TXX-6016, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design.Initially Reported on 850918.Possible Conduit Orientation Problems Studied.Cable Slack & conduit- to-equipment Studies Underway.Next Rept Expected by 861215: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 July 2023