End of cycle letter: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

28 June 2023

  • curprev 14:4914:49, 28 June 2023StriderTol talk contribs 646 bytes +646 Created page with "The '''end of cycle report''' reports the NRC's future inspection plans and any special inspection plans. It is a summary report from the NRC to a licensee half way through the year (July-Dec). Usually received in March. It is very similar in substance to the mid cycle report. It is always labeled: <pre>docket/YYYY'''006'''</pre> ==See also== * Mid cycle report * NRC Report 22 - The reports for inspection plans ==historical notes== Was previously labeled..."