PNO-III-86-104, on 860923,unit Shutdown at 4:08 Am,To Investigate Cause of High Bearing Temp on One of Recirculation Pumps.Vendor Insp Determined That Some Cells, Which Supply Control Power to Hpic Sys Valves Be Degraded: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

21 January 2021