT CTMATC 500-ton capacity, w/o air filters-t + I Coolers can be Installed in existing space saved by deletion of ductin
g. ASSOCIATED
PIPING SYSTEM; -in item 1 INSTRUMENTATION
AND CONTROLS -in item 1 ELECTRICAL
SERVICE 40 so 90 SPARE PARTS -8 8 1% item 1 SUBTOTAL 340 558 898 CONTINGENCY
34 56 90 10l TOTAL DIRECT COSTS 374 614 988 K 11 0 -J
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTE14 FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Turbine Building Chilled Water HVAC System (Sheet 2)COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE
MATERIAL AND 20.0 2-1/2% of equipment costs LABOR CONSUMABLES, CHEMICALS, AND -initem 2 SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water 13.0 500 gpm @ 104/1000 gal & 50% load factor Steam Electricity
33.0 400 kw @ 0.018 $/kw hr Building Services Other TOTAL 0 AND M ANNUAL COST 69.3 C r I. 2. 3. 4..0 0 S.C
K Description of Augment K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT.
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS 600-ft 3 Waste Gas Decay Tank' (Sheet 1)I TFM LABOR DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS
TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT
2.5 20 22.5 600-ft 3 , 150 pslgo C.S., ASME VIII BUILDING ASSIGNMENT
18.0 9 27.0 15' x 15' x 20' @ S6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 1.0 1 2.0 10% of item 1 INSTRUMENTATION
AND CONTROLS neg ELECTRICAL
SERVICE neg SPARE PARTS neg SUBTOTAL 21.5 30 51.5 CONTINGENCY
2.0 3 5.0 10% TOTAL DIRECT COSTS 23.5 33 56.5 K I
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 600-ft 3 Waste Gas Decay ITEM LABOR Tank (Sheet 2) COST (1975 $1000)OTHER TOTAL OPERATING
LABOR, SUPERVISION, AND OVERHEAD neg MAINTENANCE
MATERIAL AND LABOR neg CONSUMABLES, CHEMICALS, AND SUPPLIES neg UTILITIES
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND N ANNUAL COST neg I. 2. 3. 4.FflR 0 U' 0~e 5.(
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM Description of Augment IT"M 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS PWR Hydrogen Recombiner (Sheet 1)IARno 50.0 DIRECT COST (1975 $1000)
TAI TflTAI I l :fTI b V VT nA. I 300.0 350.0 BASIS FOR rnqT vtTTMATF skid mounted, catalytic type w/condenser, partial I&C single unit, ASME VIII BUILDING ASSIGNM4ENT
28.8 14.4 43.2 15' x 30' x 16' 0 $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 32.0 13.0 45.0 allowance INSTRUMENTATION
AND CONTROLS 10.0 40.0 50.0 allowance ELECTRICAL
SERVICE 13.0 12.0 25.0 allowance SPARE PARTS -2.0 2.0 SUBTOTAL 133.8 381.4 515.2 CONTINGENCY
13.0 38.0 51.0 101 TOTAL DIRECT COSTS 146.8 419.4 566.2 K a Ue ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADtWASTE
TREAThENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment PUR Hydrogen Recombiner (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCEMATERIAL
AND. 10.0 3% of equipment cost LABOR CONSUMABLES, CHEMICALS, AND 1.0 oxygen @.S2.5/103 cf & .25 cfm 0 SUPPLIES 7000 hrs UTILITIES
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 14.3 1. 2. 3. 4.Ca I U'S.K C
Description of Augment ITEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS PWR Air EJector Charcoal/HEPA
Filtration Unit (Sheet 1)LABOR 3.0 DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS
7.5 TOTAL 10.5 1*BASIS FOR COST ESTIMATE chiller, heater, charcoal HEPA BUILDING ASSIGNMENT
3.0 1.5 4.5 10' x 10' x 15' @ $3/ft 3 (unshielded turbine bldg) ASSOCIATED
