Information for "PNO-III-86-104, on 860923,unit Shutdown at 4:08 Am,To Investigate Cause of High Bearing Temp on One of Recirculation Pumps.Vendor Insp Determined That Some Cells, Which Supply Control Power to Hpic Sys Valves Be Degraded"
Jump to navigation
Jump to search
View the protection log for this page.
Basic information
Display title | PNO-III-86-104, on 860923,unit Shutdown at 4:08 Am,To Investigate Cause of High Bearing Temp on One of Recirculation Pumps.Vendor Insp Determined That Some Cells, Which Supply Control Power to Hpic Sys Valves Be Degraded |
Default sort key | PNO-III-86-104, on 860923,unit Shutdown at 4:08 Am,To Investigate Cause of High Bearing Temp on One of Recirculation Pumps.Vendor Insp Determined That Some Cells, Which Supply Control Power to Hpic Sys Valves Be Degraded |
Page length (in bytes) | 4,583 |
Page ID | 1090320 |
Page content language | en - English |
Page content model | wikitext |
Indexing by robots | Allowed |
Number of redirects to this page | 2 |
Counted as a content page | Yes |
Page protection
Edit | Allow all users (infinite) |
Move | Allow all users (infinite) |
Edit history
Page creator | StriderTol (talk | contribs) |
Date of page creation | 09:54, 21 January 2021 |
Latest editor | StriderTol (talk | contribs) |
Date of latest edit | 09:54, 21 January 2021 |
Total number of edits | 1 |
Total number of distinct authors | 1 |
Recent number of edits (within past 90 days) | 0 |
Recent number of distinct authors | 0 |
Page properties
Transcluded templates (13) | Templates used on this page:
|