WO 02-0057, October 2002 Monthly Operating Report for Wolf Creek Generating Station
| ML023240394 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 11/07/2002 |
| From: | Jacobs D Wolf Creek |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| WO 02-0057 | |
| Download: ML023240394 (3) | |
Text
.WLF CREEK
'NUCLEAR OPERATING CORPORATION Donna Jacobs Plant Manager NOV 7 2002 WO 02-0057 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: October, 2002, Monthly Operating Report Gentlemen:
Attached to this letter -is the October, 2002, Monthly Operating Report for the Wolf Creek Generating-Station.
This submittal is being made in -accordance with the requirements of Wolf Creek Generating Station Technical Specification 5.6.4, "Monthly Operating Reports." This submittal also follows -the guidance of Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."- If you have questions regarding this report, please contact me at (620) 364-4246, or Mr. Tony Harris at (620) 364-4038.
Very truly yours, Do lýia acbs DJ/rlg Attachment cc:
J. N.-Donohew (NRC), w/a
-D. N.-Graves (NRC), w/a "E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), w/a
-P.O. Box 411 Burlington, KS 66839 / Phone- (620) 364-8831 An Equal Opportunity Employer M/F/IHCNET
Attachment to WO 02-0057 Page 1 of 2 OPERATING DATA REPORT Report Number: 212 DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station November 5, 2002 J. L. Yunk (620) 364-4272 REPORT MONTH: October, 2002
- 1. IDesign Electrical Rating (MWe - Net):
I 1170
- 2.
Maximum Dependable Capacity (MWe - Net):
1170 This Month Year to Date Cumulative
- 3.
Number of Hours Reactor Critical:
745.0 6,307.1 128,671.8
- 4.
Number of Hours Generator On-Line:
745.0 6,231.6 127,481.8
- 5.
Unit Reserve Shutdown Hours:
0.0 0.0 339.8
- 6.
Net Electrical Energy Generated (MWH) 886,975 7,295,664 144,332,666 Wolf Creek Generating Station Monthly Operating Report October, 2002 Page 1 of 2
Attachment to WO 02-0057 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station November 5, 2002 J. L. Yunk (620) 364-4272 The unit operated in Mode 1, 100% power, from October 1, 2002, through October 31, 2002.
A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD: 1. MANUAL
- 2. MANUAL SCRAM
- 3. AUTOMATIC SCRAM
- 4. CONTINUATION
- 5. OTHER Wolf Creek Generating Station Monthly Operating Report October, 2002 Page 2 of 2
SUMMARY
Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.
Date
&: SCHEDULED (Hours)
(1)
(2)
(1) REASON: