L-76-277, Proposed Amendment to Facility Operating License DPR-67. Proposed Change Concerns Technical Specification Concerning an Unfavorable Power Distribution Which Has Led to a Delay in Power Ascension Testing: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.