PIPING SYSTEMS 2.0 1.0 3.0 allowance INSTRUMENTATION
AND CONTROLS 0.5 1.5 2.0 allowance ELECTRICAL
SERVICE 0.5 0.5 1.0 allowance SPARE PARTS 1.0 1.0 SUBTOTAL 9.0 13.0 22.0 CONTINGENCY
1.0 1.0 2.0 1O0 TOTAL DIRECT COSTS 10.0 14.0 24.0
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augnent PWR Air EJector Charcoal/HEPA
Filtration Unit (Sheet 2)COST (1975 $1000)ITEM LARAR___ .....________________
I , L ueA5 rwK Guil r.4IrMIE OPERATING
LABOR, SUPERVISION, 3.8 15 min/shift
+ 40 hr annual test AND OVERHEAD MAINTENANCE
MATERIAL AND 2.0 includes replacement filter LABOR CONSUMABLES, CHEMICALS, AND -in item 2 SUPPLIES UTILITIES
AND SERViCES Waste Disposal neg Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 5.8 flTIFD TnTAI l. 2. 3. 4.EP U'5.K DAete K K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment ITEM Steam Generator Flash LABOR Tank Vent to Main Condenser (Sheet DIRECT COST (1975 $1000) EQUIPMENT/MATERIALS
1)TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT
-no equipment required BUILDING ASSIGNMENT
neg install In existing space ASSOCIATED
PIPING SYSTEMS 13 7 20 200 ft of 10-in pipe with 2 valves INSTRUMENTATION
AND CONTROLS 4 6 10 allowance ELECTRICAL
SERVICE neg SPARE PARTS neg SUBTOTAL 17,, 13 30 CONTINGENCY
2 1 3 10% TOTAL DIRECT COSTS 19 14 33 I.U't ull 2. 3. 4. 5. 6.7. 8.
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREAThENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Steam.Generator Flash Tank Vent to Main Condenser (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, 1 allowance AND OVERHEAD MAINTENANCE
MATERIAL AND 1 2% Total Direct Cost LABOR CONSUHABLES, CHEMICALS, AND neg SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water neg Steam Electricity Building Services Other TOTAL 0 AND H ANNUAL COST 2 1. 2. 3. 4..a U'5.((
K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment lSqpm Evaporator (Sheet 1)I AnRO DIRECT COST (1975 $1000)PROCESS EQUIPMENT
30 225 255 skid mounted, submerged tube bundle, ASME VIII, Incoloy in contact with process fluid BASIS FOR
2. BUILDING ASSIGNMENT
68 34 102 evap & services 25' x 301 x 20' @ $6/ft3 plus 2,000 ft3 increase in solid waste storage area ASSOCIATED
PIPING SYSTEMS 35 30 65 inludes service piping INSTRUMENTATION
AND CONTROLS 10 10 20 allowance ELECTRICAL
SERVICE 40 25 65 allowance SPARE PARTS -27 27 2% of item 1 plus tube bundle SUBTOTAL 183 351 534 CONTINGENCY
18 35 53 10% TOTAL DIRECT COSTS 201 386 587 ITI'N 1.a.3. 4. 5. 6. 7. 8.
Description of Augment tTrW TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREAThENT'SYSTEM
FOR LIGHT-WdATER-COOLED
NUCLEAR REACTORS 30-gpm Evaporator (Sheet 2) , BASIS FOR rncT rCY?UAYT*.- -..rw-f .dV..r b.r ...I u snlrl.# ,nI .bl r~l) I lruI 1. PROCESS EQUIPMENT
2. BUILDING ASSIGNMgNT
30 t 88 350 44 380 132 ASME VIII skid mounted, submerged, 'tube bundle, Incoloy in contact with process fluid evap + services -25' x 40' x 20' @ $6/ft 3 plus 2,000 ft 3 Increase In solid waste storage area ASSOCIATED
PIPING SYSTEMS 35 35 70 includes service piping INSTRUMENTATION
AND CONTROLS 10 10 20 allowance ELECTRICAL
SERVICE 40 25 65 allowance SPARE PARTS 27 27 2% of Item 1 plus tube bundle SUBTOTAL 203 491 694 CONTINGENCY
20 49 69 1O0 TOTAL DIRECT COSTS 223 540 763 C C I AfPtflD DIRECT COST (1975 $1000) rfIITDfMlrTIMATrDTAI
TnTA, CO 3. 4. 5. 6. 7. 8.
K FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 50-qpm Evaporator (Sheet 3)ITEM 1. PROCESS EQUIPMENT 2. 3. 4. S. 6. 7. 8.LABOR 30 DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS
450 TOTAL 480 BASIS FOR COST ESTIMATE ASME VIII skid mounted, submerged, tube bundle, Incoloy In contact with process fluid BUILDING ASSIGNMENT
97 48 145 10% more than 30 gpm ASSOCIATED
PIPING SYSTEMS 35 35 70 allowance INSTRUMENTATION
AND CONTROLS 10 10 20 allowance ELECTRICAL
SERVICE 40 25 65 allowance SPARE PARTS. 27 27 2% of Item 1 plus tube bundle SUBTOTAL 212 595 807 CONTINGENCY
21 60 81 10% TOTAL- DIRECT COSTS 233 655 888 T TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMErNT
SYSTEM'III a Description of Augment 50-gpm Evaporator (Sheet 3)
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment
-RUR Dirty Ua~tm-Finn, £1 COST (1975 $1000)ITEM LABOR OT14ER TOTAL BASIS FOR LOST FSTIMATF OPERATING
LABOR, SUPERVISION, 12 2.6 x 106 gpy; 1000 hrs/yr labor AND OVERHEAD MAINTENANCE
MATERIAL AND 30 7-1/2% of equipment cost LABOR CONSUMABLES, CHEMICALS, AND neg concentrate solidification chemicats SUPPLIES in item 4 UTILITIES
AND SERVICES Waste Disposal 70 100:1 feed to concentrate ratio @ 20/ft 3 disposal cost Water 27 1000 gpm @ 1500 hrs @ 30t/1000 gal Steam 60 1500 hrs steaw @ 20,000 lb/hr @ $2/1000 lbs Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 199 C C 1. 2. 3. 4. 5.
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Evaporator PWR DirtylT YM[AROR Waste (Sheet 5) COST (1975 $1000)OTHER TOTAL BASIS FOR COST ESTTMATE OPERATING
LABOR, SUPERVISION, AND OVERHEAD 6.0 500,000 gpy; 500 hrs/yr labor MAINTENANCE
MATERIAL AND LABOR 30.0 7-1/2% of equipment cost CONSUMABLES, CHEMICALS, AND -concentrate solidification chemicals SUPPLIES in item 4 UTILITIES
AND SERVICES 50:1 feed to concentrate ratio @ $20/ft 3 Waste Disposal 27.0 disposal cost Water 5.0 1000 gpm @.277 hrs @ 30t/1000 gal Steam 12.0 277 hrs steam @S 20,000 4bs/hr @ $2/1000 lbs Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 80.0 ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT K I. 2. 3. 4.0'5.
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment EvaDorator
-Condenser Polisher Chemical IaCto Ih +0 A COST (1975 $1000)ITEMFR CS UK LU ETIMATE OPERATING
LABOR, SUPERVISION, AND OVERHEAD 6.0 650.000 gpy; 500 hr/yr labor MAINTENANCE
MATERIAL AND LABOR 30.0 7-1/2% of equipment cost CONSUMABLES, CHEMICALS.
AND concentrate solidification chemicals SUPPLIES In item 4 UTILITIES
AND SERVICES Waste Disposal 87.0 20:1 feed to concentrate ratio @ $20/ft 3 Wl7.0 disposal cost Water 6.5 1000 gpm 0 360 hrs @ 30*/10OO gal Steam 14.4 360 hrs steam @ 20,000 lb/hr @ $2/1000 lbs Electricity Building Services Other LABOR 0ATD AU TC4TAI TOTAL 0 AND M ANNUAL COST 143.9 C 0 1. 2. 3. 4. 5.(v K SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment-hla~aum*., Um.4.a Iqkaa÷ COST (1975. $1000)TT!M LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, AND OVERHEAD 6.0 160,000 gpy; 500 hrs/yr MAINTENANCE
MATERIAL AND LABOR 30.0 7-1/25 of equipment cost CONSUMABLES, CHEMICALS, AND -concentrate solidification chemicals In SUPPLIES item 4 UTILITIES
AND SERVICES Waste ITsposal 8.6 50:1 feed to concentrate ratio 0 $20/ft 3 disposal cost Water 1.6 1000 gpm 0 90 hrs 0 30t/1000 gal Steam 3.6 90 hrs steam 0 20,000 lb/hr 1 $2/1000 lbs Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 49.8 ANNUAL OPERATING
AND MAI[NTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT K I. 2. 3. 4.ad a, LeD 5.
