PNO-V-88-036, on 880607,voters Voted on Two Measures Re Future Operations of Plant.Measure B,Which Required Immediate Shutdown of Plant,Failed to Pass.Measure C,Which Will Continue Plant Operations on Trial Basis,Passed: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.