ZS-2014-0079, Annual Property Insurance Status Report

From kanterella
Jump to navigation Jump to search
Annual Property Insurance Status Report
ML14083A405
Person / Time
Site: Zion  File:ZionSolutions icon.png
(DPR-039, DPR-048)
Issue date: 03/18/2014
From: Gerard van Noordennen
ZionSolutions
To:
Document Control Desk, NRC/FSME
References
ZS-2014-0079
Download: ML14083A405 (2)


Text

ZIONSOLUTIONSUC An ErgySduuo/bru Company 10 CFR 50.54(w)(3)

March 18, 2014 ZS-2014-0079 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units I and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

Annual Property Insurance Status Report

Reference:

Letter from Dino C. Scaletti, United States Nuclear Regulatory Commission, "Zion Nuclear Power Station, Units 1 and 2 - Exemption from Requirements of 10 CFR 50.54(w) and 10 CFR 140.11," dated December 21, 1999 As required by 10 CFR 50.54, "Conditions of licenses," paragraph (w)(3), ZionSolutions, LLC is required each year to report to the NRC the current levels and sources of insurance that demonstrates it possesses sufficient financial resources to stabilize and decontaminate a reactor and reactor station site in the event of an accident. In accordance with 10 CFR 50.54(w)(3), this report is required to be submitted on April 1 st of each year.

To satisfy the reporting requirements of 10 CFR 50.54(w)(3), ZionSolutions, LLC is submitting the following status of nuclear property insurance currently maintained for Zion Nuclear Power Station.

Facility Total Coveraige Zion Nuclear Power Station

$50 million The insurance maintained is provided through an insurance policy purchased from Nuclear Electric Insurance Limited through Exelon Generation Company, LLC.

The above insurance policy provides coverage that satisfies the criteria specified in 10 CFR 50.54(w). The coverage reflects an exemption from the requirements of 10 CFR 50.54(w) regarding the amount of onsite property insurance. The exemption was granted by the NRC in light of the permanently shutdown status of Zion Nuclear Power Station.

If you have any questions regarding this letter, please contact me at (224) 789-4025.

Respectfully, Gerard van Noordennen Vice President Regulatory Affairs cc:

John Hickman, U.S. NRC Senior Project Manager Service List 101 Shiloh Boulevard, Zion -IL 60099

,,4 /

(224) 789-4016

  • Fax: (224) 789-4008. www.zionsolutionscompany.com 1A

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Alan Parker President Projects Group EnergySolutions 1009 Commerce Park Drive, Ste. 100 Oak Ridge, TN 37830 John Sauger Sr. VP & General Manager ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Gerard van Noordennen VP Regulatory Affairs ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Gary Bouchard VP Ops, Engineering, and Decommissioning Plant Manager ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Dan Shrum Sr. VP Regulatory Affairs EnergySolutions 423 West 300 South, Ste. 200 Salt Lake City, UT 84101 Russ Workman General Counsel EnergySolutions 423 West 300 South, Ste. 200 Salt Lake City, UT 84101 Alwyn C. Settles Section Head, Nuclear Facility Inspection Bureau of Nuclear Facility Safety Illinois Emergency Management Agency 1011 North St., PO Box 250 Mazon, IL 60444 Kent McKenzie Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Libertyville, IL 60048-1308 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004