Description of Augment TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Evaporator Distillate Demineralizer (Sheet 1)TTIrM I anAD DIRECT COST (1975 $1000) EniI nlrT IUA?~nAi e*,-. I.rluvn Iuu~rnllu~r'¶l KhMiLR IJI/L W,5MII EIHMAIT PROCESS EQUIPMENT
4.0 20.0 24.0 30 ft 3 , SS. ASME VIII, 150 psi nonregenerative, w/resin BUILDING ASSIGNMENT
6.4 3.2 9.6 10' x 10' x 16' @ $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 9.0 6.0 15.0 2" piping INSTRUMENTATION
AND CONTROLS 2.0 3.0 5.0 remote conductivity readout ELECTRICAL
SERVICE neg SPARE PARTS 1.0 1.0 SUBTOTAL 21.4 33.2 54.6 CONTINGENCY
2.0 3.0 5.0 10% TOTAL DIRECT COSTS 23.4 36.2 59.6 BASIS FOR C (1. 2.i Ot 3. 4. 5. 6. 7. 8.(qrft*IrA I
)K SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Evaporator Distillate Demineralizer (Sheet 2) COST (1975 $1000)YtM I ARnlQ OTHER TOTAL BASIS FOR COST ESTIMATE aI1II ____________
OPERATING
LABOR, SUPERVISION.
1.8 1500 hrs operation
@ 10% attendance AND OVERHEAD MAINTENANCE
MATERIAL AND LABOR 2.0 allowance CONSUMABLES, CHEMICALS, AND SUPPLIES 2.3 1 change per yr @ $75/ft 3 UTILITIES
AND SERVICES Waste Disposal 0.6 30 ft 3 @ $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 6.7 ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT I. 2. 3. 4.,ap 5.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 50-opDemintralzer Sh t 1)ITEM LAROR DIRECT COST (1975 $1000) 1ITOM AUIFRAI It TIhTAI BASIS FOR CflCY 1T tMAr" PROCESS EQUIP4ENT
5 20.0 25.0 30 ft 3.SS, VIII. 150 psi, nonreganerative, with resin BUILDING ASSIGNMENT
9 4.8 13.8 12' x 12' x 16' 0 $6/ft 3 (shielded ASSOCIATED
PIPING SYSTEMS 9 6.0 15.0 2" piping INSTRUMENTATION
AND CONTROLS 4 6.0 10.0 ELECTRICAL
SERVICE No SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 27 38.8 66.8 CONTINGENCY
2 4.0 6.0 10% TOTAL DIRECT COSTS 29 42.8 -71.8 C 1. 2. 3. 4. 5. 6. 7. 8.(C SO-gin
{Sheet 1)
K Description of Augment K TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS 1O0-9pm Deminerallizer (Sheet 2) LANOR DIRECT COST (1975 $1000) PMFNT/MATFRTALS
TOTAL BASIS FOR COST FSTTMATF PROCESS EQUIPMENT
5 35.0 40.0 60 ft 3 , SS, ASME VIII, 150 psi, nonregenerative, with resin BUILDING ASSIGNMENT
9 4.8 13.8 12' x 12' x 16' 0 $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 10 10.0 20.0 2-1/21 piping INSTRUMENTATION
AND CONTROLS 4 6.0 10.0 ELECTRICAL
SERVICE neg SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 28 57.8 85.8 CONTINGENCY
3 6.0 9.0 TOTAL DIRECT COSTS 31 63.8 94.8 I. 2. 3." 4. 5.a, 6. 7. B.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWAST!E
TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 20-plDmneralizer(Sheet
3)__ITEM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.LABOR 5 1T A DIRECT COST (1975 $1000) EflUIPI4FNTII4ATFRTAL 60.0 TflTAI 65.0 BASIS FOR rnCT r~tTuATr 120 ft 3 , SS, ASME VIII, i50 psi, nonregenerative, with resin BUILDING ASSIGNMENT
11 5.2 16.2 13' x 13' x 16' 0 $6/ft 3 ___(shielded area) ASSOCIATED
PIPING SYSTEMS 12 12.0 24.0 4" piping INSTRUMENTATION
AND CONTROLS 4 6.0 10.0 ELECTRICAL
SERVICE neg SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 32 85.2 117.2 CONTINGENCY
3 9.0 12.0 TOTAL DIRECT COSTS 35 94.2 129.2 ((200-gpm Oemtneraltzer (Sheet 3)
K Description of Augment 400-gpm Demineralizer
-Steam Generator Blowdown Service (Sheet 4)I TrM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.lAROR DIRECT COST (1975 $1000) EOUJIPMNT/MATERjALS
TOTAL BASIS FOR COST ESTIMATE T I COST ESTIMATE 5 60.0 65.0 120 ft 3 , SS. ASME VIII, 150 psi, nonregenerative.
with resin BUILDING ASSIGNMENT
11 5.2 16.2 ,3' x 13' x 16' @ $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 20 20.0 40.0 6" piping INSTRUMENTATION
AND CONTROLS 4 6.0 10.0 allowance ELECTRICAL
SERVICE neg SPARE PARTS 2.0 2.0 miscellaneous supplies SUBTOTAL 40 93.2 133.2 CONTINGENCY
4 9.0 13.0 TOTAL DIRECT COSTS 44 102.2 146.2 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS a, 'a ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment BWR-2nd Waste Demineralizer In Serf es (Sheet El COST (1975 $1000)ITEM_...._-_....__,,__ ,v-n -DROIO rvr uK EV)lr.1 ~PY.I OPERATING
LABOR, SUPERVISION, 3.3 15 min/shift AND OVERHEAD MAINTENANCE
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND 9.0 1 change per year @ 120 ft 3 0 $75/ft 3 (one SUPPLIES vessel change per year. regardless of size) UTILITIES
AND SERVICES Waste Disposal 2.4 120 ft 3 lyr * $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 19.7 1. 2. 3. 4.a -.J a 5.C lABOR NTNrD TJlTA!
K ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Demineralizer
-PWR Clean Wastes (Sheet 6) COST (197k. $1000)YY IPLu I flTurD?linI matie fflS EflM? rCTTMATe AILr IlV% -lll_ __ _ Ifl, &'flC I l nV bl *fll OPERATING
LABOR, SUPERVISION, 1.8 10% of DRS shim bleed (50,000 gpy), AND OVERHEAD 30 min/day MAINTENANCE
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND 3 3 SUPPLIES 2.3 30 ft /yr @ $75/ft3 UTILITIES
AND SERVICES Waste Disposal 0.6 30 ft 3/yr @ $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 9.7 I 1. 2. 3. 4.a S.
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADIASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Demineralizer
-BWR Dirty Waste (Sheet 7)COST (1975 $1000)JTFN[ABDR nlTHVg TNlT61 DACIC mnD r.ncT reTvUnt OPERATING
LABOR, SUPERVISION, AND OVERHEAD 6.5 2.6 x 106 gpy, 30 min/shift MAINTENANCE
MATERIAL AND LABOR 5.0 allowance CONSUNABLES, CHEMICALS, AND33 SUPALES 64.5 860 ft 3 resin 0 $75/ft 3 UTILITIES
AND SERVICES Waste Disposal 17.2 860 ft 3 @ $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND N ANNUAL COST 93.2 C I. 2. 3. 4.N S.---I C
K ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Demineraltzer
-PWR Dirty.Wastes (w/o turbine building) (Sheet 8) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, AND OVERHEAD 3.3 500,000 gpy; 15 min/shift MAINTENANCE
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND SUPPLIES 12.0 160 ft 3/yr @ $75/ft 3 UTILITIES
AND SERVICES Waste Disposal 3.2 160 ft 3/yr @ $20/ft 3 disposal cost water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 23.5 l. 2. 3. 4.a 5./
ANNUAL OPERATIN AND
COST ESTIMTE SHEET OF RADWASTE TREATMENT
of Aujnmant flminapA147AP
.DUo*7m,
- pww-ITEM T. -a .* C1 *fm r uVfm "a 1.411W4b 7I COST (1975 $1000)--______ .... ..-. ",,' ,,,. urwl, rvuK I.UF)I LtIY:llrl OPERATING
LABOR, SUPERVISION.
