Pages that link to "TXX-6016, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design.Initially Reported on 850918.Possible Conduit Orientation Problems Studied.Cable Slack & conduit- to-equipment Studies Underway.Next Rept Expected by 861215"
Jump to navigation
Jump to search
The following pages link to TXX-6016, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design.Initially Reported on 850918.Possible Conduit Orientation Problems Studied.Cable Slack & conduit- to-equipment Studies Underway.Next Rept Expected by 861215:
Displayed 2 items.
- ML20203P028 (redirect page) (← links)
- TXX-6016 (redirect page) (← links)
- TXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212 (← links)
- TXX-6016, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design.Initially Reported on 850918.Possible Conduit Orientation Problems Studied.Cable Slack & conduit- to-equipment Studies Underway.Next Rept Expected by 861215 (← links)