PY-CEI-NRR-0493, Forwards Perry Nuclear Power Plant Control Room Validation Summary Rept, Per Section 2.7 of Suppl 1 to Dcrdr.Submittal Re Control Room Review Process,Required Prior to Issuance of Full Power Ol,Completed: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

21 July 2023