AND OVERHEAD 13.1 1 hr/shift, 2.6 x 106 opy MAINTENANCE
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AND SUPPLIES 64.5 660 ft 3 resin 0 $75/ft 3 UTILITIES
AND SERVICES Waste Disposal 17.2 860 ft 3/yr 9 $20/ft 3 disposal cost Water Steam Electricity Building Services Other TOTAL 0 AND N ANNUAL COST 99.8 I ARMR flTIIFA 1. 2. 3. 4.a S.(r SYSTEM FOR L.IGHT, oWATER-COOLEO
NUCL..EAR,, REACTORS oAeTe -1-:j:.1i-:i...-
..........
-."(
K Description of Augment Demineralizer
-PIER tim Steam Generator Blowdomn (Sheet 10) COST (1975 $1000)nyu,..O inaI OPERATING
LABOR, SUPERVISION.
AND OVERHEAD 3.3 15 min/shift MAINTENANCE
MATERIAL AND LABOR 5.0 allowance CONSUMABLES, CHEMICALS, AN" SUPPLIES 16.9 225 ft 3 resin/yr @ $75/ft 3 UTILITIES
AND SERVICES Waste Disposal 4.5 225 ft 3/Yr I $20/ft 3 disposal cost Water Stem Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 29.7 A..UAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS 2. 3. 4.ens rtnt ReTtMAta a I alLfl9 S.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 20-qp Cartridge Filter (Sheet 1)TTFM I DIRECT COST (1975 $1000) vN Itur ¶ u'IIAqr rD lr e... t.J UIhLU 11MAT PROCESS EQUIPMENT
2.0 5.0 7.0 SS, ASME VIII, 150 psi BUILDING ASSIGNMENT
5.6 3.0 8.6 16' x 12' x 20' S $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 1.5' 1.0 2.5 allowance INSTRUMENTATION
AND CONTROLS 0.6 2.4 3.0 allowance ELECTRICAL
SERVICE neg SPARE PARTS 0.5 0.5 SUBTOTAL 9.7 11.9 21.6 CONTINGENCY
1.0 1.0 2.0 10% TOTAL DIRECT COSTS 10.7 12.9 23.6 BASIS FOR-.4 Q at 1. 2. 3. 4. 5. 6. 7. 8.(20-qm Cartrtd9e Ftlter (Sheet 1)
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Cartridge Filter (Sheet 2) COST (1975 $1000)A'1JCDl RAM!S FOR COST ESTIMATE ITEM LADUK uini n , -... ...... .... ... .. OPERATING
LABOR. SUPERVISION, 4.5 10 changes @ 10 man-hrs/change AND OVERHEAD @ $12/hr + 15 min/shift MAINTENANCE
MATERIAL AND LABOR 1.0 allowance CONSUMABLES.
CHEMICALS, AND SUPPLIES 1.0 10 changes/yr
@ $100/change UTILITIES
AND SERVICES Waste Disposal 1.5 10 drums/yr @ $20/ft 3 Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST 8.0 1. 2. 3. 4. 5.
TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREAT1ENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 100-gpim Precoat Filter (Shoot 1)ITEM LARnR DIRECT COST (1975 $1000) fIW01T P~NT uI~dTIDTAI
PROCESS EQUIPMENT
10 65.0 75 automated system 1 gpm/ft 2 , ASM4E VIII BUILDING ASSIGNMENT
18 9.0 27 15' x 15' x 20' 0 $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEM4S 16 9.0 25 35% of equipment cost INSTRUMENTATION
AND CONTROLS in item 1 ELECTRICAL
SERVICE 7 13.0 20 allowance SPARE PARTS 2.0 2 2% of item 1 SUBTOTAL 51 98.0 149 CONTINGENCY
5 10.0 15 10% TOTAL DIRECT COSTS 56 108.0 164 BASIS FOR 0 1. 2. 3. 4. 5. 6. 7. 8.(r i lO0-gpm Precoat Ftlter (Sheet 1)
K FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 400-oam Precoat Filter T LAROR DIRECT COST (1975 $1000) EOUIPMENT/MATERIALS
TOTAL BASIS FOR COST ESTIMATE PROCESS EQUIPMENT
35 135.0 170 automated system; 1 gpm/ft 2 ASME Viii BUILDING ASSIGNMENT
24 12.0 36 15' x 20' x 20' @ $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 31 16.0 47 35% of equipment cost INSTRUMENTATION
AND CONTROLS --item I ELECTRICAL
SERVICE 12 18.0 30 allowance SPARE PARTS -3.0 3 SUBTOTAL 102 184.0 286 CONTINGENCY
10 18.0 28 10% TOTAL DIRECT COSTS 112 202.0 314 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM K (Sheet 2)-J 1. 2. 3. 4. 5. 6. 7. 8.(Sheet 2)-vT
ANNUAL OPERATING
AND MAINTENANCE
COST ESTI1ATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Precoat Filter -BWR Dirty Waste (Sheet 3) COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST !STTI4ATF OPERATING
LABOR, SUPERVISION, AND OVERHEAD 6.6 2 x 106 gpy, 30 min/shift MAINTENANCE
MATERIAL AND LABOR 10.0 allowance CONSUMABLES, CHEMICALS, AND 6.0 10 lbs precoat @ lOt/lb per 1000 gal SUPPLIES processed
4. UTILITIES
AND SERVICES Waste Disposal Water Steam Electricity Building Services Other 40.0 TOTAL 0 AND M ANNUAL COST j[ 62.6 1 ft 3/sludge per disposal cost 1000 qal processed
@ $30/ft 3 C 1. 2. 3.S.(
T TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 2-com Reverse TTIFM LABOR DIRECT COST (1975 $1000) FOUlPMENTIMATFRIALS
TOTAL BASIS FOR COST ESTIMATF PROCESS EQUIPIENT
6.0 60.0 66.0 skid mounted w/500-gal SS feed tank, ASME VIII BUILDING ASSIGNMENT
19.2 9.6 28.8 12' x 25' x 16' @ $6/ft 3 ASSOCIATED
PIPING SYSTEMS 3.0 2.0 5.0 allowance INSTRUMENTATION
AND CONTROLS in item I ELECTRICAL
SERVICE 7.0 13.0 20.0 allowance SPARE PARTS 6.0 6.0 SUBTOTAL 35.2 90.6 125.8 CONTINGENCY
3.0 9.0 12.0 10% TOTAL DIRECT COSTS 38.2 99.6 137.8 K 0 1. 2. 3. 4. 5. 6. 7. 8.Osmosis (Sheet 1)
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment Reverse Osmosis -Detergent Wastes COST (1975 $1000)ITEM LABOR OTHER TOTAL BASIS FOR COST ESTIMATE OPERATING
LABOR, SUPERVISION, AND OVERHEAD 3.1 160.000 gpy, 1300 hrs/yr @ 20% attendance MAINTENANCE
MATERIAL AND 8.8 4% less bldg + 24 module with 3-yr life LABOR @ $600 each CONSUMABLES, CHEMICALS.
AND SUPPLIES neg UTILITIES
AND SERVICES Waste Disposal 4.3 100:1 vol reduction
@ $20/ft 3 disposal cost Water Steam Electricity neg Building Services Other TOTAL 0 AND M ANNUAL COST 16.2 r C 1. 2. 3. 4.No 5.(
FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 1O,000-Gallon Tank__(Sheet
1)?tTrM 1. PROCESS EQUIPMENT 2. 3. 4. 5. 6. 7. 8.I AROR 3 DIRECT COST (1975 $1000) !0IJ!P?4fNT/MATERIALS
TOTAL T -28 31 BASIS FOR COST ESTIMATE SS, ASME VIII, atmospheric service, 200°F BUILDING ASSIGNMENT
30 15 45 15' x 20' x 25' @ $6/ft 3 (shielded area) ASSOCIATED
PIPING SYSTEMS 2 1 3 10% of item 1 INSTRUMENTATION
AND CONTROLS 4 6 10 allowance ELECTRICAL
SERVICE neg SPARE PARTS neg SUBTOTAL 39 s0 89 CONTINGENCY
4 5 9 10% TOTAL DIRECT COSTS 43 55 98 C w 10tOOO-GallonTapk (Sheet 1)TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREAThENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment 10000-Gallon Tank (Sheet 2) COST (1975 $1000)ITEM LABOR OTHER TOTAL RA~l flD OPERATING
LABOR, SUPERVISION.
