Mid cycle letter: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

28 June 2023

  • curprev 13:4813:48, 28 June 2023StriderTol talk contribs 1,166 bytes 0 No edit summary
  • curprev 13:4813:48, 28 June 2023StriderTol talk contribs 1,166 bytes +1,166 Created page with "The '''mid cycle report''' reports the NRC's future inspection plans and any special inspection plans. It is a summary report from the NRC to a licensee half way through the year (Jan-June). Usually received in September. It is very similar in substance to the end of cycle report. It is always labeled: <pre>docket/YYYY'''006'''</pre> ==Cancelling the Mid-Cycle Letter== * Reference: inspection report::IR 05000333/2016005, Mid-Cycle Assessment Letter for James A...."