PNO-III-87-060A, on 870427,reactor Entered 72 H Tech Spec Action Statement.Caused by Inoperable Shutdown Condenser Inlet Valve 1B.Licensee Plans to Reduce Power from 98% on 870429 & Complete Permanent Shutdown on 870430: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

19 April 2021