AND OVERHEAD 1.1 5 min/shift
-log level readings MAINTENANCE
MATERIAL AND LABOR 1.6 1/2% of equipment CONSUMABLES.
CHEMICALS, AND neg SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water Steam neg Electricity Building Services Other TOTAL 0 AND N ANNUAL COST 2.7 1. 2. 3. 4. 5.(
REFERENCES
TO APPENDIX B 1. "Guide for Economic Evaluation of Nuclear Reactor Plant Oesigns," USAEC Report NUS-531, NUS Corporation, January 1969. 2. "Wage Rates for Key Construction Trades," Engineering News Record, pp. 36-37, January 2, 1975. 3. "Projections of Labor Requirements for Electric Power Plants Construction, 1974 -2000," USAEC Report WASH-1334, Washington, D.C., August 1974.1.110-85 APPENDIX C DATA NEEDED FOR RADIIASTE
TREATMENT
SYSTEM COST-BENEFIT
ANALYSIS FOR LIGHT-WATER
COOLED NUCLEAR REACTORS This appendix describes information that should be submitted in support of radwaste treat ment system cost-benefit analyses for light-water-cooled nuclear reactors.
The information should be consistent with the contents of the Safety Analysis Report (SAR) and Environmental Report (ER) for the proposed reactor. Appropriate sections of the SAR and ER containing more detailed discussions of the required information should be referenced as appropriate.
Each response, however, should be Independent of the ER and SAR. All responses should be on a per reactor basis and should provide the following information:
1. Detailed cost estimate sheets similar to those shown on the following pages listing all parameters (and their bases) used in determining capital, operating, and maintenance costs associated with all augments considered in the cost-benefit analysis.
All costs should be stated in terms of 1975 dollars.
2. The cost of borrowed money used in the cost analysis and the method of arriving at this cost. 3. If methods and parameters used in the cost-benefit analysis are different from those aiven in this guide, describe the methods used in detail and provide bases for all parameters.
Include the following information:
a. Decontamination factors assigned to each augment and fraction of "on-line" time assumed, i.e., hours per year used. b. Parameters and method used to determine the Indirect Cost Factor and the Capital Recovery Factor.1.110-87 TOTAL DIRECT COST ESTIMATE SHEET OF RADWASTE'TREATMENT-SYSTEH
FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS Description of Augment i Tru 1 AflfD DIRECT COST (1975 $1000) FflIIIPMFNT/MATFRlALS
1. PROCESS EQUIPMENT
2. BUILDING ASSIGNMENT
t I 1 I I I I I ASSOCIATED
PIPING SYSTEMS BASIS FOR COST ESTIMATE I I I I --INSTRUMENTATION
AND CONTROLS I I I I ELECTRICAL
SERVICE I I I I 6. SPARE PARTS______________________I
i mI SUBTOTAL________________________________________________________
1 -I I I CONTINGENCY
I I I TOTAL DIRECT COSTS________________________________________________________
________________
I __________________________________________________
_____________
_______________________________________________
C TOTAL 0 3. 4. S.7. 8.(C i aunD EnUTPMENTIMATERIALS
ANNUAL OPERATING
AND MAINTENANCE
COST ESTIMATE SHEET OF RADWASTE TREATMENT
SYSTEM FOR LIGHT-WATER-COOLED
NUCLEAR REACTORS 0 "I U 2 2 -4 U 2 2 C, a 9 9 'a w -J 04 0.j 'a "4 a. 0 "4 COST (1975 $1000)I TIFM
1. OPERATING
LABOR, SUPERVISION, AND OVERHEAD MAINTENANCE
MATERIAL AND LABOR CONSUMABLES, CHEMICALS, AND SUPPLIES UTILITIES
AND SERVICES Waste Disposal Water Steam Electricity Building Services Other TOTAL 0 AND M ANNUAL COST LABOR OTHER TOTAL BASIS FOR COST ESTIMATE Description of Augment U K 2. 3. 4. 5.ITEM