05000483/LER-2022-002, Forward LER 2022-002-00 for Callaway Plant, Unit 1, Containment Spray and Cooling Systems, and a Condition Which Could Have Prevented Fulfillment of the Safety Function of the Containment Spray System (Letter Only): Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

16 September 2022