PNO-II-80-150, on 801013,during Routine Check of Unit 2 Containment Purge Valve 5,purge Path Opened to Environ for 46 S.Caused by Failure to Follow Procedures in Proper Sequence.No Tech Spec Limits Exceeded.State of Sc Informed: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

30 December 2020

13 December 2020